International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP1B  C 

ITU-R R23-WP1B

Spectrum Management Methodologies and Economic Strategies

Results:106 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 106 ]  
 
Report on the fourth 2023-2027 meeting of Working Party 1B (Geneva, 3-10 June 2026)     Chair, WP 1B     2026-06-10
[ 105 ]  
 
Final list of participants - Working Party 1B (Geneva, 3-10 June 2026)     Director, BR     2026-06-10
[ 104 ]  
 
List of documents issued (Documents 1B/79 - 1B/104)     BR, Study Groups Department     2026-06-02
[ 103 ]  
 
Liaison statement reply on request for feedback on the terms "digital application layer", "digital infrastructure layer", "digital platform layer", "industrial smart energy management system" and "intelligent Internet of Things platform" developed by ITU-T Study Group 5     CCT     2026-05-29
[ 102 ]  
 
Liaison statement to Working Parties 1B and 4C - WRC-27 agenda item 1.5     WP 4A   AI1.5   2026-05-25
[ 101 ]  
 
Reply liaison statement to ITU-T Study Group 5 - Proposed draft new ITU-T Recommendation on guidance for assessing the environmental impact of radio spectrum utilization     United States     2026-05-22
[ 100 ]  
 
Preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices     Netherlands (Kingdom of the)     2026-05-22
[ 99 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices     Netherlands (Kingdom of the)     2026-05-22
[ 98 ]  
 
Proposed modification to preliminary draft revision of Report ITU-R SM.2353 - Challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands     Brazil     2026-05-22
[ 97 ]  
 
Proposed working document towards preliminary draft revision of Report ITU-R SM.2405-1 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities     Korea (Rep. of)     2026-05-20
[ 96 ]  
 
Preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     Korea (Rep. of)     2026-05-20
[ 95 ]  
 
Working document towards a preliminary draft revision of Report ITU-R SM.2404-1 - Regulatory tools to support enhanced shared use of the spectrum     Korea (Rep. of)     2026-05-20
[ 94 ]  
 
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Rep. of)     2026-05-20
[ 93 ]  
 
Proposals for working document towards a preliminary draft revision of Report ITU-R SM.2404-0     China     2026-05-20
[ 92 ]  
 
Proposals to the ITU-R Recommendation and Report with respect to SRD under revision by Working Party 1B     China     2026-05-20
[ 91 ]  
 
Proposal for preliminary draft new Report ITU-R SM.[GPR/WPR FREQ]     China     2026-05-20
[ 90 ]  
 
Preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short-range radiocommunication devices     Malaysia     2026-05-18
[ 89 ]  
 
Recent developments in DSA implementation beyond TVWS and considerations for further studies     Electronics and Telecommunications Research Institute (ETRI)     2026-05-12
[ 88 ]  
(Rev.1) 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Parties 1B, 4A, 4B, 4C, 5A, 5D, 6A, 6B and 6C - ITU-D Study Group 2 Question 2/1: Enabling policies and regulations for adopting digital telecommunication/ICT services and technologies for distribution and broadcasting     ITU-D SG1     2026-04-24
[ 87 ]  
 
Reply liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Working Party 1B (spectrum management methodologies and economic strategies) on economic activities ITU-D Study Group 2 Question 4/1: Economic aspects of national telecommunications/ICTs     ITU-D SG1     2026-04-22
[ 86 ]  
 
Reply liaison statement from ITU-R Study Group 6 to ITU-T Study Group 5 and Inter-Sector Coordination Group (copy for information to Radiocommunication Advisory Group, and ITU-R Study Groups 1, 3, 4, 5, 7) - Proposed draft new ITU-T Recommendation on "Guidance for assessing the environmental impact of radio spectrum utilization"     SG 6     2026-03-31
[ 85 ]  
 
Reply liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Party 1B, Study Groups 3, 4, 6, 7) - Proposed draft new ITU-T Recommendation on Guidance for assessing the environmental impact of radio spectrum utilization     SG 5     2025-12-04
[ 84 ]  
 
Reply liaison statement on UWB abbreviation to the ITU Terms and Definitions database and request to provide a definition for this term     ITU-T SG11     2025-11-28
[ 83 ]  
 
