Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 53 ]
|
Reply liaison statement to Working Party 7A - Potential sharing of EESS (passive) with the standard frequency and time signal service in the 4 GHz band with regards to WRC-27 agenda item 1.19
|
WP 7C
|
AI1.19
|
2025-04-07 |
|
[ 52 ]
|
Liaison statement to ITU-R Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2025-04-01 |
|
[ 51 ]
+Ann.1-2 |
Report on the meeting of Working Party 7A (Geneva, 17-21 March 2025)
|
Acting Chair, WP 7A
|
|
2025-03-21 |
|
[ 50 ]
|
Final list of participants - Working Party 7A (Geneva, 17-21 March 2025)
|
Director, BR
|
|
2025-03-21 |
|
[ 49 ]
|
List of documents issued - (Documents 7A/38 - 7A/49)
|
BR, Study Groups Department
|
|
2025-03-17 |
|
[ 48 ]
|
Proposed modifications and additions to the working document towards a draft revision of Recommendation ITU-R TF.460-6 - Standard frequency and time signal emissions
|
France
|
|
2025-03-05 |
|
[ 47 ]
|
Proposed draft revision of the Handbook: Selection and use of precise frequency and time systems - Revision of Chapter 7 Uses of frequency sources - proposal from France
|
CG on Revision and update of Selection and use of precise frequency and time systems Handbook
|
|
2025-03-04 |
|
[ 46 ]
|
Proposed draft revision of the Handbook: Selection and use of precise frequency and time systems - Revision of Chapter 5 Time Scales - proposal from France
|
CG on Revision and update of Selection and use of precise frequency and time systems Handbook
|
|
2025-03-04 |
|
[ 45 ]
|
Report of the Working Party 7A Correspondence Group on revision and update of selection and use of precise frequency and time systems Handbook
|
CG on Revision and update of Selection and use of precise frequency and time systems Handbook
|
|
2025-03-05 |
|
[ 44 ]
|
Reply liaison statement to ITU-R Working Party 7B (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 7B answers to questions related to WRC-27 agenda item 1.15
|
WP 3J
|
AI1.15
|
2025-02-25 |
|
[ 43 ]
|
Liaison statement to CISPR/H (copy for information to ITU-R Study Group 1 and Working Parties 1A, 5A and 7A) - Update to broadcasting services protection requirements in the CISPR radio services database
|
WP 6A
|
|
2024-11-18 |
|
[ 42 ]
|
Reply liaison statement to ITU-T Study Group 15 on the role of powerline telecommunications in home-networking (copy to ITU-T Study Group 5 and ITU-R Working Parties 1A, 5C, 6B, 7A and 7D for information)
|
WP 6A
|
|
2024-11-18 |
|
[ 41 ]
|
Reply liaison statement to ITU-R Working Party 3J (copied for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Response to Working Party 3J questions related to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-09-30 |
|
[ 40 ]
|
Liaison statement to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D - Report on progress of activities relating to WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-09-30 |
|
[ 39 ]
|
Reply liaison statement to Working Party 7B (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7A and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 7D
|
AI1.15
|
2024-09-30 |
|
[ 38 ]
+Ann.1-2 |
Report on the meeting of Working Party 7A (Almaty, Kazakhstan, 16-20 September 2024)
|
Acting Chair, WP 7A
|
|
2024-09-21 |
|
[ 37 ]
|
Final list of participants - Working Party 7A (Almaty, Kazakhstan, 16-20 September 2024)
|
Director, BR
|
|
2024-09-21 |
|
[ 36 ]
|
List of documents issued (Documents 7A/13 - 7A/36)
|
BR, Study Groups Department
|
|
2024-09-13 |
|
[ 35 ]
|
Report of the Working Party 7A Correspondence Group on Revision and update of Selection and use of precise frequency and time systems Handbook
|
CG on Revision and update of Selection and use of precise frequency and time systems Handbook
|
|
2024-09-04 |
|
[ 34 ]
|
Proposed modification and additions to the working document towards a preliminary draft new Report ITU-R TF.[UTC_DISSEMINATION] - Content and structure of time signals to be disseminated by radiocommunication systems, including wired technologies
|
France
|
|
2024-09-04 |
|
[ 33 ]
|
Draft liaison statement to Working Party 7B - Information on the standard frequency and time signal service with regards to WRC-23 agenda item 1.15 on lunar communications
|
United States
|
AI1.15
|
2024-09-03 |
|
[ 32 ]
|
Draft liaison statement to Working Party 5B - Information on the standard frequency and time signal service with regards to WRC-23 agenda item 1.9 on the modernization of Appendix 26
|
United States
|
AI1.9
|
2024-09-03 |
|
[ 31 ]
|
Draft liaison statement to Working Party 4A - Information regarding the standard frequency and time signal-satellite service for WRC-23 agenda item 1.2 on smaller antenna sizes for FSS uplinks at 14 GHz
|
United States
|
AI1.2
|
2024-09-03 |
|
[ 30 ]
|
Elements towards a work plan for the revision of Recommendation ITU-R TF.460-6 - Standard-frequency and time-signal emissions
