|
Format |
Size |
Posted |
|
|
|
| English |
Word
|
34256 bytes |
2025-11-17 |
[186] Annex 13
- Final list of participants |
| |
Word
|
34317 bytes |
2025-11-17 |
[186] Annex 12
- List of documents issued and treated |
| |
Word
|
34207 bytes |
2025-11-17 |
[186] Annex 11
- Work plan for the fifty-seventh meeting of Working Party 4B (22-28 October 2025) |
| |
Word
|
37600 bytes |
2025-11-17 |
[186] Annex 10
- Draft liaison statement to Working Party 4A on material for the Handbook on Satellite Communications and Technologies |
| |
Word
|
36032 bytes |
2025-11-17 |
[186] Annex 9
- [Draft] reply liaison statement to ITU-T Working Party 1/13 on consent for various components of draft new Recommendation from ITU-T - Consent of new Recommendations of ITU-T Working Party 1/13 |
| |
Word
|
8937993 bytes |
2025-10-30 |
[186] Annex 8 - Part 6
- (9) Ground Subsystems - Design and technology |
| |
Word
|
58554 bytes |
2025-10-30 |
[186] Annex 8 - Part 5
- Annex A - List of Acronyms and Abbreviations |
| |
Word
|
58388 bytes |
2025-10-30 |
[186] Annex 8 - Part 4
- (12) Communication Satellite Reliability |
| |
Word
|
770376 bytes |
2025-10-30 |
[186] Annex 8 - Part 3
- (11) Communication Satellite Link Performance |
| |
Word
|
6872752 bytes |
2025-10-30 |
[186] Annex 8 - Part 2
- (10) Launch Vehicles |
| |
Word
|
11517752 bytes |
2025-10-30 |
[186] Annex 8 - Part 1
- (8) Space Segment Subsystems - Design and technology |
| |
Word
|
24907135 bytes |
2025-11-18 |
[186] Annex 8
- Handbook on Satellite Communications and Technologies |
| |
Word
|
36454 bytes |
2025-10-31 |
[186] Annex 7
- Discussion on satellite link availability and performance objectives |
| |
Word
|
49073 bytes |
2025-10-31 |
[186] Annex 6
- Working document towards a preliminary draft new Report ITU-R M.[MSS_OBP] |
| |
Word
|
44912 bytes |
2025-10-31 |
[186] Annex 5
- Contribution to working document towards a preliminary draft new Report on Development and technology of emergency communications in Mobile-Satellite Service |
| |
Word
|
640575 bytes |
2025-10-31 |
[186] Annex 4
- Working document towards a preliminary draft new Report ITU-R M.[SAT IOT] - Technical and operational aspects of satellite Internet of Things (IoT) applications |
| |
Word
|
182041 bytes |
2025-10-31 |
[186] Annex 3
- Preliminary draft new Report on development and technology trends for the satellite component of IMT towards 2030 and beyond |
| |
Word
|
37465 bytes |
2025-10-31 |
[186] Annex 2
- Working document towards a preliminary draft new Report ITU-R M.[IMT-2030-SATELLITEREQ-EVAL-SUB] - Technical performance requirements, evaluation methodology, and submission templates for the satellite radio interface(s) of IMT-2030 |
| |
Word
|
54940 bytes |
2025-10-31 |
[186] Annex 1
- Working document towards a preliminary draft new ITU-R Report on a framework for satellite radio interface(s) of IMT-2030 |
| |
Word
|
65232 bytes |
2025-11-17 |
[186]
- Report on the fifty-seventh meeting of Working Party 4B (Geneva, 22-28 October 2025) |
|
|