International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP1B  C 

ITU-R R23-WP1B

Spectrum Management Methodologies and Economic Strategies

Results:102 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 102 ]  
 
Liaison statement to Working Parties 1B and 4C - WRC-27 agenda item 1.5     WP 4A   AI1.5   2026-05-25
[ 101 ]  
 
Reply liaison statement to ITU-T Study Group 5 - Proposed draft new ITU-T Recommendation on guidance for assessing the environmental impact of radio spectrum utilization     United States     2026-05-22
[ 100 ]  
 
Preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices     Netherlands (Kingdom of the)     2026-05-22
[ 99 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices     Netherlands (Kingdom of the)     2026-05-22
[ 98 ]  
 
Proposed modification to preliminary draft revision of Report ITU-R SM.2353 - Challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands     Brazil     2026-05-22
[ 97 ]  
 
Proposed working document towards preliminary draft revision of Report ITU-R SM.2405-1 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities     Korea (Rep. of)     2026-05-20
[ 96 ]  
 
Preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     Korea (Rep. of)     2026-05-20
[ 95 ]  
 
Working document towards a preliminary draft revision of Report ITU-R SM.2404-1 - Regulatory tools to support enhanced shared use of the spectrum     Korea (Rep. of)     2026-05-20
[ 94 ]  
 
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Rep. of)     2026-05-20
[ 93 ]  
 
Proposals for working document towards a preliminary draft revision of Report ITU-R SM.2404-0     China     2026-05-20
[ 92 ]  
 
Proposals to the ITU-R Recommendation and Report with respect to SRD under revision by Working Party 1B     China     2026-05-20
[ 91 ]  
 
Proposal for preliminary draft new Report ITU-R SM.[GPR/WPR FREQ]     China     2026-05-20
[ 90 ]  
 
Preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short-range radiocommunication devices     Malaysia     2026-05-18
[ 89 ]  
 
Recent developments in DSA implementation beyond TVWS and considerations for further studies     Electronics and Telecommunications Research Institute (ETRI)     2026-05-12
[ 88 ]  
(Rev.1) 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Parties 1B, 4A, 4B, 4C, 5A, 5D, 6A, 6B and 6C - ITU-D Study Group 2 Question 2/1: Enabling policies and regulations for adopting digital telecommunication/ICT services and technologies for distribution and broadcasting     ITU-D SG1     2026-04-24
[ 87 ]  
 
Reply liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Working Party 1B (spectrum management methodologies and economic strategies) on economic activities ITU-D Study Group 2 Question 4/1: Economic aspects of national telecommunications/ICTs     ITU-D SG1     2026-04-22
[ 86 ]  
 
Reply liaison statement from ITU-R Study Group 6 to ITU-T Study Group 5 and Inter-Sector Coordination Group (copy for information to Radiocommunication Advisory Group, and ITU-R Study Groups 1, 3, 4, 5, 7) - Proposed draft new ITU-T Recommendation on "Guidance for assessing the environmental impact of radio spectrum utilization"     SG 6     2026-03-31
[ 85 ]  
 
Reply liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Party 1B, Study Groups 3, 4, 6, 7) - Proposed draft new ITU-T Recommendation on Guidance for assessing the environmental impact of radio spectrum utilization     SG 5     2025-12-04
[ 84 ]  
 
Reply liaison statement on UWB abbreviation to the ITU Terms and Definitions database and request to provide a definition for this term     ITU-T SG11     2025-11-28
[ 83 ]  
 
Liaison statement on proposed draft new ITU-T Recommendation on guidance for assessing the environmental impact of radio spectrum utilization     ITU-T SG5     2025-11-13
[ 82 ]  
 
Reply liaison statement on work items dealing with cost and economic aspects of satellite internet connectivity     ITU-T SG3     2025-11-12
[ 81 ]  
 
Reply liaison statement to ITU-R Working Party 1B (copy to ITU-T Study Groups 11, 17 and 20 and for information to ITU-R Working Party 1A) - Validation of the term "ultra-wideband technology (UWB)" and its definition and inclusion in the ITU Terms and Definitions database     CCT     2025-08-19
[ 80 ]  
 
Reply liaison statement to Working Party 5B (copy for information to Working Parties 1B, 4A, 4C, 5A, 5C and 5D) - The On-Tune Rejection (OTR) in Recommendation ITU-R SM.337 and Recommendation ITU-R M.1461     WP 1A     2025-06-19
[ 79 ]  
+Ann.1-6 
Report on the third 2023-2027 meeting of Working Party 1B (Geneva, 11-18 June 2025)     Chair, WP 1B     2025-06-18
[ 78 ]  
(Rev.1) 
Final list of participants - Working Party 1B (Geneva, 11-18 June 2025)     Director, BR     2025-06-18
[ 77 ]  
 