|
United States
|
|
2024-09-03 |
|
[ 29 ]
|
Views on modification to Recommendation ITU-R TF.460-6
|
China
|
|
2024-09-02 |
|
[ 28 ]
|
Draft reply liaison statement to ITU-R Working Party 1A (copy to ITU-R Working Parties 5A, 5B, 5C and 6A) - Revisions of Recommendation ITU-R SM.2110-1, Reports ITU-R SM.2449-1 and ITU-R SM.2451-1 - ITU-R Working Party 7A
|
ATDI
|
|
2024-08-30 |
|
[ 27 ]
|
Draft revision of Recommendation ITU-R V.431-8 - Nomenclature of the frequency and wavelength bands used in telecommunications
|
ATDI
|
|
2024-07-26 |
|
[ 26 ]
|
Information on the preparation of texts for the draft CPM Report to WRC-27
|
Chair, CPM-27
|
|
2024-07-09 |
|
[ 25 ]
|
Reply liaison statement to Working Parties 5A, 5B, 5C, 6A and 7A - Revision of Report ITU-R SM.2449-0 and Recommendation ITU-R SM.2129-0 regarding wireless power transmission for mobile and portable devices
|
WP 1A
|
|
2024-07-03 |
|
[ 24 ]
|
Reply liaison statement to Working Party 7A - Wireless Power Transmission (WPT) for Electric Vehicles
|
WP 1A
|
|
2024-07-03 |
|
[ 23 ]
|
Reply liaison statement to Working Party 5B (copy to Working Parties 5C, 6A and 7A for information) - WRC-27 agenda item 1.9
|
WP 3L
|
AI1.9
|
2024-06-13 |
|
[ 22 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 5A, 5B, 5C, 7A, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2
|
WP 3M
|
AI1.2
|
2024-06-12 |
|
[ 21 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D) - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 3J
|
AI1.15
|
2024-06-12 |
|
[ 20 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 1B, 3J, 4A, 4C, 5A, 5B, 5D, 7A, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.15
|
WP 5C
|
AI1.15
|
2024-05-29 |
|
[ 19 ]
|
Liaison statement to ITU-R Working Parties 3L, 5C, 6A and 7A (copy to ICAO for information) - Request for relevant technical information to support studies under WRC-27 agenda item 1.9 in order to review Appendix 26 of the Radio Regulations to support modernization of high-frequency spectrum use in the aeronautical mobile (OR) service
|
WP 5B
|
AI1.9
|
2024-05-28 |
|
[ 18 ]
|
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 5A, 5C, 7A, 7B and 7C) - Relevant technical information to support studies under WRC-27 agenda item 1.2
|
WP 5B
|
AI1.2
|
2024-05-21 |
|
[ 17 ]
|
Liaison statement to Working Parties 3M, 5B, and 7B (copy to Working Parties 5A, 5C, 7A and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2
|
WP 4A
|
AI1.2
|
2024-05-13 |
|
[ 16 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
|
Chair, CCV
|
|
2024-04-22 |
|
[ 15 ]
|
Liaison statement for action to Working Parties 3J, 4A, 4C, 5A, 5B, 5C, 5D, 7A, 7C and 7D, and for information to Working Party 1B - Relevant technical information to support studies under WRC-27 agenda item 1.15
|
WP 7B
|
AI1.15
|
2024-03-27 |
|
[ 14 ]
|
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 5C, 5D, 7A and 7B (copy to ICAO for information) - WRC-27 agenda item 1.19
|
WP 7C
|
AI1.19
|
2024-03-25 |
|
[ 13 ]
+Ann.1-3 |
Report of the meeting of Working Party 7A (Geneva, 19-22 March 2024)
|
Acting Chair, WP 7A
|
|
2024-03-22 |
|
[ 12 ]
|
Final list of participants - Working Party 7A (Geneva, 19-22 March 2024)
|
Director, BR
|
|
2024-03-22 |
|
[ 11 ]
|
List of documents issued (Documents 7A/1 - 7A/11)
|
BR, Study Groups Department
|
|
2024-03-19 |
|
[ 10 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 3L, 5C and 7A) - Protection requirements for the HF broadcasting service relative to WRC-27 agenda item 1.9
|
WP 6A
|
AI1.9
|
2024-03-18 |
|
[ 9 ]
|
Liaison statement to ITU-T Study Group 15 (copy to ITU-T Study Group 5 and ITU-R Working Parties 1A, 5A, 5C, 6B, 7A, 7C and 7D for information) - Role of powerline telecommunications in home-networking
|
WP 6A
|
|
2024-03-18 |
|
[ 8 ]
|
Revision of the Chapter 3 of the ITU-R Handbook - Selection and use of precise frequency and time systems
|
Bureau International des Poids et Mesures (BIPM)
|
|
2024-03-06 |
|
[ 7 ]
|
Proposed preliminary draft revised Recommendation ITU-R TF.460-6 - Standard-frequency and time-signal emissions
|
France
|
Q236/7
|
2024-03-07 |
|
[ 6 ]
|
Proposed draft revision of the Handbook - Selection and use of precise frequency and time systems - Chapter 4 - Measurement techniques (Metrology)
|
France
|
|
2024-03-07 |
|
[ 5 ]
|
Proposed template for the working document towards a preliminary draft new Report ITU-R TF.[UTC_DISSEMINATION] - Content and structure of time signals to be disseminated by radiocommunication systems, including wired technologies
|
France
|
Q236/7
|
2024-03-07 |
|
[ 4 ]
|
Proposed draft revision of the Handbook - Selection and use of precise frequency and time systems
|
Germany
|
|
2024-03-06 |
Results:53 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):