Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 383 ]
|
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-T Study Group 3 and ITU-R Study Group 1 Working Party 1B on economic aspects of spectrum management and sharing - Economic policies and methods of determining the costs of services related to national telecommunication/information and communication technology networks, including next-generation networks
|
ITU-D SG 1
|
|
2019-10-09 |
|
[ 382 ]
|
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Parties 1A, 1B and 1C on collaboration - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services
|
ITU-D SG 1
|
|
2019-10-02 |
|
[ 381 ]
|
Liaison statement to Working Parties 1B, 5A, 5B and 5D on activities on wireless power transmission via radio frequency beam
|
WP 1A
|
|
2019-06-24 |
|
[ 380 ]
+Ann.1-4 |
Report on the seventh 2015-2019 meeting of Working Party 1B (Geneva, 28 May - 5 May 2019)
|
Chairman, WP 1B
|
|
2019-06-05 |
|
[ 379 ]
|
Final list of participants - Working Party 1B (Geneva, 28 May - 5 June 2019)
|
Director, BR
|
|
2019-06-05 |
|
[ 378 ]
|
Liaison statement to Working Party 1B (copy to Working Party 1A, for information) - On protection criteria for SFTS en relation to WRC-19 agenda item 9.1, issue 9.1.6
|
WP 7A
|
AI9.1
|
2019-05-31 |
|
[ 377 ]
|
List of documents issued (Documents 1B/341 - 1B/377)
|
BR Study Groups Department
|
|
2019-05-27 |
|
[ 376 ]
(Rev.2) |
Reply liaison statement to Wokring Parties 1B, 5A and 6A - Building entry losses in the range 9 kHz to 10 MHz (far-field and near fiel)
|
WPs 3J, 3K, 3L and 3M
|
|
2019-05-27 |
|
[ 375 ]
|
Report on CISPR activities from November 2018 to May 2019
|
Rapporteur, SG 1 RG on Liaison with CISPR
|
|
2019-05-27 |
|
[ 374 ]
|
Establishment of liaison between CISPR B and the relevant Groups in ITU-R
|
International Special Committee on Radio Interference
|
|
2019-05-20 |
|
[ 373 ]
|
Liaison statement to ITU-R on the activity of the wireless power transfer for electric vehicles in CISPR 11 standard
|
International Special Committee on Radio Interference
|
|
2019-05-20 |
|
[ 372 ]
|
Update to study on the impact of WPT-EV on the 60 KHz standard frequency and time signal service
|
United Kingdom of Great Britain and Northern Ireland
|
AI9.1
|
2019-05-21 |
|
[ 371 ]
|
Modification to the PDR Recommendation ITU-R SM.2110 to reflect the outcomes of studies
|
United Kingdom of Great Britain and Northern Ireland
|
AI9.1
|
2019-05-21 |
|
[ 370 ]
|
Proposed revisions to Annex 2 to Working Party 1B Chairman's Report (1B/341) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_EV_IMPACT] - Assessment of impact of wireless power transmission for electric vehicle charging (WPT-EV) on radiocommunication services
|
European Broadcasting Union
|
|
2019-05-21 |
|
[ 369 ]
|
Proposed revision of the draft revision of Report ITU-R SM.2015-0 - Methods for determining national long-term strategies for spectrum utilization
|
Korea (Republic of)
|
Q205/1
|
2019-05-21 |
|
[ 368 ]
|
Proposal for an update of working document towards a preliminary draft new Report ITU-R SM.[WPT_EV_IMPACT]
|
Korea (Republic of)
|
Q210/1, AI9.1
|
2019-05-21 |
|
[ 367 ]
|
Proposal for a draft new ITU-R Question - Methodologies for Balancing between Spectrum Supply and Demand in Spectrum Management
|
Korea (Republic of)
|
|
2019-05-21 |
|
[ 366 ]
|
Proposed modification of working document towards a preliminary draft new Report ITU-R SM.[SPECTRUM AUCTION] - [Assessment of spectrum efficiency and economic value]
|
Korea (Republic of)
|
Q240/1
|
2019-05-21 |
|
[ 365 ]
|
The proposal of modification to the working document of preliminary draft new Report on the question of "Assessment of spectrum efficiency and economoic value"
|
China (People's Republic of)
|
|
2019-05-21 |
|
[ 364 ]
|
Proposed revision of elements for a working document towards a preliminary draft new Report ITU-R SM.[WPT-REGULATION]
|
Japan
|
Q210-3/1
|
2019-05-20 |
|
[ 363 ]
|
Proposed revision of working document towards a preliminary draft new Report ITU-R SM.[WPT_EV_IMPACT]
|
Japan
|
AI9.1
|
2019-05-20 |
|
[ 362 ]
|
Proposal of working document towards a preliminary draft new Recommendation ITU-R SM.[WPT-UNWANTED]
|
Japan
|
AI9.1
|
2019-05-20 |
|
[ 361 ]
|
Proposed editorial revision of thirteen Recommendations assigned to ITU-R Working Party 1B
|
Chairman, SG 1 CG on editorial review
|
|
2019-05-17 |
|
[ 360 ]
|
Comments for mandatory format to the ITU-R Recommendations assigned to ITU-R Working Party 1B
|
Chairman, SG 1 CG on editorial review
|
|
2019-05-17 |
|
[ 359 ]
|
Working document towards a preliminary draft new Recommendation ITU-R SM.[WPT-EV_FREQUENCIES] - Frequency ranges for operation of non-beam wireless power transmission systems for electric vehicles
