ITU Sectors
Newsroom
Events
Publications
Statistics
About ITU
 
Office of the Secretary General
Office of the Secretary General
Office of the Secretary General
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Standardization (ITU-T)
Standardization (ITU-T)
Standardization (ITU-T)
Development (ITU-D)
Development (ITU-D)
Development (ITU-D)
ITU TELECOM
ITU TELECOM
ITU TELECOM
 
Calendar of Events
Calendar of Events
Calendar of Events
Today's Meetings 
Today's Meetings 
Today's Meetings 
Internet Webcast Service 
Internet Webcast Service 
Internet Webcast Service 
Search 
Search 
Search 
 
All Sectors
All Sectors
All Sectors
ITU-R
ITU-R
ITU-R
ITU-T
ITU-T
ITU-T
ITU-D
ITU-D
ITU-D
General Secretariat
General Secretariat
General Secretariat
 
ITU Publications 
ITU Publications 
ITU Publications 
Publications by Sector
Publications by Sector
Publications by Sector
 
General Secretariat and ITU Telecom
General Secretariat and ITU Telecom
General Secretariat and ITU Telecom
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Radiocommunication (ITU-R)
Standardization (ITU-T)
Standardization (ITU-T)
Standardization (ITU-T)
Development (ITU-D)
Development (ITU-D)
Development (ITU-D)
 
International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP1C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1C  C 

ITU-R WP1C

Spectrum Monitoring

Results:174 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 174 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Working document toward a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5A     2015-08-26
[ 173 ]  
 
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 1C, 5B, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than a radio frequency beam     WP 6A     2015-08-03
[ 172 ]  
 
Liaison statement on radio frequency interference and co-existence between wired telecommunication and radiocommunication systems (reply to ITU-R WP 5B - 5B/TEMP/372)     ITU-T SG9     2015-07-14
[ 171 ]  
 
Liaison statement to ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 6A, 7D and ITU-T Study Groups 9 and 15) - ITU-R interest in K-series Recommendations     WP 1A     2015-06-12
[ 170 ]  
 
Liaison statement to Working Party 3L (copy to ITU-R Working Parties 1C, 4C, 5A, 5B, 5C, 5D, 6A, and 7D and to ITU-T Study Groups 5, 9, and 15) - Evaluating the leakage and impact of radio frequency noise from telecommunication systems using metallic conductors     WP 1A     2015-06-12
[ 169 ]  
+Ann.1-10 
Report of the meeting of Working Party 1C (Geneva, 3 - 10 June 2015)     Chairman, WP 1C     2015-06-10
[ 168 ]  
(Rev.1) 
Final list of participants - Working Party 1C (Geneva, 3-10 June 2015)     Director, BR     2015-06-09
[ 167 ]  
 
List of documents issued (Documents 1C/119 - 1C/167)     BR Study Groups Department     2015-06-02
[ 166 ]  
 
Report of Correspondence Group Activity on preliminary draft new Recommendation ITU-R SM.[ Doc.XXX] - Proposal for a new Recommendation on alternative test procedure for measuring accuracy and immunity of direction finder using a simulator     CG on DF Accuracy     2015-05-27
[ 165 ]  
 
Report of Correspondence Group Activity on preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurement of DF Accuracy     CG on DF Accuracy     2015-05-27
[ 164 ]  
 
Critical area for measuring and setting synchronization in medium frequency     Iran (Islamic Republic of)     2015-05-27
[ 163 ]  
 
Proposed preliminary draft revision of Recommendation ITU-R SM.1753-2 - Methods for measurements of radio noise     Japan     2015-05-27
[ 162 ]  
 
Proposal for a preliminary draft new Recommendation ITU-R SM.[Precision of time information in output data of monitoring receivers] - Precision of time information in output data of monitoring receivers     Japan     2015-05-27
[ 161 ]  
 
Proposal for a preliminary draft new Recommendation on alternative test procedure for measuring accuracy and immunity of direction finder using a simulator     Japan     2015-05-27
[ 160 ]  
 
Proposed revision to Report ITU-R SM.2130 - Inspection of radio stations     Korea (Republic of)     2015-05-27
[ 159 ]  
 
Proposal on the modification of the working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-Site Measurements of DF Accuracy     China (People's Republic of)     2015-05-22
[ 158 ]  
 
