International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP3K : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP3K  C 

ITU-R R23-WP3K

Point-to-Area Propagation

Results:129 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 129 ]  
 
Simulations and model proposal of LoS probabilities     Telefon AB - LM Ericsson     2025-04-24
[ 128 ]  
 
Issues with creating clutter loss models based on ray tracing - A comparison of measurements and ray tracing     Telefon AB - LM Ericsson     2025-04-24
[ 127 ]  
 
Liaison statement to Working Party 3M (copy to Working Party 3J for information) Clutter loss models applicable to studies under WRC-27 agenda item 1.19     WP 7C     2025-04-23
[ 126 ]  
 
Proposed change of table keeper for Table XI-1 in DBSG3 and establishment of a new table in DBSG3 - Measurement databank for site-general propagation models in Recommendations ITU-R P.1238 and ITU-R P.1411     CG 3K-6     2025-03-24
[ 125 ]  
 
ETSI ISG RIS Group reports     ETSI     2025-02-25
[ 124 ]  
+Ann.1-12 
Report on the meeting of Working Party 3K (Geneva, 17-21 February 2025)     Chair, WP 3K     2025-02-17
[ 123 ]  
 
Final list of participants WP 3K (Geneva, 17-21 February 2025)     Director, BR     2025-02-17
[ 122 ]  
 
List of documents issued - (Documents 3K/77 - 3K/122)     BR, Study Groups Department     2025-02-17
[ 121 ]  
 
Liaison statement to ITU-R Study Group 3 (copy to ITU-T Study Group 5) - Definitions: List of published English terms for validation sent to the CCT for comment - "antenna-related terms"     CCT     2025-02-13
[ 120 ]  
 
Discussion document on the use of clutter loss models for sharing and compatibility studies with Earth-space and aeronautical paths and directional antennas     France     2025-02-05
[ 119 ]  
 
Contribution to Recommendation ITU-R P.2108 and Report ITU-R P.2402 - Measurement input to Earth-to-space interference modelling     Telefon AB - LM Ericsson     2025-02-05
[ 118 ]  
 
Simulations and model proposal of LoS probabilities     Telefon AB - LM Ericsson     2025-02-05
[ 117 ]  
 
Clutter loss measurements with directional and omnidirectional antennas     United Kingdom     2025-02-05
[ 116 ]  
 
Clutter loss modelling for earth-space and aeronautical propagation paths - Ofcom's preliminary investigation employing deterministic modelling for frequencies below 10 GHz     United Kingdom     2025-02-05
[ 115 ]  
 
Purpose-built clutter maps for path specific prediction methods     United Kingdom     2025-02-05
[ 114 ]  
 
Revision of Question ITU-R 236/3 - Use of machine learning methods for radio-wave propagation studies     Korea (Rep. of)   Q236/3   2025-02-05
[ 113 ]  
 
Proposed revision to Recommendation ITU-R P.1238 - Extending the indoor site-general model for frequencies above 100 GHz in office environments with additional measurement data     Korea (Rep. of) , United Kingdom     2025-02-05
[ 112 ]  
 
Proposed revision to Recommendation ITU-R P.1238-12 - A method for deriving r.m.s. delay spread parameters with omnidirectional antenna synthesis for data centre environment in 400~430 GHz band     Korea (Rep. of)     2025-02-05
[ 111 ]  
 
Proposed revision to Recommendation ITU-R P.1411-12 - Basic transmission loss measurements in urban environments for frequencies above 100 GHz     Korea (Rep. of)     2025-02-05
[ 110 ]  
 
Contribution of 3.5 GHz clutter measurements to the Study Group 3 databank     United States     2025-02-04
[ 109 ]  
 
Discussion document on the comparison of NTIA/ITS 3.5 GHz clutter measurements with extrapolated Recommendation ITU-R P.2108-1 section 3.3 slant path model     United States     2025-02-04
[ 108 ]  
 
Proposal on the update of Recommendation ITU-R P.1546 - Method for point-to-area predictions for terrestrial services in the frequency range 30 MHz to 4 000 MHz     European Broadcasting Union , LS telcom AG , Norddeutscher Rundfunk (NDR)     2025-02-05
[ 107 ]  
 
Discussion document for revision to Recommendation ITU-R P.2108-1 - Prediction of clutter loss     Japan     2025-02-04
[ 106 ]  
 
Support document for Annex 9 to Document 3K/77 - Propagation data and prediction methods required for the design of terrestrial broadband radio access systems operating in a frequency range from 3 GHz to 60 GHz     Japan     2025-02-04
[ 105 ]  
 
