ITU Sectors
Newsroom
Events
Publications
Statistics
About ITU
 
Office of the Secretary General
Office of the Secretary General
Office of the Secretary General
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Standardization (ITU-T)
Standardization (ITU-T)
Standardization (ITU-T)
Development (ITU-D)
Development (ITU-D)
Development (ITU-D)
ITU TELECOM
ITU TELECOM
ITU TELECOM
 
Calendar of Events
Calendar of Events
Calendar of Events
Today's Meetings 
Today's Meetings 
Today's Meetings 
Internet Webcast Service 
Internet Webcast Service 
Internet Webcast Service 
Search 
Search 
Search 
 
All Sectors
All Sectors
All Sectors
ITU-R
ITU-R
ITU-R
ITU-T
ITU-T
ITU-T
ITU-D
ITU-D
ITU-D
General Secretariat
General Secretariat
General Secretariat
 
ITU Publications 
ITU Publications 
ITU Publications 
Publications by Sector
Publications by Sector
Publications by Sector
 
General Secretariat and ITU Telecom
General Secretariat and ITU Telecom
General Secretariat and ITU Telecom
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Standardization (ITU-T)
Standardization (ITU-T)
Standardization (ITU-T)
Development (ITU-D)
Development (ITU-D)
Development (ITU-D)
 
International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP4A : Contributions : 343 Recently posted -  Search Meeting Documents
   
[343]  Report on the fifty-fifth meeting of Working Party 4A (Geneva, 21-31 October 2024)

Format

Size

Posted

English

Word  

65966 bytes 2024-11-29 [343] Annex 47 - Working document towards a preliminary draft new Report - Maximum permissible levels of off-axis e.i.r.p. density from non-axially symmetric or active phased array earth station antennas transmitting to geostationary-satellite orbit networks operating in the fixed-satellite service in the 27.5-30 GHz frequency band

Excel 2007  

2081137 bytes 2024-11-29 [343] Annex 46 - Part 2

Excel 2007  

1378295 bytes 2024-11-29 [343] Annex 46 - Part 1

Word  

5027878 bytes 2024-11-29 [343] Annex 46 - Preliminary draft new Recommendation ITU-R S.[RES 770] - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks in Q/V band with criteria contained in No. 22.5L of the Radio Regulations

Word  

48442 bytes 2024-11-18 [343] Annex 45 - Note from the Chair of Working Party 4A to the Chair of CPM-27 (Copy to the Chairs of Study Groups 4, 7 and Working Party 7C) - WRC-27 agenda item 1.19

Word  

36447 bytes 2024-11-18 [343] Annex 44 - Note from the Chair of Working Party 4A to the Chair of CPM-27 (copy to the Chairs of Study Groups 4, 5 and Working Party 5D) - WRC-27 agenda item 1.7

Word  

37197 bytes 2024-11-18 [343] Annex 43 - Document on contributions and proposals by ATU and African administrations

Word  

43580 bytes 2025-02-14 [343] Annex 42 - Revision 1 - List of requests to the Bureau

Word  

2486376 bytes 2024-11-18 [343] Annex 41 - Working document towards preliminary draft new Report ITU-R S.[FUSELAGE ATTENUATION] - Simulation results of fuselage attenuation for Aeronautical Earth Stations In Motion (A-ESIM) in the 27.5-29.5 GHz band

Word  

123393 bytes 2024-11-20 [343] Annex 40 - Draft reply liaison statement to Working Party 5D - Relevant technical information to support studies under WRC-27 agenda item 1.7

Word  

104026 bytes 2024-11-18 [343] Annex 39 - Draft reply liaison statement to Working Party 7C - Technical and operational characteristics of FSS systems for sharing and compatibility studies on WRC-27 agenda item 1.19

Word  

419688 bytes 2024-11-18 [343] Annex 38 - Working document towards a preliminary draft new revision of Recommendation ITU-R S.1586 - Calculation of unwanted emission levels produced by a non geostationary fixed-satellite service system at radio astronomy sites

Word  

88429 bytes 2024-11-18 [343] Annex 37 - Working document towards a preliminary draft new revision of Recommendation ITU-R BO.1504 - Effective utilization of spectrum assigned to the broadcasting satellite service (sound)

Word  

3092739 bytes 2024-11-18 [343] Annex 36 - Working document towards a preliminary draft revision to Report ITU-R BO.2029 - Broadcasting-satellite service earth station antenna pattern measurements and related analyses

Word  

339856 bytes 2024-11-18 [343] Annex 35 - Working document towards a preliminary draft new Recommendation - Maximum allowable aggregate interference levels from time-variant sources from other services into fixed-satellite service links

Word  

199066 bytes 2024-11-18 [343] Annex 34 - Supporting materials for working document towards a preliminary draft new Recommendation ITU-R S.[NGSO-MODELLING]

Word  

1241333 bytes 2024-11-18 [343] Annex 33 - Working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELLING]

Word  

6240913 bytes 2024-11-18 [343] Annex 32 - Working document towards a preliminary draft new Report ITU-R S.[INTERFERENCE-NGSO-NGSO/GSO-STUDIES]

Word  

73083 bytes 2024-11-18 [343] Annex 31 - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-GSO] -

Word  

78481 bytes 2024-11-18 [343] Annex 30 - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-NGSO] - Methodology to assess average degradation in throughput and increase in unavailability for a non-geostationary system, due to the interference caused by another non-geostationary system operating co-frequency

