ITU Sectors
Newsroom
Events
Publications
Statistics
About ITU
 
Office of the Secretary General
Office of the Secretary General
Office of the Secretary General
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Standardization (ITU-T)
Standardization (ITU-T)
Standardization (ITU-T)
Development (ITU-D)
Development (ITU-D)
Development (ITU-D)
ITU TELECOM
ITU TELECOM
ITU TELECOM
 
Calendar of Events
Calendar of Events
Calendar of Events
Today's Meetings 
Today's Meetings 
Today's Meetings 
Internet Webcast Service 
Internet Webcast Service 
Internet Webcast Service 
Search 
Search 
Search 
 
All Sectors
All Sectors
All Sectors
ITU-R
ITU-R
ITU-R
ITU-T
ITU-T
ITU-T
ITU-D
ITU-D
ITU-D
General Secretariat
General Secretariat
General Secretariat
 
ITU Publications 
ITU Publications 
ITU Publications 
Publications by Sector
Publications by Sector
Publications by Sector
 
General Secretariat and ITU Telecom
General Secretariat and ITU Telecom
General Secretariat and ITU Telecom
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Standardization (ITU-T)
Standardization (ITU-T)
Standardization (ITU-T)
Development (ITU-D)
Development (ITU-D)
Development (ITU-D)
 
International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP1B : Contributions : 48 Recently posted -  Search Meeting Documents
   
[48]  Report on the second 2023-2027 meeting of Working Party 1B (Geneva, 5-8 November 2024)

Format

Size

Posted

English

Word  

1197936 bytes 2024-11-20 [48] Annex 6 - Working document towards a preliminary draft revision of Report ITU-R SM.2353-0 - Challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands

Word  

1055010 bytes 2024-11-19 [48] Annex 5 - Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems

Word  

476723 bytes 2024-11-19 [48] Annex 4 - Working document towards a preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices

Word  

54488 bytes 2024-11-19 [48] Annex 3 - Working document towards a preliminary draft revisions of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices

Word  

1233162 bytes 2024-11-19 [48] Annex 2 - Preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability

Word  

1395040 bytes 2024-11-27 [48] Annex 1 Revision 1 - Preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management

Word  

54235 bytes 2024-11-21 [48]  - Report of the second 2023-2024 meeting of Working Party 1B (Geneva, 5-8 November 2024)
 

Document :

ITU-R R23-WP1B  Contribution  48

Title :

Report on the second 2023-2027 meeting of Working Party 1B (Geneva, 5-8 November 2024)

Date :

2024-11-08

Source :

Chair, WP 1B

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-11-27