|
Format |
Size |
Posted |
|
|
|
| English |
Word
|
43197285 bytes |
2026-06-18 |
[94] Annex 4
- Working document towards a preliminary draft revision of Report ITU-R SM.2356-2 (2018) - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency range |
| |
Word
|
2761461 bytes |
2026-06-18 |
[94] Annex 3
- Preliminary draft revision of Recommendation ITU-R SM.1753-2 - Methods for measurements of radio noise |
| |
Word
|
14622229 bytes |
2026-06-18 |
[94] Annex 2
- Preliminary draft revision to Report ITU-R SM.2486-1 - Use of commercial drones for ITU-R spectrum monitoring tasks |
| |
Word
|
18188509 bytes |
2026-06-18 |
[94] Annex 1
- Working document towards a preliminary draft revision of Report ITU-R SM.2542-1 - Next generation spectrum monitoring - proactive, autonomous and data-driven
|
| |
Word
|
33918 bytes |
2026-06-19 |
[94] Part 2
|
| |
Word
|
36003 bytes |
2026-06-19 |
[94] Part 1
|
| |
Word
|
142853 bytes |
2026-06-19 |
[94]
- Report of the meeting of Working Party 1C (Geneva, 3 - 10 June 2026) |
|
|