|
Format |
Size |
Posted |
|
|
|
| English |
Word
|
54842 bytes |
2026-11-10 |
[1284] Annex 41
- Elements with regard to identification of frequency assignments to space stations operating under RR No. 4.4 |
| |
Word
|
228137 bytes |
2026-11-05 |
[1284] Annex 16
- Draft CPM text on WRC-27 agenda item 7, Topic E - Potential regulatory improvements related to the application of Radio Regulations No. 4.4 to frequency assignments to stations of space services |
| |
Word
|
450520 bytes |
2026-11-05 |
[1284] Annex 15
- Draft CPM text for WRC-27 agenda item 7, Topic D - Revision of Resolution 553 (Rev.WRC-23)
|
| |
Word
|
169403 bytes |
2026-11-05 |
[1284] Annex 14
- Draft CPM text for WRC-27 agenda item 7, Topic C - Revision of Resolution 170 (Rev.WRC-23) |
| |
Word
|
112301 bytes |
2026-11-05 |
[1284] Annex 13
- Draft CPM text for WRC-27 agenda item 7, Topic B |
| |
Word
|
61097 bytes |
2026-11-04 |
[1284] Annex 12
- Draft CPM text for WRC-27 agenda item 7, Topic A - Proposed modifications to Appendix 4 |
| |
Word
|
167171 bytes |
2026-11-04 |
[1284] Annex 11
- Draft CPM text for WRC-27 agenda item 1.6 |
| |
Word
|
169363 bytes |
2026-11-05 |
[1284] Annex 10
- Draft CPM text for WRC-27 agenda item 1.5 |
| |
Word
|
4200959 bytes |
2026-11-04 |
[1284] Annex 9
- Working document on WRC-27 agenda item 1.4 |
| |
Word
|
315949 bytes |
2026-11-04 |
[1284] Annex 8
- Draft CPM text for WRC-27 agenda item 1.4 |
| |
Word
|
16183121 bytes |
2026-11-04 |
[1284] Annex 7
- Working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space) |
| |
Word
|
168506 bytes |
2026-11-05 |
[1284] Annex 6
- Draft CPM text for WRC-27 agenda item 1.3 |
| |
Word
|
1450901 bytes |
2026-11-03 |
[1284] Annex 5 Part 5
|
| |
Word
|
21849891 bytes |
2026-11-03 |
[1284] Annex 5 Part 4
|
| |
Word
|
11433033 bytes |
2026-11-03 |
[1284] Annex 5 Part 3
|
| |
Word
|
43660928 bytes |
2026-11-03 |
[1284] Annex 5 Part 2
|
| |
Word
|
16170003 bytes |
2026-11-03 |
[1284] Annex 5 Part 1
|
| |
Word
|
4246452 bytes |
2026-11-03 |
[1284] Annex 5
- Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space) |
| |
Word
|
222493 bytes |
2026-11-03 |
[1284] Annex 4
- Draft CPM text for WRC-27 agenda item 1.2 |
| |
Word
|
172358 bytes |
2026-11-03 |
[1284] Annex 3
- Working document related to a preliminary draft new Recommendation ITU-R S.[ESIM-NCMC] - The functionalities and implementation of a network control and monitoring centre for earth stations in motion |
| |
Word
|
25605912 bytes |
2026-11-03 |
[1284] Annex 2
- Supporting material for draft CPM text on WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service |
| |
Word
|
150602 bytes |
2026-11-03 |
[1284] Annex 1
- Draft CPM text on WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service |
|
|