Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 244 ]
+Ann.1-11 |
Report of the meeting of Working Party 7D (Geneva, 5-11 October 2023)
|
Chairman, WP 7D
|
|
2023-10-11 |
|
[ 243 ]
|
Final List of Participants - Working Party 7D (Geneva, 5-11 October 2023)
|
Director, BR
|
|
2023-10-11 |
|
[ 242 ]
|
List of documents issued (Documents 7D/204 - 7D/242)
|
BR, Study Groups Department
|
|
2023-10-04 |
|
[ 241 ]
|
Updates to working document toward a preliminary draft new Report ITU-R RA.[HARMONICS] - Unwanted emissions created by harmonics in radio astronomy bands: measurement of impacts of harmonic emission at radio facilities
|
United States of America
|
Q145-3/7
|
2023-09-28 |
|
[ 240 ]
|
Updates to working document towards a preliminary draft new Report ITU-R RA.[RAS-IMT-COMPAT-43-GHZ] - Possible coordination and protection measures for stations of the radio astronomy service operating in the 42.5-43.5 GHz allocation and IMT systems operating in the 37-43.5 GHz mobile service allocation
|
United States of America
|
|
2023-09-28 |
|
[ 239 ]
|
Updates to preliminary draft revision of Recommendation ITU-R RA.314-10 - Preferred frequency bands for radio astronomical measurements
|
United States of America
|
|
2023-09-28 |
|
[ 238 ]
|
Working document towards a preliminary draft new Report ITU-R RA.[SZM] - Radio astronomy facilities on the Moon
|
United States of America
|
|
2023-09-28 |
|
[ 237 ]
|
Protection of the radio astronomy stations in the shielded zone of the Moon
|
Director, BR
|
|
2023-09-28 |
|
[ 236 ]
|
Proposal towards a new Recommendation ITU-R RA.[GEOVLBI] - Protection of global Geodetic Very Long Baseline Interferometry networks
|
Germany (Federal Republic of)
,
Norway
,
Spain
|
|
2023-09-28 |
|
[ 235 ]
|
Draft revision of Report ITU-R RA.2188-1 - Power flux-density and e.i.r.p. levels potentially damaging to radio astronomy receivers
|
Germany (Federal Republic of)
|
|
2023-09-28 |
|
[ 234 ]
|
Proposed new working document towards a preliminary draft new Report ITU-R RA.[UEMR]
|
Square Kilometre Array Observatory (SKAO)
,
Committee on Radio Astronomy Frequencies
|
Q129-3/7
|
2023-09-28 |
|
[ 233 ]
|
Working document towards a preliminary draft new Report ITU-R RA.[RECEIVER-RESILIENCE] - Resilience of radio astronomy receivers
|
Committee on Radio Astronomy Frequencies
,
Square Kilometre Array Observatory
|
|
2023-09-27 |
|
[ 232 ]
|
Addition to draft revision of Recommendation ITU-R RA.314-10
|
Committee on Radio Astronomy Frequencies
|
|
2023-09-27 |
|
[ 231 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 4A, 5C, 5D, 7C and 7D for information) - Beam Wireless Power Transmission (WPT) operating in the frequency band 24.1-24.15 GHz
|
WP 5A
|
|
2023-09-26 |
|
[ 230 ]
|
Proposed study for inclusion to the working document toward a preliminary draft new Report ITU-R RA.[HARMONICS]
|
Square Kilometre Array Observatory
|
|
2023-09-25 |
|
[ 229 ]
|
Working document toward a preliminary draft new Recommendation ITU-R RA.[PASSIVE BAND PROTECTION] - Protection of the radio astronomy service operating in frequency bands subject to RR No. 5.340
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science
|
|
2023-09-21 |
|
[ 228 ]
|
Working document toward a preliminary draft revision of Recommendation ITU-R RA.1513 - Levels of data loss to radio astronomy observations and percentage of time criteria resulting from degradation by interference for frequency bands allocated to the radio astronomy service on a primary basis and shared with active services
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science
|
|
2023-09-21 |
|
[ 227 ]
|
Working document toward a preliminary draft new Report ITU-R RA.[LUNAR RADIO ASTRONOMY] - Lunar Radio Astronomy
|
Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science
|
Q260/7
|
2023-09-21 |
|
[ 226 ]
|
Reply liaison statement to CISPR/H (copy for information or action to Working Parties 4A and 7D on Question 6) (copy for information to Study Group 1 and Working Parties 1A and 5A)
|
WP 6A
|
|
2023-09-11 |
|
[ 225 ]
|
Reply liaison statement to Working Party 7C (copy to Working Party 7D) - Draft new Recommendation ITU-R M.[RAD 92-100 GHz] and working document towards a preliminary draft new Report ITU-R M.[FOD_EESS_SHARE]
|
WP 5B
|
|
2023-07-17 |
|
[ 224 ]
|
Reply liaison statement to Working Party 1A - (Copy to Working Parties 5A, 5D, 7C and 7D for information) - Beam Wireless Power Transmission (WPT)
|
WP 4C
|
|
2023-07-11 |
|
[ 223 ]
|
Note to the Chairmen of Working Parties 4A and 7D (copy to the Chairmen of Study Group 1 and Working Party 1A)
|
Chairman, WP 6A
|
|
2023-06-14 |
|
[ 222 ]
|
Liaison statement to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Future Study Group 3 Work Plan for frequencies above 100 GHz
|
WP 3M
|
|
2023-06-09 |
|
[ 221 ]
|
Liaison statement to Working Parties 4C, 5A, 5D, 7C, and 7D - Beam Wireless Power Transmission (WPT)
|
WP 1A
