Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 59 ]
|
Spectrum utilization efficiency data collection (Information document)
|
Brazil (Federative Republic of)
|
|
2024-10-24 |
|
[ 58 ]
|
Spectrum grid for determining spectrum availability and economy
|
Indonesia (Republic of)
|
|
2024-10-23 |
|
[ 57 ]
|
Proposed revision of Report ITU-R SM.2353-0 - The challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands
|
Japan
|
|
2024-10-22 |
|
[ 56 ]
|
Proposed draft liaison statement to CCT - UWB Abbreviation and Definition in the ITU-R recommendations and reports
|
Korea (Republic of)
|
|
2024-10-22 |
|
[ 55 ]
|
Proposed draft new ITU-R Question - Guidance on the use of radio spectrum for new radio systems in the presence of incumbents
|
Korea (Republic of)
|
|
2024-10-22 |
|
[ 54 ]
|
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability
|
Korea (Republic of)
|
|
2024-10-22 |
|
[ 53 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems
|
Korea (Republic of)
|
|
2024-10-22 |
|
[ 52 ]
|
Working document towards a preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short-range devices
|
United States of America
|
|
2024-10-21 |
|
[ 51 ]
|
Proposal for preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management
|
China (People's Republic of)
|
|
2024-10-21 |
|
[ 50 ]
|
Proposals for preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY]
|
China (People's Republic of)
|
|
2024-10-21 |
|
[ 49 ]
|
Proposed modification to the working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management
|
India (Republic of)
|
|
2024-05-31 |
|
[ 48 ]
|
Working document towards a preliminary draft revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices
|
Netherlands (Kingdom of the)
|
|
2024-05-29 |
|
[ 47 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices
|
Netherlands (Kingdom of the)
|
|
2024-05-30 |
|
[ 46 ]
|
Preliminary draft new Question ITU-R [UWB]/1
|
Germany
,
Austria
,
Finland
,
Hungary
,
Latvia
,
Netherlands (Kingdom of the)
,
Romania
,
Switzerland
|
|
2024-05-30 |
|
[ 45 ]
|
Proposed modification to preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability
|
Korea (Rep. of)
|
Q241/1
|
2024-05-29 |
|
[ 44 ]
|
Editorial revision and update of Report ITU-R SM.2353-0 - The challenges and opportunities for spectrum management resulting from the transition to digital terrestrial television in the UHF bands
|
United States of America
|
|
2024-05-24 |
|
[ 43 ]
|
Proposal for working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management
|
China (People's Republic of)
|
|
2024-05-23 |
|
[ 42 ]
|
Preliminary position on WRC-27 agenda
|
WMO
|
|
2024-03-06 |
|
[ 41 ]
|
Proposed revision of Report ITU-R SM.2015-1 - Methods for determining national long-term strategies for spectrum utilization
|
United Arab Emirates
|
|
2023-05-22 |
|
[ 40 ]
|
Proposed modification to the preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] - Assessment of Spectrum efficiency and economic value
|
India (Republic of)
|
|
2023-05-22 |
|
[ 39 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability
|
Korea (Republic of)
|
|
2023-05-19 |
|
[ 38 ]
|
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and
Wall-Penetrating Radar (GPR/WPR) imaging systems
|
Korea (Republic of)
|
|
2023-05-19 |
|
[ 37 ]
|
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - [Methodologies for assessing or predicting spectrum availability]
|
China (People's Republic of)
|
|
2023-05-17 |
|
[ 36 ]
|
Proposals on the modification to the preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] - Assessment of Spectrum efficiency and economic value
|
China (People's Republic of)
|
|
2023-05-17 |
|
[ 35 ]
|
Proposal for working document towards a preliminary draft revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management
|
Brazil (Federative Republic of)
|
|
2023-04-28 |
|
[ 34 ]
|
WTDC Resolution 9 (Rev. Kigali, 2022) implementation ITU-R and ITU-D collaboration - Participation of countries, particularly developing countries, in spectrum management
|
Kenya (Republic of)
,
ATDI
|
|
