Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 164 ]
|
Simulations and model proposal of LoS probabilities
|
Telefon AB - LM Ericsson
|
|
2025-04-24 |
|
[ 163 ]
|
Issues with creating clutter loss models based on ray tracing - A comparison of measurements and ray tracing
|
Telefon AB - LM Ericsson
|
|
2025-04-24 |
|
[ 162 ]
|
Liaison statement on satellite to satellite free space optical communication
|
ITU-T SG15
|
|
2025-04-15 |
|
[ 161 ]
|
Liaison statement on free-space optics systems related aspects for G.fso
|
ITU-T SG15
|
|
2025-04-11 |
|
[ 160 ]
|
Liaison statement to Working Party 3J (copy to Working Parties 3M and 5B for information) - Application of Recommendation ITU-R P.2146 in studies under WRC-27 agenda item 1.19
|
WP 7C
|
AI1.19
|
2025-04-08 |
|
[ 159 ]
|
Liaison statement to Working Party 3M (copy to Working Party 3J for information) Clutter loss models applicable to studies under WRC-27 agenda item 1.19
|
WP 7C
|
AI1.19
|
2025-04-08 |
|
[ 158 ]
|
Proposed change of table keeper for Table XI-1 in DBSG3 and establishment of a new table in DBSG3 - Measurement databank for site-general propagation models in Recommendations ITU-R P.1238 and ITU-R P.1411
|
CG 3K-6
|
|
2025-03-24 |
|
[ 157 ]
+Ann.1-15 |
Report on the meeting of Working Party 3M (Geneva, 17-21 February 2025)
|
Chair, WP 3M
|
|
2025-02-17 |
|
[ 156 ]
|
Final list of participants WP 3M (Geneva, 17-21 February 2025)
|
Director, BR
|
|
2025-02-17 |
|
[ 155 ]
|
List of documents issued - (Documents 3M/106 - 3M/155)
|
BR, Study Groups Department
|
|
2025-02-17 |
|
[ 154 ]
|
Contribution to DBSG3 Table II-1: Concurrent attenuation and rainfall rate statistics in Toulouse
|
France
|
|
2025-02-05 |
|
[ 153 ]
|
Discussion document on the use of clutter loss models for sharing and compatibility studies with Earth-space and aeronautical paths and directional antennas
|
France
|
|
2025-02-05 |
|
[ 152 ]
|
Contribution to Recommendation ITU-R P.2108 and Report ITU-R P.2402 - Measurement input to Earth-to-space interference modelling
|
Telefon AB - LM Ericsson
|
|
2025-02-05 |
|
[ 151 ]
|
Simulations and model proposal of LoS probabilities
|
Telefon AB - LM Ericsson
|
|
2025-02-05 |
|
[ 150 ]
|
Clutter loss measurements with directional and omnidirectional antennas
|
United Kingdom
|
|
2025-02-05 |
|
[ 149 ]
|
Clutter loss modelling for earth-space and aeronautical propagation paths - Ofcom's preliminary investigation employing deterministic modelling for frequencies below 10 GHz
|
United Kingdom
|
|
2025-02-05 |
|
[ 148 ]
|
Purpose-built clutter maps for path specific prediction methods
|
United Kingdom
|
|
2025-02-05 |
|
[ 147 ]
|
Correlation of rain attenuation between two space stations and one location on the surface of the Earth
|
Germany
|
|
2025-02-05 |
|
[ 146 ]
|
Revision of Question ITU-R 236/3 - Use of machine learning methods for radio-wave propagation studies
|
Korea (Rep. of)
|
Q236/3
|
2025-02-05 |
|
[ 145 ]
|
Discussion document for revision to Recommendation ITU-R P.2108-1 - Prediction of clutter loss
|
Japan
|
|
2025-02-04 |
|
[ 144 ]
|
Contribution of 3.5 GHz clutter measurements to the Study Group 3 databank
|
United States
|
|
2025-02-04 |
|
[ 143 ]
|
Working document towards a preliminary draft new revision to Recommendation ITU-R P.311 - Update to Recommendation ITU-R P.311 and associated formatted tables for Lunar propagation measurement data
|
United States
|
|
2025-02-04 |
|
[ 142 ]
|
Discussion document on the comparison of NTIA/ITS 3.5 GHz clutter measurements with extrapolated Recommendation ITU-R P.2108-1 section 3.3 slant path model
|
United States
|
|
2025-02-04 |
|
[ 141 ]
|
Discussion document for human shielding loss model of Recommendation ITU-R P.1409-3 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 0.7 GHz
|
Japan
|
|
2025-02-04 |
|
[ 140 ]
|
Proposed revision to Recommendation ITU-R P.1409-3 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 0.7 GHz
