Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 196 ]
(Rev.1) |
Liaison statement to Working Party 4B - Revision of Recommendation ITU-R BO./BT.1774 - Use of satellite and terrestrial broadcast infrastructures for public warning, disaster mitigation and relief
|
WP 6A
|
|
2015-08-03 |
|
[ 195 ]
|
Reply liaison statement to Working Party 4C, Study Group 4 and Study Group 5 (with information to Working Parties 3M, 4A, 4B, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
|
WP 5C
|
|
2015-07-16 |
|
[ 194 ]
|
Liaison statement to Working Party 4B - Preliminary draft new Recommendation ITU-R S.[SHORT-TERM-PERF] - Allowable short-term error performance for a satellite hypothetical reference digital path
|
WP 4A
|
|
2015-07-14 |
|
[ 193 ]
|
Liaison statement on the latest versions of the Access Network Transport (ANT) standards overview and work plan
|
ITU-T SG 15
|
|
2015-07-14 |
|
[ 192 ]
|
Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan (reply to SG15 LS216)
|
ITU-T SG9
|
|
2015-07-10 |
|
[ 191 ]
|
Liaison statement to Working Party 5B (copy for information to Working Parties 4B and 4C) - Comments on the working document towards a preliminary draft new Report ITU-R M.[UAS-FSS]
|
WP 4A
|
|
2015-07-01 |
|
[ 190 ]
|
Reply liaison statement to Study Group 5 (copy for information to Working Party 4B, 4C and 5D) - Coexistence issues between the satellite and terrestrial components of IMT and the proposed revision of Recommendation ITU-R M.1036-4
|
SG 4
|
|
2015-06-30 |
|
[ 189 ]
|
Liaison statement to Working Parties 3M, 4A, 4B, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10
|
WP 4C
|
|
2015-06-23 |
|
[ 188 ]
|
Liaison statement to Working Party 4C (copy for information to Study Groups 4 and 5 and Working Party 4B) - Coexistence issues between the satellite and terrestrial components of IMT and the proposed revision of Recommendation ITU-R M.1036-4
|
WP 5D
|
|
2015-06-22 |
|
[ 187 ]
|
Liaison statement to Working Party 4B - Review of ITU-R Resolutions and Opinion on IMT
|
WP 5D
|
|
2015-06-22 |
|
[ 186 ]
+Ann.1-11 |
Report on the thirty-eighth meeting of Working Party 4B (Geneva, 15-19 June 2015)
|
Chairman, WP 4B
|
|
2015-06-19 |
|
[ 185 ]
|
Final list of participants - Working Party 4B (Geneva, 15-19 June 2015)
|
Director, BR
|
|
2015-06-19 |
|
[ 184 ]
|
Draft reply liaison statement to Working Party 5D - Review of ITU-R Resolutions and Opinion on IMT
|
Chairman, WP 4B
|
|
2015-06-15 |
|
[ 183 ]
|
Reply liaison statement to Working Party 5D (copy for information to Study Groups 4 and 5 and Working Party 4B) - Coexistence issues between the satellite and terrestrial components of IMT and the proposed revision of Recommendation ITU-R M.1036-4
|
WP 4C
|
|
2015-06-12 |
|
[ 182 ]
|
List of documents issued (Documents 4B/162 - 4B/182)
|
BR Study Groups Department
|
|
2015-06-12 |
|
[ 181 ]
|
Proposed draft new Recommendation ITU-R S.[SHORT-TERM-PERF] - Allowable short-term error performance for a satellite hypothetical reference digital path
|
Korea (Republic of)
|
277/4
|
2015-06-05 |
|
[ 180 ]
|
Proposed draft revision of Recommendation ITU-R M.2014 - Global circulation of IMT-2000 satellite terminals
|
Korea (Republic of)
|
229-3/5
|
2015-06-05 |
|
[ 179 ]
|
Proposed working document towards a preliminary draft new Report ITU-R BO.[UHDTV-SAT EXP] - Satellite transmission experiments for UHDTV satellite broadcasting
|
Japan
|
|
2015-06-03 |
|
[ 178 ]
|
A preliminary draft new Recommendation ITU-R BO.[UHDTV_TRANSMISSION] - Transmission system for UHDTV satellite broadcasting
|
Japan
|
|
2015-06-03 |
|
[ 177 ]
|
Draft new Question ITU-R BO.[UHDTV_SAT]/4 - Studies on UHDTV satellite broadcasting system
|
Japan
|
|
2015-06-03 |
|
[ 176 ]
|
Compatibility and sharing between terrestrial an satellite components of IMT in frequency bands around 2 GHz
|
Director, BR
|
|
2015-05-07 |
|
[ 175 ]
|
Liaison statement to Working Party 4B - Transmission systems for UHDTV satellite broadcasting
|
WP 6A
|
|
2015-03-16 |
|
[ 174 ]
|
Liaison statement to Working Party 4B - DVB-S2X: the extensions of the 2nd generation standard for satellite broadband services
|
WP 6B
|
|
2015-02-11 |
|
[ 173 ]
|
Liaison statement to Working Party 4B on the review of ITU-R Resolutions and Opinion
|
WP 5D
|
|
2015-02-11 |
|
[ 172 ]
|
Liaison statement to ITU-T Study Group 13 and ITU-R Working Parties 4B and 5C (copy to ITU-D Study Groups 1 and 2) - Handbook on "Global trends in IMT"
|
WP 5D
|
|
2015-02-10 |
|
[ 171 ]
|
Reply liaison statement on hybrid satellite systems