2023-04-21 |
|
[ 33 ]
|
Editorial revision of Recommendation ITU-R SM.1756-0 - Framework for the introduction of devices using ultra-wideband technology
|
United States of America
|
|
2023-04-20 |
|
[ 32 ]
|
Editorial revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short-range radiocommunication devices
|
United States of America
|
|
2023-04-20 |
|
[ 31 ]
|
Editorial revision of Report ITU-R SM.2012-6 - Economic aspects of spectrum management
|
United States of America
|
|
2023-04-20 |
|
[ 30 ]
|
Revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Terametric waves
|
ATDI
|
Q228/3
|
2022-11-21 |
|
[ 29 ]
|
Adding symbol to the ninth ITU Radio Regulations band and revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Decimillimetric waves
|
ATDI
|
Q228/3
|
2022-11-02 |
|
[ 28 ]
|
Proposed additional modifications to the preliminary draft revision of Report ITU-R SM.2153-8 - Technical and operating parameters and spectrum use for short-range radiocommunication devices
|
Brazil (Federative Republic of)
|
|
2022-06-21 |
|
[ 27 ]
|
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY]
|
China (People's Republic of)
|
|
2022-06-21 |
|
[ 26 ]
|
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL]
|
China (People's Republic of)
|
|
2022-06-21 |
|
[ 25 ]
|
Proposed working document towards a preliminary draft new Report ITU-R [SPECTRUM MANAGEMENT FRAMEWORK FOR THE INTRODUCTION OF GPR/WPR] - Spectrum management framework for the introduction of Ground- and Wall- Penetrating Radar (GPR/WPR) imaging systems
|
Korea (Republic of)
|
|
2022-06-20 |
|
[ 24 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability
|
Korea (Republic of)
|
Q241/1
|
2022-06-20 |
|
[ 23 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1603-2 - Spectrum redeployment as a method of national spectrum management
|
United States of America
|
|
2022-06-16 |
|
[ 22 ]
|
Liaison statement - Revision ETSI Report TR 103 181-3 - Summary worldwide UWB regulations
|
European Telecommunications Standards Institute
|
|
2022-06-01 |
|
[ 21 ]
|
Adding symbol to the ninth ITU Radio Regulations band and revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Decimillimetric waves
|
ATDI
|
Q228/3
|
2022-04-06 |
|
[ 20 ]
|
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL]
|
China (People's Republic of)
|
|
2021-10-27 |
|
[ 19 ]
|
Factors need to be considered when developing the working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY]
|
China (People's Republic of)
|
Q241/1
|
2021-10-27 |
|
[ 18 ]
|
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability
|
Korea (Republic of)
|
Q241/1
|
2021-10-26 |
|
[ 17 ]
|
Proposed revision of Report ITU-R SM.2015-1 - Methods for determining national long-term strategies for spectrum utilization
|
Korea (Republic of)
|
|
2021-10-26 |
|
[ 16 ]
|
Working document towards preliminary draft revision of Report ITU-R SM.2153-8 - Technical and operating parameters and spectrum use for short-range devices
|
United States of America
|
|
2021-10-22 |
|
[ 15 ]
|
Reply liaison statement to ITU-R Working Party 1B on the work related to Report ITU-R SM.2423
|
Asia-Pacific Telecommunity
|
|
2021-09-17 |
|
[ 14 ]
|
Proposed revision of Report ITU-R SM.2093-3 - Guidance on the regulatory framework for national spectrum management
|
Brazil (Federative Republic of)
|
|
2021-05-17 |
|
[ 13 ]
|
Proposed modification to the elements of a working document towards a preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL]
|
China (People's Republic of)
|
Q240/1
|
2021-05-17 |
|
[ 12 ]
|
Proposed working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability
|
Korea (Republic of)
|
Q241/1
|
2021-05-14 |
|
[ 11 ]
|
RevisIons to working document toward a preliminary draft Revision of ITU-R Recommendation SM.1896-1: Frequency ranges for global or regional harmonization of short-range devices
|
United States of America
|
|
2021-05-13 |
|
[ 10 ]
|
Preliminary position on WRC-23 agenda
|
World Meteorological Organization
|
|
2021-03-17 |
Results:59 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):