Word  

43614 bytes 2024-11-18 [343] Annex 29 - Detailed work plan for a revision to Recommendation ITU-R S.1503 in the period 2024-2025

Word  

323705 bytes 2024-11-18 [343] Annex 28 - Working document containing technical work relating to the GSO ES gain patterns used by Recommendation ITU-R S.1503

Word  

7817808 bytes 2024-11-20 [343] Annex 27 - Working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in RR Article 22 of the Radio Regulations

Word  

905841 bytes 2024-11-18 [343] Annex 26 - Working document towards a preliminary draft revision of Recommendation ITU-R S.1529

Word  

722687 bytes 2024-11-18 [343] Annex 25 - Working document towards a preliminary draft revision of Recommendation ITU-R S.1526-1 - Methodology to assess the interference environment in relation to Nos. 9.12, 9.12A and 9.13 of the Radio Regulations when non-geostationary-satellite orbit fixed-satellite service systems are involved

Word  

6563922 bytes 2024-11-18 [343] Annex 24 - Editorial clarifications to Recommendation ITU-R S.1503-4 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations

Word  

37087 bytes 2024-11-18 [343] Annex 23 - Resolution 76 (Rev.WRC-23) Methodology - Key challenges for discussion

Word  

1170951 bytes 2024-11-18 [343] Annex 22 - Working document towards a preliminary draft new Recommendation ITU-R S.[EXCEEDANCE EPFD KA KU] - Examples of Technical procedures for addressing any exceedance of aggregate equivalent power flux-density into geostationary satellite networks in the fixed-satellite service from multiple non-geostationary satellite systems in the Ku and Ka frequency bands in the frequency bands covered by Resolution 76 (WRC-23)

Word  

582402 bytes 2024-11-18 [343] Annex 21 - Proposed updates to working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU]

Word  

21406761 bytes 2024-11-19 [343] Annex 20 - Outcome of the SWG 4A1B work on technical studies [for information] in response to WRC-23 minutes on Article 22 epfd limits without any regulatory consequences

Word  

34546 bytes 2024-11-15 [343] Annex 19 - Draft work plan for the Handbook on Satellite Communications and Technologies

Word  

38023 bytes 2024-11-15 [343] Annex 18 - Draft Table of Contents for the Handbook on Satellite Communications and Technologies

Word  

2800578 bytes 2024-11-07 [343] Annex 17 - Elements for the a preliminary draft Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services

Word  

49473 bytes 2024-11-07 [343] Annex 16 - Working document towards a preliminary draft Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by space radiocommunication services

Word  

55443 bytes 2024-12-18 [343] Annex 15 - Revision 1 - Elements of a document towards transparency measures and improvements to the application of RR No. 4.4 to satellite services

Word  

34501 bytes 2024-11-15 [343] Annex 14 - Draft work plan for WRC-27 agenda item 7

Word  

710479 bytes 2024-11-15 [343] Annex 13 - Elements for a working document on WRC-27 agenda item 1.6

Word  

294803 bytes 2024-11-15 [343] Annex 12 - Elements of working document towards draft CPM text for WRC-27 agenda item 1.5

Word  

422014 bytes 2024-11-15 [343] Annex 11 - Elements towards a working document on WRC-27 agenda item 1.5 - Consideration of regulatory measures, and implementability thereof, to limit the unauthorized operations of non-geostationary-satellite orbit earth stations in the fixed-satellite and mobile-satellite services and associated issues related to the service area of non-geostationary-satellite orbit satellite systems in the fixed-satellite and mobile-satellite services, in accordance with Resolution 14 (WRC 23)

Word  

38411 bytes 2024-11-15 [343] Annex 10 - Draft work plan for WRC-27 agenda item 1.4

Word  

101658 bytes 2024-11-08 [343] Annex 9 - Elements for a working document towards draft CPM text for WRC-27 agenda item 1.4

Word  

236363 bytes 2024-11-08 [343] Annex 8 - Elements of working document on WRC-27 agenda item 1.4

Word  

35615 bytes 2024-11-15 [343] Annex 7 - Draft work plan for WRC-27 agenda item 1.3

Word  

43065 bytes 2024-11-15 [343] Annex 6 - Working document towards draft CPM text for WRC-27 agenda item 1.3

Word  

545817 bytes 2024-11-15 [343] Annex 5 - Elements of working document relating to WRC-27 agenda item 1.3 - Studies relating to the use of the frequency band 51.4-52.4 GHz to enable its use by gateway earth stations transmitting to non-geostationary-satellite orbit systems in the fixed-satellite service (Earth-to-space)

Word  

34244 bytes 2024-11-15 [343] Annex 4 - Working document towards draft CPM text for WRC-27 agenda item 1.2

Word  

11093719 bytes 2024-11-18 [343] Annex 3 - Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)

Word  

52611 bytes 2024-11-15 [343] Annex 2 - Elements on a working document related to the operation and functionalities of NCMC for ESIMS - The functionalities and implementation of a network control and monitoring center for Earth stations in motion

Word  

203186 bytes 2025-05-09 [343] Revision 2 - Report on the meeting of Working Party 4A

Word  

1210626 bytes 2024-11-15 [343] Annex 1 - Elements towards a working document on/working document towards preliminary draft new ITU-R Report - WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service
 

Document :

ITU-R R23-WP4A  Contribution  343

Title :

Report on the fifty-fifth meeting of Working Party 4A (Geneva, 21-31 October 2024)

Date :

2024-11-01

Source :

Chair, WP 4A

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-05-09