|
Format |
Size |
Posted |
|
|
|
| English |
Word
|
48761 bytes |
2026-10-01 |
[279] Annex 11
- Review of Recommendations under the purview of Working Party 7B |
| |
Word
|
41464 bytes |
2026-10-01 |
[279] Annex 10
- Review of Study Group 7 Questions assigned to Working Party 7B |
| |
Word
|
2363526 bytes |
2026-10-01 |
[279] Annex 9
- Preliminary draft revision of Report ITU-R SA.2488-0 - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies |
| |
Word
|
6263103 bytes |
2026-09-29 |
[279] Annex 8
- Working document toward a preliminary draft new Report ITU-R SA.[EESS UPLINKS-23GHZ] - Potential future EESS (Earth-to-space) in the 22.55-23.15 GHz band |
| |
Word
|
85169 bytes |
2026-09-29 |
[279] Annex 7
- Working document toward a preliminary draft revision of Recommendation ITU-R SA.514-3 - Interference criteria for command and data transmission systems operating in the Earth exploration-satellite and meteorological-satellite services |
| |
Word
|
263640 bytes |
2026-09-29 |
[279] Annex 6
- Working document towards a preliminary draft new Report ITU-R SA.[EESS-DOWNLINKS-37.5 TO 52.4 GHZ] - Potential future EESS (space-to-Earth) in the frequency range [37.5-52.4 GHz] |
| |
Word
|
39771 bytes |
2026-09-29 |
[279] Annex 5
- Revised work plan for WRC-27 agenda item 1.15 and Resolution 680 (WRC-23) |
| |
Word
|
69842 bytes |
2026-09-29 |
[279] Annex 4 - Part 1
|
| |
Word
|
9442548 bytes |
2026-09-29 |
[279] Annex 4
- Preliminary draft new Report ITU-R SA.[LUNAR 1.15 STUDIES] - Sharing studies of space research systems for lunar operations under WRC-27 agenda item 1.15 |
| |
Word
|
75623 bytes |
2026-09-29 |
[279] Annex 3
- Working document toward preliminary draft new Report ITU-R SA.[FUTURE LUNAR COMMUNICATION AND SYSTEMS STUDY] - Communication needs for future lunar vicinity activities beyond space research and consideration of associated radiocommunication services and sufficiency of existing regulatory provisions |
| |
Word
|
152964 bytes |
2026-10-02 |
[279] Annex 2
- Draft CPM text for WRC-27 agenda item 1.15 |
| |
Word
|
45645 bytes |
2026-09-22 |
[279] Annex 1
- Draft CPM texts for information only in Sections A1/2.10 and A1/2.11 of Annex 1 to the draft CPM Report, in relation to WRC-31 preliminary agenda items 2.10 and 2.11
|
|
|