Contribution to the propagation databanks: basic-transmission-loss data in outdoor urban above and below rooftop environment     Japan     2025-02-04
[ 104 ]  
 
Proposed revision to Recommendation ITU-R P.1411 - Basic transmission loss and delay spread in street canyon scenarios at 154 and 300 GHz     Japan     2025-02-04
[ 103 ]  
 
300 GHz band transmission loss measurement in outdoor environment     Japan     2025-02-04
[ 102 ]  
 
Discussion document for human shielding loss model of Recommendation ITU-R P.1409-3 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 0.7 GHz     Japan     2025-02-04
[ 101 ]  
 
Proposed revision to Recommendation ITU-R P.1409-3 - Propagation data and prediction methods for systems using high altitude platform stations and other elevated stations in the stratosphere at frequencies greater than about 0.7 GHz     Japan     2025-02-04
[ 100 ]  
 
Tropospheric scatter model testing and improvement     Australia     2025-02-03
[ 99 ]  
 
Proposed revision to Recommendation ITU-R P.2108-1 - Prediction of clutter loss     Australia     2025-02-03
[ 98 ]  
 
Correspondence Group 3K-3M-12 activity report - Clutter loss     Co-Chairs, CG 3K-3M-12     2025-01-27
[ 97 ]  
 
Activity report of Correspondence Group 3J-3K-3L-3M-27 - Application of machine learning for propagation studies     Chair, CG 3J-3K-3L-3M-27     2025-01-29
[ 96 ]  
 
Activity report of Correspondence Group 3K-3M-18 - Specific issues common to Recommendations ITU-R P.452, ITU-R P.1812, or ITU-R P.2001     CG 3K-3M-18     2025-01-27
[ 95 ]  
 
Report on the activities of Correspondence Group 3J-3K-3M-14 - Issues relating to the HAPS propagation model     Chair, CG 3J-3K-3M-14     2025-01-27
[ 94 ]  
 
Correspondence Group 3K-6 activity report - Propagation models and characteristics for higher frequencies     Chair, CG 3K-6     2025-01-24
[ 93 ]  
 
Evaluate the impact of antenna radiation pattern and slant path clutter loss model update proposals based on latest working document 3K/77     China     2025-01-24
[ 92 ]  
 
Performance comparison analysis of two slant path clutter loss models in working document 3K/77     China     2025-01-24
[ 91 ]  
 
Ray-tracing-based modified Recommendation ITU-R P.2108 clutter loss model for urban scenarios below 10 GHz     China     2025-01-24
[ 90 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R P.2040-3 - Dielectric properties of building between 100 and 400 GHz     China     2025-01-23
[ 89 ]  
 
Information document about hybrid path loss of clutter loss and building entry loss     China     2025-01-23
[ 88 ]  
 
Liaison statement to key SDOs on the publication of GR THz 003 and GR THz 004     ETSI ISG THz     2025-01-23
[ 87 ]  
 
Reply liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 5A, 5B, 5C, 5D, 7C and 7D for information) - Information to support studies under WRC-27 agenda item 1.1     WP 4A   AI1.1   2024-11-07
[ 86 ]  
 
Liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7D for information) - Additional information on passive sensors in the EESS for WRC-27 agenda item 1.8     WP 7C   AI1.8   2024-10-01
[ 85 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B and 7C for information) - Relevant technical information to support studies under WRC-27 agenda item 1.7     WP 7D   AI1.7   2024-09-30
[ 84 ]  
 
Reply liaison statement to Working Party 5D on WRC-27 agenda item 1.7 (copy to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7C and 7D)     WP 7B   AI1.7   2024-09-30
[ 83 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5C and 7C for information) - Relevant technical information to support studies in preparation of WRC-27 agenda item 1.8     WP 7D   AI1.8   2024-09-27
[ 82 ]  
 
Reply liaison statement to Working Parties 3J, 3K and 3M - Relevant technical information to support studies in preparation of WRC-27 agenda items     WP 7D   AI1.8, AI1.7, AI1.3, AI1.18, AI1.17, AI1.16, AI1.15, AI1.11, AI1.10, AI1.1   2024-09-27
[ 81 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-27     Chair, CPM-27     2024-07-09
[ 80 ]  
 
Liaison statement to Working Parties 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D - WRC-27 agenda item 1.7     WP 5D     2024-07-08
Results:129 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2025-04-29