|
Japan
|
|
2025-02-04 |
|
[ 139 ]
|
Modifications to the working document towards a preliminary draft revision of Recommendation ITU-R P.619-5 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth
|
Russian Federation
|
|
2025-02-03 |
|
[ 138 ]
|
Tropospheric scatter model testing and improvement
|
Australia
|
|
2025-02-03 |
|
[ 137 ]
|
Proposed revision to Recommendation ITU-R P.2108-1 - Prediction of clutter loss
|
Australia
|
|
2025-02-03 |
|
[ 136 ]
|
Correspondence Group 3K-3M-12 activity report - Clutter loss
|
Co-Chairs, CG 3K-3M-12
|
|
2025-01-27 |
|
[ 135 ]
|
Activity report of Correspondence Group 3J-3K-3L-3M-27 - Application of machine learning for propagation studies
|
Chair, CG 3J-3K-3L-3M-27
|
|
2025-01-29 |
|
[ 134 ]
|
Correspondence Group 3J-23 activity Report - General slant path terrain diffraction model
|
Chair, CG 3J-23
|
|
2025-01-28 |
|
[ 133 ]
|
Activity report of Correspondence Group 3K-3M-18 - Specific issues common to Recommendations ITU-R P.452, ITU-R P.1812, or ITU-R P.2001
|
CG 3K-3M-18
|
|
2025-01-27 |
|
[ 132 ]
|
Report on the activities of Correspondence Group 3J-3K-3M-14 - Issues relating to the HAPS propagation model
|
Chair, CG 3J-3K-3M-14
|
|
2025-01-27 |
|
[ 131 ]
|
Evaluate the impact of antenna radiation pattern and slant path clutter loss model update proposals based on latest working document 3K/77
|
China
|
|
2025-01-24 |
|
[ 130 ]
|
Performance comparison analysis of two slant path clutter loss models in working document 3K/77
|
China
|
|
2025-01-24 |
|
[ 129 ]
|
Ray-tracing-based modified Recommendation ITU-R P.2108 clutter loss model for urban scenarios below 10 GHz
|
China
|
|
2025-01-24 |
|
[ 128 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R P.2040-3 - Dielectric properties of building between 100 and 400 GHz
|
China
|
|
2025-01-23 |
|
[ 127 ]
|
Information document about hybrid path loss of clutter loss and building entry loss
|
China
|
|
2025-01-23 |
|
[ 126 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, 5D, 7B, 7C and 7D) - WRC-27 agenda item 1.6
|
WP 6A
|
AI1.6
|
2024-11-19 |
|
[ 125 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 3J, 3M, 4A, 4B, 4C, 5A, 5B, 7C and 7D) - WRC-27 agenda item 1.10
|
WP 6A
|
AI1.10
|
2024-11-19 |
|
[ 124 ]
|
Liaison statement to Working Party 7C (copy to Working Parties 3L, 3M, 4C, 5A, 5B, 5C, 5D, 7B and 7D) - WRC-27 agenda item 1.17
|
WP 6A
|
AI1.17
|
2024-11-19 |
|
[ 123 ]
|
Reply liaison statement to Working Party 3M - WRC-27 agenda item 1.4
|
WP 4A
|
AI1.4
|
2024-11-08 |
|
[ 122 ]
|
Liaison statement to working party 5B (copy to Working Parties 3M and 7B for information) - Relevant technical information to support studies under WRC-27 agenda item 1.2
|
WP 4A
|
AI1.2
|
2024-11-08 |
|
[ 121 ]
|
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1
|
WP 4A
|
AI1.1
|
2024-11-07 |
|
[ 120 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 7C and 7D) - WRC-27 agenda item 1.11
|
WP 4C
|
AI1.11
|
2024-10-22 |
|
[ 119 ]
|
Reply liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy to Working Party 5D) - WRC-27 agenda item 1.13
|
WP 4C
|
AI1.13
|
2024-10-22 |
|
[ 118 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Additional information on passive sensors in the EESS for WRC-27 agenda item 1.8
|
WP 7C
|
AI1.8
|
2024-10-01 |
|
[ 117 ]
|
Reply liaison statement to Working Party 4C (copy to the Study Group 7 Chair, the CPM Chair and to Working Parties 3L, 3M, 4B, 5A, 5C, 5D, 7B for information) - WRC-27 agenda item 1.14
|
WP 7C
|
AI1.14
|
2024-09-30 |
|
[ 116 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7
|
WP 7D
|
AI1.7
|
2024-09-30 |
|
[ 115 ]
|
Reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7 (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D)
|
WP 7B
|
AI1.7
|
2024-09-30 |
Results:164 total items. Result page:
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):