|
Germany (Federal Republic of)
|
Q210/1, AI901
|
2019-05-15 |
|
[ 358 ]
|
Elements for a working document towards a preliminary draft new Report ITU-R SM.[WPT-REGULATION] - [Regulatory considerations of wireless power transmission (WPT)]
|
Germany (Federal Republic of)
|
Q210/1
|
2019-05-15 |
|
[ 357 ]
|
Elements for working document towards a preliminary draft new Recommendation ITU-R SM.[WPT-UNWANTED] - Emission fields in the spurious domain from WPT systems
|
International Amateur Radio Union (IARU)
|
AI9.1
|
2019-05-15 |
|
[ 356 ]
|
Reply from SAE J2954 on EV WPT EMI of harmonics 9.0 kHz to 30 MHz
|
Director, BR
|
|
2019-05-14 |
|
[ 355 ]
|
Liaison statement on draft new Recommendation ITU-T D.264 on "Shared use of spectrum and telecommunication infrastructure as possible methods for enhancing the efficiency of telecommunications"
|
ITU-T SG 3
|
|
2019-05-10 |
|
[ 354 ]
|
Preliminary draft new Recommendation ITU-R SM.[WPT-EV_FREQUENCIES] - Frequency ranges for operation of non-beam wireless power transmission systems for electric vehicles
|
United States of America
|
Q210/1
|
2019-05-09 |
|
[ 353 ]
|
Proposed suppression of elements for a working document towards a preliminary draft new Report ITU-R SM.[WPT-REGULATION]
|
United States of America
|
Q210/1
|
2019-05-09 |
|
[ 352 ]
|
Proposed revision to working document towards a preliminary draft new Report ITU-R SM.[SPECTRUM AUCTIONS]
|
United States of America
|
Q240/1
|
2019-05-09 |
|
[ 351 ]
|
Measurements of the Man-made Noise Floor
|
International Amateur Radio Union
|
|
2019-05-08 |
|
[ 350 ]
|
Recently published ECC Report 289 on wireless power transmission (WPT) systems for electrical vehicles (EV) operating within 79-90 KHz band
|
Netherlands (Kingdom of the)
|
|
2019-04-24 |
|
[ 349 ]
|
Liaison to ITU-R on proctection of Radio Services
|
International Special Committee on Radio Interference
|
|
2019-04-17 |
|
[ 348 ]
|
Liaison statement to Working Parties 3L and 3K (copy for information to Working Parties 1A, 1B and 5A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field)
|
WP 6A
|
|
2019-04-08 |
|
[ 347 ]
|
Liaison statement to Working Parties 1A and 1B (copy for information Working Parties 5A, 5B, and 7A) - Frequency use by non-beam Wireless Power Transmission (WPT) applications using inductive power transfer
|
WP 6A
|
|
2019-02-04 |
|
[ 346 ]
|
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Working Party 1B on economic aspects of spectrum management and sharing - ITU-D Study Group 1 Question 4/1: Economic policies and methods of determining the costs of services related to national telecommunications/information and communication technology networks, including next-generation networks
|
ITU-D SG 1
|
|
2019-03-26 |
|
[ 345 ]
|
Liaison statement on "Request to update the IoT and SC&C Standards Roadmap and the list of contact points"
|
JCA-IoT and SC&C
|
|
2019-01-08 |
|
[ 344 ]
|
Liaison statement - Evolution of magnetic field strength requirements in CISPR 14-1
|
International Special Committee on Radio Interference
|
|
2018-12-21 |
|
[ 343 ]
|
Liaison statement on ITU inter-Sector coordination
|
ITU-T TSAG
|
|
2018-12-17 |
|
[ 342 ]
|
Liaison statement - Discussion of a work proposal on spectrum sharing
|
ITU-T SG 12
|
|
2018-12-07 |
|
[ 341 ]
+Ann.1-8 |
Report on the sixth 2015-2019 meeting of Working Party 1B (Geneva, 16-20 November 2018)
|
Acting Chairman, WP 1B
|
|
2018-11-20 |
|
[ 340 ]
|
Final list of participants Working Party 1B (Geneva, 16 - 20 November 2018)
|
Director, BR
|
|
2018-11-20 |
|
[ 339 ]
|
Liaison statement to Working Parties 1A and 1B (copy for information to ICAO) - Aeronautical radionavigation service information for Wireless Power Transmission (WPT)
|
WP 5B
|
Q210/1
|
2018-11-16 |
|
[ 338 ]
|
List of documents issued (Documents 1B/303 - 1B/337)
|
BR Study Groups Department
|
|
2018-11-15 |
|
[ 337 ]
(Rev.1) |
Report on current status of WPT issues in CISPR - June to October 2018
|
SG 1 Rapp. to CISPR on WPT issues
|
|
2018-11-13 |
|
[ 336 ]
|
Liaison statement to Working Parties 1A and 3L (copy to Working Parties 1B, 5B and 6A) - Comments on Report ITU-R SM.[WPT_100-148.5kHz]
|
WP 5A
|
|
2018-11-09 |
|
[ 335 ]
|
Proposed modifications to Annex 4 to Document 1B/303 "Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]"
|
European Broadcasting Union
|
Q210/1, AI9.1
|
2018-11-09 |
|
[ 334 ]
|
Proposed modifications to Section 3 of Annex 4 to Document 1B/303 "Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]"
|
European Broadcasting Union
|
Q210/1, AI9.1
|
2018-11-09 |
Results:383 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):