|
|
2023-06-07 |
|
[ 220 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 4A, 5A, 5B, 5C, 7C and 7D for information) - Report on progress of activities relating to WRC-23 agenda item 1.13
|
WPs 3K and 3M
|
|
2023-06-07 |
|
[ 219 ]
|
Liaison statement to the Coordination Committee for Terminology (CCT) (copy to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D, and Study Group 1 for information) - Proposed revision of Recommendation ITU-R V.431-8
|
WPs 3J, 3K & 3M
|
|
2023-06-02 |
|
[ 218 ]
|
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Future development of P-series Recommendations to address frequencies above 100 GHz
|
WP 5A
|
|
2023-05-19 |
|
[ 217 ]
|
Reply liaison statement to CCT (copy to Working Parties 1B, 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Revising Recommendation ITU-R V.431-8
|
WP 5A
|
|
2023-05-18 |
|
[ 216 ]
|
Reply liaison statement to Working Party 7B (copy to Working Parties 3K, 3M, 4A, 5A, 5B, 7C and 7D for information) - Activities relating to WRC-23 agenda item 1.13
|
WP 5C
|
|
2023-05-18 |
|
[ 215 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 5B, 5C, 5D, 7C and 7D) - Report ITU-R SM.2352
|
WP 5A
|
|
2023-05-17 |
|
[ 214 ]
|
Liaison statement to ITU-R Working Parties - Revising Recommendation ITU-R V.431-8
|
CCT
|
|
2023-05-09 |
|
[ 213 ]
(Rev.1) |
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5D, 6A, 7B, and 7D for information) - Future development of P-series recommendations to address frequencies above 100 GHz
|
WP 5C
|
|
2022-12-01 |
|
[ 212 ]
|
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol THF
|
WP 5C
|
|
2022-11-30 |
|
[ 211 ]
|
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5C, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations
|
WP 5A
|
|
2022-11-28 |
|
[ 210 ]
|
Revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Terametric waves
|
ATDI
|
Q228/3
|
2022-11-21 |
|
[ 209 ]
|
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5C, 6A and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations
|
WP 5D
|
|
2022-10-28 |
|
[ 208 ]
|
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, and 7D - WRC-23 agenda item 1.14 activities
|
WP 7C
|
AI1.14
|
2022-10-14 |
|
[ 207 ]
|
Liaison statement to Working Parties 3K, 3M, 4A, 5A, 5B, 5C, 7C and 7D - Report on progress of activities relating to agenda item 1.13 (WRC-23)
|
WP 7B
|
AI1.13
|
2022-10-11 |
|
[ 206 ]
|
Reply liaison statement to Working Party 3M (copy to Working Parties 1A, 1B, 1C, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Future development of P-series Recommendations to address frequencies above 100 GHz
|
WP 7C
|
|
2022-10-07 |
|
[ 205 ]
|
Note to the Chairmen of Working Parties 5D and 6A (copy to the Chairmen of Working Parties 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4
|
Chairmen, WPs 3J, 3K and 3M
|
AI1.4
|
2022-10-06 |
|
[ 204 ]
+Ann.1-7 |
Report of the meeting of Working Party 7D (Geneva, 28 September - 5 October 2022)
|
Chairman, WP 7D
|
|
2022-10-05 |
|
[ 203 ]
|
Final list of participants Working Party 7D (Geneva, 28 Sept. - 5 Oct. 2022)
|
Director, BR
|
|
2022-10-05 |
|
[ 202 ]
|
List of documents issued (Documents 7D/164 - 7D/202)
|
BR, Study Groups Department
|
|
2022-09-28 |
|
[ 201 ]
|
Reply liaison statement to Working Party 5D (copy to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - WRC-23 agenda item 1.4
|
WP 6A
|
AI1.4
|
2022-09-28 |
|
[ 200 ]
|
Report on the CPM-23 Chapter 3 issues (and Chapter 5 Science Topics)
|
CPM-23 Rapporteur, Chapter 3-Science Issues
|
AI9.1D), AI9.1A), AI1.14, AI1.13, AI1.12
|
2022-09-20 |
|
[ 199 ]
|
Updates to working document towards PDN Report ITU-R RA.[RAS-IMT-COMPAT-43 GHZ] - Possible coordination and protection measures for stations of the radio astronomy service from IMT systems operating in shared and adjacent bands within 42.5 to 43.5 GHz
|
Committee on Radio Astronomy Frequencies
|
|
2022-09-20 |
|
[ 198 ]
|
Preliminary draft new Report on technical and operational characteristics of Geodetic VLBI - (Question ITU-R 258/7)
|
Committee on Radio Astronomy Frequencies
|
Q258/7
|
2022-09-20 |
|
[ 197 ]
|
Preliminary draft new Report ITU-R RA.[EHT]
|
Committee on Radio Astronomy Frequencies
|
|
2022-09-20 |
|
[ 196 ]
|
Working document toward a preliminary draft new Report ITU-R RA.[CMB] - Technical and operational characteristics of broadband, background-limited bolometric detectors operating in the millimeter-wave regime
|
Committee on Radio Astronomy Frequencies
|
|
2022-09-20 |
|
[ 195 ]
|
Working document towards a preliminary draft new Report ITU-R RA.[67-116GHZ] - Technical and operational characteristics of radio astronomy systems and sharing feasibility in the 3-4 mm band (67-116 GHz) - (Question ITU-R 226-2/7)
|
Committee on Radio Astronomy Frequencies
|
Q226/7
|
2022-09-20 |
Results:244 total items. Result page:
1 -
2 -
3 -
4 -
5
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):