|
Format |
Size |
Posted |
|
|
|
| English |
Word
|
49150 bytes |
2026-03-26 |
[237] Annex 12
- Review of Recommendations under the purview of Working Party 7B |
| |
Word
|
1738955 bytes |
2026-03-26 |
[237] Annex 11
- Preliminary draft new Report ITU-R SA.[EESS NGS 7-8GHZ] - Evolution of Earth exploration-satellite service systems in the 7 190-7 250 and 8 025-8 400 MHz frequency bands |
| |
Word
|
50895 bytes |
2026-03-27 |
[237] Annex 10
- Preliminary draft new Recommendation ITU-R SA.[2.0 GHZ SRS & EESS CHAR] - Technical and operational characteristics of the space research service systems in the 2 025-2 120 MHz and Earth exploration-satellite service systems in the 2 025-2 110 MHz frequency band to be used for assessing interference and for conducting sharing and compatibility studies |
| |
Word
|
117941 bytes |
2026-03-26 |
[237] Annex 9
- Preliminary draft revision of Recommendation ITU-R SA.2169-0 - Technical and operational characteristics of the space operation service (SOS) systems that use the 2 025-2 110 MHz (Earth-to-space) (space-to-space) and 2 200-2 290 MHz (space-to-Earth) (space-to-space) frequency bands for use in assessing of interference and for conducting sharing studies |
| |
Word
|
63456 bytes |
2026-03-26 |
[237] Annex 8
- Working document toward a preliminary draft revision of Recommendation ITU-R SA.514-3 - Interference criteria for command and data transmission systems operating in the Earth exploration-satellite and meteorological-satellite services |
| |
Word
|
166741 bytes |
2026-03-26 |
[237] Annex 7
- Working document in support of possible Report ITU-R SA.[EESS-DOWNLINKS-37.5 TO 52.4 GHZ] - Potential future EESS (space-to-Earth) in the frequency range [37.5-52.4 GHz] |
| |
Word
|
2312553 bytes |
2026-03-26 |
[237] Annex 6
- Preliminary draft revision of Report ITU-R SA.2488-0 - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies |
| |
Word
|
130302 bytes |
2026-03-25 |
[237] Annex 5
- Working document in support of possible Report ITU-R SA.[EESS UPLINKS-23GHZ] - Potential future EESS (Earth-to-space) in the 22.55-23.15 GHz band |
| |
Word
|
36066 bytes |
2026-03-25 |
[237] Annex 4
- Revised work plan for WRC-27 agenda item 1.15 and Resolution 680 (WRC-23) |
| |
Word
|
68132 bytes |
2026-03-25 |
[237] Annex 3
- Working document toward preliminary draft new Report ITU-R SA.[FUTURE LUNAR COMMUNICATION AND SYSTEMS STUDY] - Radiocommunication needs for future lunar vicinity activities beyond space research and consideration of associated radiocommunication services and sufficiency of existing regulatory provisions |
| |
Word
|
5259891 bytes |
2026-03-30 |
[237] Annex 2
- Working document towards a preliminary draft new Report ITU-R SA.[LUNAR 1.15 STUDIES] - Sharing studies of space research systems for lunar operations under WRC-27 agenda item 1.15 |
| |
Word
|
145525 bytes |
2026-03-25 |
[237] Annex 1
- Document towards draft CPM text for WRC-27 agenda item 1.15 |
|
|