Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 233 ]
|
Liaison statement on work being carried out under study in ITU-T Q3/5
|
ITU-T SG 5
|
|
2019-10-15 |
|
[ 232 ]
|
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Parties 1A, 1B and 1C on collaboration - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services
|
ITU-D SG 1
|
|
2019-10-02 |
|
[ 231 ]
|
Liaison statement to Working Party 1C - Development of a new Report ITU-R SM.2454-0
|
WP 4C
|
|
2019-07-17 |
|
[ 230 ]
|
Reply liaison statement to Working Party 7C (copy to ITU-R Working Parties 1C, 4A, 4B and 7D) - Interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors
|
WP 1A
|
|
2019-06-18 |
|
[ 229 ]
|
Liaison statement to CISPR on EMC standards and limits (copy to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reducing EMI and RF noise
|
WP 1A
|
|
2019-06-18 |
|
[ 228 ]
|
Reply liaison statement to CISPR on EMC standards and limits (copy for information to ITU-T Study Group 5 and ITU-R Working Parties 1C, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B, 7C and 7D) - Further cooperation on reported cases of interference
|
WP 1A
|
|
2019-06-18 |
|
[ 227 ]
|
Liaison statement on working being carried out under study in ITU-T Study Group 5 Question 3/5
|
ITU-T SG 5
|
|
2019-06-14 |
|
[ 226 ]
+Ann.1-14 |
Report of the meeting of Working Party 1C (Geneva, 28 May - 5 June 2019)
|
Chairman, WP 1C
|
|
2019-06-05 |
|
[ 225 ]
|
Final list of participants - Working Party 1C (Geneva, 28 May - 5 June 2019)
|
Director, BR
|
|
2019-06-05 |
|
[ 224 ]
|
Reply liaison statement to Working Party 1A (copy to ITU-R WP 1C, 4A, 4B and 7D) - Interference from broadcasting-satellite receiving equipment into EESS (passive) remote sensors
|
WP 7C
|
|
2019-05-31 |
|
[ 223 ]
|
List of documents issued (Documents 1C/169 - 1C/223)
|
BR Study Groups Department
|
|
2019-05-27 |
|
[ 222 ]
|
Proposal for revisions to preliminary draft new Recommendation ITU-R SM.[TDOA-ACC] - Test procedure for measuring geolocation accuracy of TDOA emitter location systems
|
Rohde & Schwarz GmbH & Co. KG
|
Q240/1
|
2019-05-21 |
|
[ 221 ]
(Rev.1) |
Proposed new Annex 9 to include space radio monitoring station in Sultanate of Oman in the scope of Report ITU-R SM.2182
|
Oman (Sultanate of)
|
|
2019-05-21 |
|
[ 220 ]
|
Report of Correspondence Group activities on the revision of Recommendation ITU-R SM.1392-2 on essential requirements for a spectrum monitoring system for developing countries
|
Chairman, CG on Rec. ITU-R SM.1392-2
|
|
2019-05-21 |
|
[ 219 ]
|
Revision of Report ITU-R SM.2257-4 - Addition of result for spectrum management and monitoring during 2018 PyeongChang Winter Olympic and Paralympic Games
|
Korea (Republic of)
|
|
2019-05-21 |
|
[ 218 ]
|
Method for the identification and the measurement of interference caused by indoor man-made noise in VHF band II and band III (contribution to ITU-R Working Party 1C with copy to Working Party 3L)
|
European Broadcasting Union
|
|
2019-05-21 |
|
[ 217 ]
|
Key parameters for FHSS signal monitoring
|
China (People's Republic of)
|
|
2019-05-21 |
|
[ 216 ]
|
Analysis of cuboid spectrum data of Internet based spectrum monitoring system
|
China (People's Republic of)
|
|
2019-05-21 |
|
[ 215 ]
|
Working document towards a preliminary draft new Report and Recommendation - Use of small satellites for Spectrum Monitoring
|
China (People's Republic of)
|
|
2019-05-21 |
|
[ 214 ]
|
This document has been withdrawn
|
Chairman, CG on Spectrum Monitoring Evolution
|
|
2019-05-27 |
|
[ 213 ]
|
Activity Report of the Correspondence Group on preliminary draft new Recommendation on field strength measurement accuracy - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range
|
Chairman, CG on Field Strength Measurement Accu.
