International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions : 826 Recently posted -  Search Meeting Documents
   
[826]  Report on the meeting of Working Party 4A (Geneva, 3-14 July 2018)

Format

Size

Posted

English

Word  

1144124 bytes 2018-08-15 [826] Annex 47 - List of liaison statements to ITU-R Groups

Word  

44470 bytes 2018-07-24 [826] Annex 46 - Note to the Director, Radiocommunication Bureau (copy for information to Working Party 4C) - Technical feasibility of NGSO-to-GSO satellite links

Word  

78458 bytes 2018-07-23 [826] Annex 45 - Draft CPM text for WRC-19 agenda item 9.1, issue 9.1.9

Word  

51218 bytes 2018-07-20 [826] Annex 44 - Draft CPM text for WRC-19 agenda item 9.1, issue 9.1.3

Word  

68603 bytes 2018-07-23 [826] Annex 43 - Draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2

Word  

61301 bytes 2018-07-20 [826] Annex 42 - Draft CPM text for WRC-19 agenda item 7 - Issue M

Word  

81737 bytes 2018-07-20 [826] Annex 41 - Draft CPM text for WRC-19 agenda item 7 - Issue L

Word  

894085 bytes 2018-07-20 [826] Annex 40 - Draft CPM text for WRC-19 agenda item 7 - Issue K

Word  

56463 bytes 2018-07-20 [826] Annex 39 - Draft CPM text for WRC-19 agenda item 7 - Issue J

Word  

55295 bytes 2018-07-20 [826] Annex 38 - Draft CPM text for WRC-19 agenda item 7 - Issue I

Word  

74439 bytes 2018-07-20 [826] Annex 37 - Draft CPM text for WRC-19 agenda item 7 - Issue H

Word  

68956 bytes 2018-07-20 [826] Annex 36 - Draft CPM text for WRC-19 agenda item 7 - Issue G

Word  

194706 bytes 2018-07-19 [826] Annex 35 - Draft CPM text for WRC-19 agenda item 7 - Issue F

Word  

66912 bytes 2018-07-19 [826] Annex 34 - Draft CPM text for WRC-19 agenda item 7 - Issue E

Word  

52515 bytes 2018-07-18 [826] Annex 33 - Draft CPM text for WRC-19 agenda item 7 - Issue D

Word  

126465 bytes 2018-07-19 [826] Annex 32 - Draft CPM text for WRC-19 agenda item 7 - Issue C

Word  

55397 bytes 2018-07-18 [826] Annex 31 - Draft CPM text for WRC-19 agenda item 7 - Issue B

Word  

411168 bytes 2018-07-26 [826] Annex 30 - Draft CPM text for WRC-19 agenda item 7 - Issue A

Word  

116415 bytes 2018-08-02 [826] Annex 29 - Draft CPM text for WRC-19 agenda item 1.6

Word  

89375 bytes 2018-07-26 [826] Annex 28 - Draft CPM text for WRC-19 agenda item 1.5

Word  

387415 bytes 2018-08-14 [826] Annex 27 - Draft CPM text for WRC-19 agenda item 1.4

Word  

45801 bytes 2018-07-24 [826] Annex 26 - Consideration and discussion on long-term interference from non-GSO FSS systems into GSO FSS

Word  

74125 bytes 2018-07-27 [826] Annex 25 Part 2

Excel 2007  

171054 bytes 2018-07-27 [826] Annex 25 Part 1

Word  

290613 bytes 2018-07-27 [826] Annex 25 - Establishment of Correspondence Group for review of V-band GSO reference links - WRC-19 agenda item 1.6

Word  

53298 bytes 2018-07-23 [826] Annex 24 - Working document towards the development of a methodology to validate the minimum emission parameters contained within submissions of FSS satellite network not subject to RR Appendix 30B

Word  

162735 bytes 2018-07-23 [826] Annex 23 - Working document towards a preliminary draft new Report ITU-R S.[NGSO_6/4-GHz] - Technical and regulatory studies for 6/4 GHz non-GSO FSS sharing

Word  

903936 bytes 2018-07-25 [826] Annex 22 - Working document towards a preliminary draft new Report ITU-R S.[NGSO-to-GSO] - Technical feasibility of NGSO-to-GSO satellite links

Word  

49283 bytes 2018-07-25 [826] Annex 21 - Working document towards a preliminary draft new Report ITU-R S.[MOD_NON-GSO] - Regulatory provisions for the modification of notices relative to non-geostationary systems operating in the FSS, MSS and BSS above 10 GHz subject to Section II of Article 9 of the Radio Regulations

Word  

156590 bytes 2018-07-23 [826] Annex 20 - Working document towards a preliminary draft new Report ITU-R S.[NGSO_BIU+MILESTONES] - Studies relating to the bringing into use of frequency assignments for all non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services

Word  

1875960 bytes 2018-07-25 [826] Annex 19 - Working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] - Compatibility studies between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz in different countries in Regions 1 and 3

Word  

17255729 bytes 2018-07-23 [826] Annex 18 - Working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC 15) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions

