International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1C : Meeting 2026-06-03 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP1C  TD (2026-06-03) 

ITU-R R23-WP1C

Spectrum Monitoring

Meeting  from 2026-06-03 to 2026-06-10

held in Switzerland [Geneva]

Results:19 total items.
Temporary Documents  Documents / Contributions
 
Number 
Title Source Date
[ 59 ]  
 
Reply liaison statement to the Coordination Committee for Terminology (CCT) - Definition of the term "aerial platform"     WG 1C-1   2026-06-05
[ 58 ]  
 
[Preliminary ]draft revision of Recommendation ITU-R SM.1880-2 - Spectrum occupancy measurement and evaluation     WG 1C1   2026-06-05
[ 57 ]  
 
Draft reply liaison statement to ITU-D Study Group 2 Question 2/2 (ITU-T Study Group 5 Question 3/5 for information) Human exposure to RF-EMF     WG 1C2   2026-06-05
[ 56 ]  
 
Preliminary draft revision of Chapter 4 of the Spectrum Monitoring Handbook - Measurements     WG 1C2   2026-06-05
[ 55 ]  
 
Preliminary draft new Chapter of the Handbook on Spectrum Monitoring- Chapter 3bis - Data Management, Automation and Networking     WG 1C2   2026-06-05
[ 54 ]  
(Rev.1) 
Preliminary draft revision of the front matter of the Spectrum Monitoring Handbook     WG 1C2   2026-06-05
[ 53 ]  
 
Preliminary draft revision of Annex 1 as draft new Chapter of the ITU Handbook on Spectrum Monitoring - Chapter 6bis - Monitoring system planning and tenders     WG 1C2   2026-06-04
[ 52 ]  
 
Preliminary draft revision of Chapter 6 of the Spectrum Monitoring Handbook - Fundamentals and supporting tools     WG 1C2   2026-06-04
[ 51 ]  
 
Preliminary draft revision of Chapter 5.7 of the Spectrum Monitoring Handbook - Radio noise measurements     WG 1C2   2026-06-04
[ 50 ]  
 
Preliminary draft revision of Chapter 5.6 of the Spectrum Monitoring Handbook - Measurements of RF-EMF human exposure levels     WG 1C2   2026-06-04
[ 49 ]  
 
Preliminary draft revision of Chapter 5.5 of the Spectrum Monitoring Handbook - Monitoring of radar emissions     WG 1C2   2026-06-04
[ 48 ]  
 
Preliminary draft revision of Chapter 5.4 of the Spectrum Monitoring Handbook - Microwave links and satellite up-links     WG 1C2   2026-06-04
[ 47 ]  
 
Preliminary draft revision of Chapter 5.3 of the Spectrum Monitoring Handbook - Monitoring of cellular systems     WG 1C2   2026-06-04
[ 46 ]  
 
Preliminary draft revision of Chapter 5.2 of the Spectrum Monitoring Handbook - Monitoring of Terrestrial Broadcast emissions     WG 1C2   2026-06-04
[ 45 ]  
 
Preliminary draft revision of Chapter 5.1 of the Spectrum Monitoring Handbook - Monitoring of spacecraft emissions     WG 1C2   2026-06-04
[ 44 ]  
 
Preliminary draft revision of Chapter 3 of the Spectrum Monitoring Handbook - Monitoring stations and equipment     WG 1C2   2026-06-04
[ 43 ]  
 
Preliminary draft revision of Chapter 2 of the Spectrum Monitoring Handbook - Organization, physical structures and personnel     WG 1C2   2026-06-04
[ 42 ]  
 
Preliminary draft revision of Chapter 1 of the Spectrum Monitoring Handbook - Spectrum monitoring as a key function of a spectrum management     WG 1C2   2026-06-04
[ 41 ]  
 
Preliminary draft new Report ITU-R SM.[TRP_MEAS] - Estimation of Total Radiated Power (TRP) in the field     WG 1C1   2026-06-04
Results:19 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2026-06-05