|
|
2019-05-21 |
|
[ 212 ]
|
Proposal for a new Recommendation on test procedures for measuring accuracy of TDOA-based emitter location systems - Test procedures for measuring geolocation accuracy
|
CG on Geolocation accuracy
|
|
2019-05-21 |
|
[ 211 ]
|
Working document towards a preliminary draft new Recommendation ITU-R SM.[APP10] - Reporting Harmful Interference in support of Appendix 10 of the Radio Regulations
|
China (People's Republic of)
|
Q232/1
|
2019-05-21 |
|
[ 210 ]
|
Proposed working document regarding a possible modification of preliminary draft new Report ITU-R SM.[EMF-MON] - Methodology for measuring WiFi exposure levels and description of the procedure for establishing the optimal frequency domain configuration of the measuring equipment
|
Universidad Del País Vasco
|
Q239/1
|
2019-05-21 |
|
[ 209 ]
|
Proposals towards developing new version of the ITU Spectrum Monitoring Handbook
|
Russian Federation
|
|
2019-05-20 |
|
[ 208 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1875-2 - DVB T/T2 coverage measurements and comparison with coverage predictions
|
Russian Federation
|
|
2019-05-20 |
|
[ 207 ]
|
Proposed modification to the working document towards a preliminary draft new Recommendation ITU R SM.[FS-MEAS-ACC] - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range
|
Japan
|
|
2019-05-20 |
|
[ 206 ]
|
Proposed editorial revision of thirty one Recommendations assigned to ITU-R Working Party 1C
|
Chairman, SG 1 CG on editorial review
|
|
2019-05-17 |
|
[ 205 ]
|
Comments for mandatory format to the ITU-R Recommendations assigned to ITU-R Working Party 1C
|
Chairman, SG 1 CG on editorial review
|
|
2019-05-17 |
|
[ 204 ]
|
Report of measurement results in support of the working document towards a preliminary draft new Recommendation ITU-R SM.[MOB DF PERF] - Performance evaluation of Mobile DF units in operational environment
|
Greece
|
|
2019-05-17 |
|
[ 203 ]
|
Proposal for revisions to preliminary draft new Recommendation ITU-R SM.[TDOA-ACC] - Test procedure for measuring geolocation accuracy of TDOA emitter location systems
|
United States of America
|
Q210/1
|
2019-05-14 |
|
[ 202 ]
|
Working document towards a preliminary draft new Recommendation ITU-R SM.[MOB DF PERF] - Performance evaluation of mobile DF units in operational environment
|
Egypt (Arab Republic of)
|
|
2019-05-14 |
|
[ 201 ]
|
Activity Report - Electromagnetic field measurements to assess human exposure
|
Chairman, CG on Report ITU-R SM.[EMF-MON]
|
Q239/1
|
2019-05-14 |
|
[ 200 ]
|
Draft new Report ITU-R SM.[EMF-MON] - Electromagnetic field measurements to assess human exposure
|
ATDI
|
Q239/1
|
2019-05-14 |
|
[ 199 ]
|
Report of the CG work after the 2018 meeting of SG 1 on a preliminary draft revision of Report ITU-R SM.2355-0
|
Chairman, CG on Spectrum Monitoring Evolution
|
|
2019-05-13 |
|
[ 198 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[POPULATION_COVERAGE] - Population coverage measurement with public wireless networks
|
Chairman, CG on Population Coverage
|
|
2019-05-13 |
|
[ 197 ]
|
Activity report of the Correspondence Group on developing a draft new Report on population coverage - Population coverage measurement with public wireless networks
|
Chairman, CG on Population Coverage
|
|
2019-05-13 |
|
[ 196 ]
|
Activity Report of the Correspondence Group on preliminary draft new recommendation on field strength measurement accuracy - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range
|
Chairman, CG on Field Strength Measurement Accu.
|
|
2019-05-10 |
|
[ 195 ]
|
Proposed modifications to the working document towards a preliminary draft new Recommendation ITU-R SM.[APP10] - Reporting Harmful Interference in support of Appendix 10 of the Radio Regulations
|
World Broadcasting Unions - Technical Committee
|
|
2019-05-07 |
|
[ 194 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1875-2 - DVB T/T2 coverage measurements and comparison with coverage predictions
|
CG DVB-T Coverage
|
|
2019-05-03 |
|
[ 193 ]
|
Report of Correspondence Group activities on preliminary draft revision of Recommendation ITU-R SM.1875-2 on DVB-T/T2 Coverage measurements and verification of planning criteria
|
Chairman, CGon DVB-T Coverage Measurements
|
|
2019-05-03 |
|
[ 192 ]
|
Proposed draft revision of Recommendation ITU-R SM.1268-4 - Method of measuring the maximum frequency deviation of FM broadcast emissions at monitoring stations
|
Germany (Federal Republic of)
|
|
2019-05-03 |
|
[ 191 ]
|
Report on the activities of the Correspondence Group on radiomonitoring in the GNSS bands
|
Chairman, CG Meas-GNSS
|
|
2019-04-30 |
|
[ 190 ]
|
Liaison statement on strategies and policies concerning human exposure to EMF
|
ITU-D SG 2
|
|
2019-04-11 |
|
[ 189 ]
|
Reply liaison statement to ITU-R Working Parties 1A and 1C (copy to 3GPPRAN4/RAN5) - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas
|
WP 5D
|
|
2019-03-05 |
|
[ 188 ]
|
Liaison statement on ITU inter-Sector coordination
|
ITU-T TSAG
|
|
2018-12-17 |
|
[ 187 ]
|
Liaison statement to Working Party 3L (copy for information to Working Parties 1A, 1C, 5A, 5B, 6A, and 7A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) (Question ITU-R 210-3/1)
|
WP 1B
|
AI9.1
|
2018-11-29 |
|
[ 186 ]
|
Proposed draft revision of Recommendation ITU-R SM.1054-0 - Monitoring of radio emissions from spacecraft at monitoring stations
|
Germany (Federal Republic of)
|
|
2018-11-27 |
|
[ 185 ]
|
Draft new Report ITU-R SM.[SAT MON COOPERATION]
|
Germany (Federal Republic of)
|
|
2018-11-27 |
|
[ 184 ]
|
Liaison statement to Working Parties 1C and 3L - Working document towards a preliminary draft new Report ITU-R M.[HF NOISE AT SEA]
|
WP 5B
|
|
2018-11-16 |
Results:233 total items. Result page:
1 -
2 -
3 -
4 -
5
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):