Liaison statement on proposed draft new ITU-T Recommendation on guidance for assessing the environmental impact of radio spectrum utilization     ITU-T SG5     2025-11-13
[ 82 ]  
 
Reply liaison statement on work items dealing with cost and economic aspects of satellite internet connectivity     ITU-T SG3     2025-11-12
[ 81 ]  
 
Reply liaison statement to ITU-R Working Party 1B (copy to ITU-T Study Groups 11, 17 and 20 and for information to ITU-R Working Party 1A) - Validation of the term "ultra-wideband technology (UWB)" and its definition and inclusion in the ITU Terms and Definitions database     CCT     2025-08-19
[ 80 ]  
 
Reply liaison statement to Working Party 5B (copy for information to Working Parties 1B, 4A, 4C, 5A, 5C and 5D) - The On-Tune Rejection (OTR) in Recommendation ITU-R SM.337 and Recommendation ITU-R M.1461     WP 1A     2025-06-19
[ 79 ]  
+Ann.1-6 
Report on the third 2023-2027 meeting of Working Party 1B (Geneva, 11-18 June 2025)     Chair, WP 1B     2025-06-18
[ 78 ]  
(Rev.1) 
Final list of participants - Working Party 1B (Geneva, 11-18 June 2025)     Director, BR     2025-06-18
[ 77 ]  
 
Note to the Chair of Working Party 1B - UWB abbreviation and definition for addition to the ITU Terms and Definitions database     Chair, WP 1A     2025-06-17
[ 76 ]  
(Rev.1) 
List of documents issued (Documents 1B/48 - 1B/76)     BR, Study Groups Department     2025-06-10
[ 75 ]  
 
Proposed modification to the preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     India     2025-05-30
[ 74 ]  
 
Spectrum grid to determine spectrum availability     Indonesia     2025-05-29
[ 73 ]  
 
Additional modifications to working document towards a preliminary draft revision of Report ITU-R SM.2353-0 - Challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands     Japan     2025-05-28
[ 72 ]  
(Rev.1) 
Liaison statement to Working Parties 1A and 1B - The On-Tune Rejection (OTR) in Recommendation ITU-R SM.337 and Recommendation ITU-R M.1461     WP 5B     2025-05-27
[ 71 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     Korea (Rep. of)     2025-05-26
[ 70 ]  
 
Guidance to support spectrum use and sharing methodology for private network     Korea (Rep. of)   Q208/1   2025-05-26
[ 69 ]  
 
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Rep. of)   Q241/1   2025-05-26
[ 68 ]  
 
Proposed reply liaison statement to ITU-T Study Group 3 - Creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators     United States     2025-05-23
[ 67 ]  
 
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Brazil     2025-05-22
[ 66 ]  
 
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties     Director, BR     2025-05-23
[ 65 ]  
 
Proposed reply liaison statement to ITU-D Study Group 1 on Report ITU-R SM.2012     China     2025-05-19
[ 64 ]  
 
Proposals for preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     China     2025-05-19
[ 63 ]  
 
Proposal for preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management     China     2025-05-19
[ 62 ]  
 
Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-T Study Groups, ITU-R Working Parties and related organizations on final Report of Question 2/2 - ITU-D Study Group 2 Question 2/2: Enabling technologies for e-services and applications, including e-health and e-education     ITU-D SG2     2025-05-16
[ 61 ]  
 
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI on use of telecommunications/ICTs for disaster risk reduction and management - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management     ITU-D SG1     2025-05-16
[ 60 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-T Study Group 21 and ITU-R Study Group 1 on strategies, policies, regulations and methods of migration to and adoption of digital technologies for broadcasting, including to provide new services for various environments - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration to and adoption...     ITU-D SG1     2025-05-14
[ 59 ]  
 
Proposal for enhancing spectrum utilization efficiency through analogue to digital migration     Sierra Leone     2025-05-12
[ 58 ]  
 
Liaison statement to Working Party 4A (copy to Working Party 1B for information) - WRC-27 agenda item 1.5     WP 4C   AI1.15   2025-05-04
[ 57 ]  
 
Liaison statement on the provisional approval of a new work item on cost models for provisioning satellite internet connectivity services     ITU-T SG3     2025-05-02
Results:106 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2026-06-10