Word  

3917584 bytes 2018-07-27 [826] Annex 17 - Working document towards a preliminary draft new Report/Recommendation ITU-R [LESIM-MS] - Statistical methodologies to estimate the interference from land earth stations in motion (L-ESIM) communicating with geostationary space stations in the fixed-satellite service into mobile service (MS) stations operating in the frequency band 27.5-29.5 GHz

Word  

6597228 bytes 2018-07-24 [826] Annex 16 - Working document towards a preliminary draft new Report/Recommendation ITU-R [LESIM-FS] - Statistical methodologies to estimate the interference from land earth stations in motion (L-ESIM) communicating with geostationary space stations in the fixed satellite service into fixed service (FS) stations operating in the frequency band 27.5-29.5 GHz

Word  

569226 bytes 2018-07-24 [826] Annex 15 - Working document towards a preliminary draft new Report ITU-R S.[ESIM] - Earth stations in motion (ESIM) compatibility with non-GSO MSS feeder links in the bands 19.3-19.7 GHz and 29.1-29.5 GHz

Word  

14987565 bytes 2018-07-24 [826] Annex 14 - Working document towards a preliminary draft new Report ITU-R S./M.[ESIM-MS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the MS in the frequency band 27.5-29.5 GHz

Word  

9881652 bytes 2018-07-24 [826] Annex 13 - Working document towards a preliminary draft new Report ITU-R S./F.[ESIM-FS] - Sharing and compatibility between earth stations in motion operating with geostationary FSS networks and current and planned stations of the FS in the frequency bands 27.5-29.5 GHz and 17.7-19.7 GHz

Word  

447432 bytes 2018-07-25 [826] Annex 12 - Working document towardss a preliminary draft new Report ITU-R S.[AGENDA ITEM 1.5] - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz

Word  

6569657 bytes 2018-07-24 [826] Annex 11 - Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz ADJACENT BAND STUDIES] - Protection of EESS (passive) and RAS systems from non GSO fixed satellite systems operating in the 37.5-42.5 GHz, 47.2 50.2 GHz and 50.4-51.4 GHz frequency bands

Word  

609327 bytes 2018-07-25 [826] Annex 10 - Working document towards a preliminary draft new Report ITU-R S.[50/40 NGSO-NGSO SHARING] - Study of mitigation techniques between non-GSO FSS systems in the bands 36-37 GHz and 50.2-50.4 GHz

Word  

12455723 bytes 2018-07-24 [826] Annex 09 - Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-3 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations

Word  

110985 bytes 2018-07-24 [826] Annex 08 - Working document towards a preliminary draft revision of Recommendation ITU-R BO.1443-3 - Reference BSS earth station antenna patterns for use in interference assessment involving non-GSO satellites in frequency bands covered by RR Appendix 30

Word  

69991 bytes 2018-07-24 [826] Annex 07 - Working document towards a preliminary draft revision of Recommendation ITU-R S.1428-1 - Reference FSS earth-station radiation patterns for use in interference assessment involving non-GSO satellites in frequency bands between 10.7 GHz and 30 GHz

Word  

47735 bytes 2018-07-24 [826] Annex 06 - Working document towards a preliminary draft new Recommendation ITU-R S.[UP TO 86 GHZ FSS PROTECTION] - Protection criteria for fixed-satellite service networks operating in frequency below 86 GHz for time-invariant and time-variant interference in the context of sharing studies with other co-primary services

Excel 2007  

32425 bytes 2018-07-30 [826] Annex 05 Part 1

Word  

81346 bytes 2018-07-30 [826] Annex 05 - Working document towards preliminary draft new Recommendation ITU-R S.[50/40 REFERENCE LINKS] - WRC-19 agenda item 1.6

Word  

7168544 bytes 2018-07-25 [826] Annex 04 - Preliminary draft new Report ITU-R S.[50/40 GSO-NGSO Sharing] - Sharing between 50/40 GHz GSO networks and non-GSO systems

Word  

16114405 bytes 2018-07-24 [826] Annex 03 - Preliminary draft new Report ITU-R S.[SPECTRUM_SHARING] - Sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands

Word  

6570020 bytes 2018-07-24 [826] Annex 02 - Preliminary draft revision of Recommendation ITU-R S.1782-0 and updates to the related work plan - Guidelines on global broadband Internet access by fixed-satellite service systems

Word  

376190 bytes 2018-07-27 [826] Annex 01 - Preliminary draft new Recommendation ITU-R S.[50/40 GHz FSS SHARING METHODOLOGY] - Maximum permissible levels of interference in a atellite network (GSO and non-GSO) in the fixed-satellite service caused by other co-directional FSS and BSS networks operating in the 50/40 GHz frequency bands

Word  

1542491 bytes 2018-08-15 [826]  - Report on the meeting of Working Party 4A (Geneva, 3-14 July 2018)
 

Document :

ITU-R WP4A  Contribution  826

Title :

Report on the meeting of Working Party 4A (Geneva, 3-14 July 2018)

Date :

2018-07-16

Source :

Chairman, WP 4A

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2018-08-15