|
ITU-T SG 5
|
|
2015-02-10 |
|
[ 170 ]
|
Liaison statement on scope of work of ITU-D Question 2/1 - Broadband access technologies, including IMT, for developing countries
|
ITU-D SG 1
|
|
2015-02-10 |
|
[ 169 ]
|
Liaison statement on new version of the Home Network Transport (HNT) standardization overview and work plan
|
ITU-T SG 15
|
|
2015-01-07 |
|
[ 168 ]
|
Liaison statement on new versions of the Access Network Transport (ANT) standardization overview and work plan
|
ITU-T SG 15
|
|
2015-01-07 |
|
[ 167 ]
|
Liaison statement to ITU-R Working Parties 4A and 4B (copy for information to Working Party 4C) - WRC-15 agenda item 1.5
|
WP 5B
|
|
2014-12-10 |
|
[ 166 ]
|
Liaison statement to Working Party 4B - Transmission systems for UHDTV satellite broadcasting
|
WP 6B
|
|
2014-12-02 |
|
[ 165 ]
|
Reply liaison statement to Working Party 4C (copy for information to Working Party 4B and Study Groups 4 and 5) - Revision of Recommendation ITU-R M.1036-4 and coexistence issues between the satellite and terrestrial components of IMT
|
WP 5D
|
|
2014-10-30 |
|
[ 164 ]
|
Liaison statement on a new study for high speed transmission scheme by channel bonding technology for UHDTV distribution on cable TV networks
|
ITU-T SG 9
|
|
2014-10-03 |
|
[ 163 ]
|
Liaison statement to Working Party 4B - Guidance on the application of propagation Recommendations to unmanned aircraft systems (WRC-15 agenda item 1.5)
|
WP 3K
|
|
2014-09-12 |
|
[ 162 ]
+Ann.1-12 |
Report on the thirty-seventh meeting of Working Party 4B (Geneva, 30 June - 4 July 2014)
|
Chairman, WP 4B
|
|
2014-07-04 |
|
[ 161 ]
|
Final list of participants - Working Party 4B (Geneva, 30 June - 4 July 2014)
|
Director, BR
|
|
2014-07-04 |
|
[ 160 ]
|
List of documents issued (Documents 4B/139 - 4B/160)
|
BR Study Groups Department
|
|
2014-06-27 |
|
[ 159 ]
|
Liaison statement to Working Party 5D (copy for information to Working Party 4B and Study Group 4) - Proposal on the revision of Recommendation ITU-R M.1036-4
|
WP 4C
|
|
2014-06-27 |
|
[ 158 ]
|
Proposal for reply liaison statement to Working Party 5B - WRC-15 agenda item 1.5
|
Germany (Federal Republic of)
|
|
2014-06-23 |
|
[ 157 ]
|
Liaison statement to ITU-R Working Party 4B - Information on some ongoing work within the Satellite Emergency Communication work group of ETSI TC SES
|
European Telecommunications Standards Institute
|
|
2014-06-19 |
|
[ 156 ]
|
Working document towards preliminary draft new Recommendation/Report ITU-R M.[PERF-INTEG-MSS] - Scenarios and performance of an integrated MSS system operating in frequency bands below 3 GHz
|
Korea (Republic of)
|
|
2014-06-18 |
|
[ 155 ]
|
Proposed preliminary draft new Recommendation ITU-R S.[SHORT-TERM-PERF] - Allowable short-term error performance for a satellite hypothetical reference digital path
|
Korea (Republic of)
|
277/4
|
2014-06-18 |
|
[ 154 ]
|
Proposed modifications to a preliminary draft new Report ITU-R S.[MULTI_POL] - Multi-dimensional signal mapping technique for satellite communications contained in Annex 4 to Working Party 4B Chairman's Report
|
Japan
|
46-3/4
|
2014-06-17 |
|
[ 153 ]
|
Proposed working document towards a preliminary draft new Recommendation ITU-R BO.[UHDTV_TRANSMISSION] - Transmission system for UHDTV satellite broadcasting
|
Japan
|
|
2014-06-17 |
|
[ 152 ]
|
Proposed modifications to a preliminary draft revision of Report ITU-R S.2173 contained in Annex 3 to Working Party 4B Chairman's Report
|
Japan
|
46-3/4
|
2014-06-17 |
|
[ 151 ]
|
Draft new Recommendation ITU-R S.[DIGCID]- Carrier identification system for digital-modulation transmissions for fixed-satellite service (FSS) occasional use (OU) carrier earth station transmissions
|
Japan
|
271/4
|
2014-06-17 |
|
[ 150 ]
|
Liaison statement to Working Party 4B - Hybrid satellite systems
|
ITU-T SG 5
|
|
2014-06-06 |
|
[ 149 ]
|
Liaison statement to Working Party 4C (copied for information to Working Parties 3M, 4A, 4B, 5C, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
|
WP 5A
|
|
2014-06-03 |
|
[ 148 ]
|
Liaison statement to Working Parties 4C and 5B (copy for information to Working Parties 3M, 4A, 4B, 5A, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10
|
WP 5C
|
|
2014-05-28 |
|
[ 147 ]
|
Liaison statement to Working Party 4C (copy to Working Parties 3M, 4A, 4B, 5A, 5B and 7B for information) - WRC-15 agenda item 1.9.2
|
WP 5C
|
|
2014-05-28 |
Results:196 total items. Result page:
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):