Note to the Chair of Working Party 1B - UWB abbreviation and definition for addition to the ITU Terms and Definitions database     Chair, WP 1A     2025-06-17
[ 76 ]  
(Rev.1) 
List of documents issued (Documents 1B/48 - 1B/76)     BR, Study Groups Department     2025-06-10
[ 75 ]  
 
Proposed modification to the preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     India     2025-05-30
[ 74 ]  
 
Spectrum grid to determine spectrum availability     Indonesia     2025-05-29
[ 73 ]  
 
Additional modifications to working document towards a preliminary draft revision of Report ITU-R SM.2353-0 - Challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands     Japan     2025-05-28
[ 72 ]  
(Rev.1) 
Liaison statement to Working Parties 1A and 1B - The On-Tune Rejection (OTR) in Recommendation ITU-R SM.337 and Recommendation ITU-R M.1461     WP 5B     2025-05-27
[ 71 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems     Korea (Rep. of)     2025-05-26
[ 70 ]  
 
Guidance to support spectrum use and sharing methodology for private network     Korea (Rep. of)   Q208/1   2025-05-26
[ 69 ]  
 
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Korea (Rep. of)   Q241/1   2025-05-26
[ 68 ]  
 
Proposed reply liaison statement to ITU-T Study Group 3 - Creation of new work item on economic and policy aspects of the provision of high-speed Internet connectivity by retail satellite operators     United States     2025-05-23
[ 67 ]  
 
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     Brazil     2025-05-22
[ 66 ]  
 
Additional information on the summary of conclusions of the 32nd meeting of the Radiocommunication Advisory Group for the attention of all ITU-R Study Groups and Working Parties     Director, BR     2025-05-23
[ 65 ]  
 
Proposed reply liaison statement to ITU-D Study Group 1 on Report ITU-R SM.2012     China     2025-05-19
[ 64 ]  
 
Proposals for preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability     China     2025-05-19
[ 63 ]  
 
Proposal for preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management     China     2025-05-19
[ 62 ]  
 
Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-T Study Groups, ITU-R Working Parties and related organizations on final Report of Question 2/2 - ITU-D Study Group 2 Question 2/2: Enabling technologies for e-services and applications, including e-health and e-education     ITU-D SG2     2025-05-16
[ 61 ]  
 
Liaison statement from ITU-D Study Group 1 Question 3/1 to ITU-T Study Groups, ITU-R Working Parties, APT ASTAP and ETSI on use of telecommunications/ICTs for disaster risk reduction and management - ITU-D Study Group 1 Question 3/1: The use of telecommunications/ICTs for disaster risk reduction and management     ITU-D SG1     2025-05-16
[ 60 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-T Study Group 21 and ITU-R Study Group 1 on strategies, policies, regulations and methods of migration to and adoption of digital technologies for broadcasting, including to provide new services for various environments - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration to and adoption...     ITU-D SG1     2025-05-14
[ 59 ]  
 
Proposal for enhancing spectrum utilization efficiency through analogue to digital migration     Sierra Leone     2025-05-12
[ 58 ]  
 
Liaison statement to Working Party 4A (copy to Working Party 1B for information) - WRC-27 agenda item 1.5     WP 4C   AI1.15   2025-05-04
[ 57 ]  
 
Liaison statement on the provisional approval of a new work item on cost models for provisioning satellite internet connectivity services     ITU-T SG3     2025-05-02
[ 56 ]  
 
Preliminary position on WRC-27 agenda - Preliminary WMO position on the World Radiocommunication Conference 2027 (WRC-27) agenda     World Meteorological Organization     2025-04-07
[ 55 ]  
 
Reply liaison statement on addition of UWB abbreviation to the ITU Terms and Definitions database     ITU-T SG11     2025-03-06
[ 54 ]  
 
Liaison statement on revised title and Terms of Reference of Joint Coordination Activity on Internet of Things and Smart Cities and Communities (JCA-IoT and SC&C)     ITU-T SG20     2025-02-04
[ 53 ]  
 
Reply liaison statement to ITU-R Working Party 1B and ITU-T Study Groups 11, 17 and 20 (copy to ITU-R Working Party 1A) - Addition of the UWB abbreviation to the ITU Terms and Definitions database and request to provide a definition for this term     CCT     2024-12-19
Results:102 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2026-05-25