International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP7B : Contributions : 279 Recently posted -  Search Meeting Documents
   
[279]  Report of the meeting of Working Party 7B (Geneva, 14-24 September 2026)

Format

Size

Posted

English

Word  

48761 bytes 2026-10-01 [279] Annex 11 - Review of Recommendations under the purview of Working Party 7B

Word  

41464 bytes 2026-10-01 [279] Annex 10 - Review of Study Group 7 Questions assigned to Working Party 7B

Word  

2363526 bytes 2026-10-01 [279] Annex 9 - Preliminary draft revision of Report ITU-R SA.2488-0 - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies

Word  

6263103 bytes 2026-09-29 [279] Annex 8 - Working document toward a preliminary draft new Report ITU-R SA.[EESS UPLINKS-23GHZ] - Potential future EESS (Earth-to-space) in the 22.55-23.15 GHz band

Word  

85169 bytes 2026-09-29 [279] Annex 7 - Working document toward a preliminary draft revision of Recommendation ITU-R SA.514-3 - Interference criteria for command and data transmission systems operating in the Earth exploration-satellite and meteorological-satellite services

Word  

263640 bytes 2026-09-29 [279] Annex 6 - Working document towards a preliminary draft new Report ITU-R SA.[EESS-DOWNLINKS-37.5 TO 52.4 GHZ] - Potential future EESS (space-to-Earth) in the frequency range [37.5-52.4 GHz]

Word  

39771 bytes 2026-09-29 [279] Annex 5 - Revised work plan for WRC-27 agenda item 1.15 and Resolution 680 (WRC-23)

Word  

69842 bytes 2026-09-29 [279] Annex 4 - Part 1

Word  

9442548 bytes 2026-09-29 [279] Annex 4 - Preliminary draft new Report ITU-R SA.[LUNAR 1.15 STUDIES] - Sharing studies of space research systems for lunar operations under WRC-27 agenda item 1.15

Word  

75623 bytes 2026-09-29 [279] Annex 3 - Working document toward preliminary draft new Report ITU-R SA.[FUTURE LUNAR COMMUNICATION AND SYSTEMS STUDY] - Communication needs for future lunar vicinity activities beyond space research and consideration of associated radiocommunication services and sufficiency of existing regulatory provisions

Word  

152964 bytes 2026-10-02 [279] Annex 2 - Draft CPM text for WRC-27 agenda item 1.15

Word  

45645 bytes 2026-09-22 [279] Annex 1 - Draft CPM texts for information only in Sections A1/2.10 and A1/2.11 of Annex 1 to the draft CPM Report, in relation to WRC-31 preliminary agenda items 2.10 and 2.11
 

Document :

ITU-R R23-WP7B  Contribution  279

Title :

Report of the meeting of Working Party 7B (Geneva, 14-24 September 2026)

Date :

2026-09-22

Source :

Chair, WP 7B

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2026-10-13