Proposed revisions to Recommendation ITU-R SM.1880 - Spectrum occupancy measurement     China (People's Republic of)     2015-05-22
[ 157 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum monitoring evolution     Chairman, CG on Spectrum Monitoring Evolution     2015-05-22
[ 156 ]  
 
Working document towards a preliminary draft new Report - Measurement techniques and new technologies for satellite monitoring     China (People's Republic of)     2015-05-22
[ 155 ]  
 
Working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurement of DF accuracy     China (People's Republic of)     2015-05-22
[ 154 ]  
 
Proposed contribution to the working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - The grid monitoring experimental network for metropolitan environment in Shanghai, China     China (People's Republic of)     2015-05-22
[ 153 ]  
 
Proposal for a new Recommendation on test procedure for measuring direction finder sensitivity - Test procedure for measuring direction finder sensitivity     China (People's Republic of)     2015-05-22
[ 152 ]  
 
Review of working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE-DF-ACC] - On-site measurements of DF accuracy     Greece     2015-05-22
[ 151 ]  
 
RF Human hazards - ITU Intersectoral activities     Israel (State of)     2015-05-21
[ 150 ]  
 
Preliminary draft new Report ITU-R SM.[PLANNING_SMN] - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency range     Chairman CG on Planning SMN     2015-05-20
[ 149 ]  
(Rev.1) 
Comments on the working document toward a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurements of DF accuracy     GEW Technologies (Pty) Ltd.     2015-05-14
[ 148 ]  
 
Review of working document towards a preliminary draft new Recommendation ITU-R SM.[ON-SITE_DF_ACC] - On-site measurements of DF accuracy     MEDAV GmbH     2015-05-14
[ 147 ]  
 
Proposal for the revision of Recommendation ITU-R SM.1600 - Technical identification of digital signals     United States of America     2015-05-13
[ 146 ]  
 
Proposed modifications to Report ITU-R SM.2257-2 - Spectrum management and monitoring during major events     Indonesia (Republic of)     2015-05-08
[ 145 ]  
 
Preliminary draft new Recommendation ITU-R SM.[DOC. _ _ _ _] - Inserting highly precise time information in I/Q data of monitoring receivers     GEW Technologies (Pty) Ltd.     2015-04-30
[ 144 ]  
 
Report to Working Party 1C on the review of ITU-R Recommendations in the SM Series for the database on ITU-R Recommendations     Brazil (Federative Republic of)     2015-04-24
[ 143 ]  
 
Spectrum management activities for the FIFA Soccer World Cup 2014 Brazil     Brazil (Federative Republic of)     2015-04-24
[ 142 ]  
 
Working document towards the Report ITU-R SM.[PLANNING_SMN] - Optimization of the planning of spectrum monitoring networks topology in VHF/UHF range using irregular model of monitoring networks     Ukraine     2015-03-18
[ 141 ]  
 
Liaison statement to ITU-R Study Groups 1, 3, 4, 5 and 7, ITU-T Study Group 5 and ITU-D Study Groups 1 and 2 - Human exposure to RF fields from broadcast transmitters     WP 6A     2015-03-03
[ 140 ]  
 
Proposal for revision of Report ITU -R SM.2256 - Spectrum occupancy measurements and evaluation     Russian Federation     2015-02-25
[ 139 ]  
 
Draft revision of Recommendation ITU -R SM.1880 - Spectrum occupancy measurement     Russian Federation     2015-02-25
[ 138 ]  
 
This document has been withdrawn     BR Study Groups Department     2015-02-25
[ 137 ]  
 
Liaison statement on comments to the WHO Monograph "Radio Frequency fields: Environmental Health Criteria, Chapter 2: Sources, measurements and exposures"     ITU-T SG 5     2015-02-11
[ 136 ]  
 
Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     WP 5D     2015-02-10
[ 135 ]  
 
Liaison statement on ITU-T Question 7/5 work items for the 2014-2018 study period (reply to ITU-D Study Group 2 - Document 2/113)     ITU-T SG 5     2015-02-10
[ 134 ]  
 
Results of the 21st RAG meeting (Geneva, 24 to 27 June 2014)     Chairman, SG 1     2015-02-06
[ 133 ]  
 
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 , ITU-R Study Group 1, ITU-R Study Group 5, ITU-R Study Group 6 and their relevant Working Parties on Q7/2 work items for the 2014 - 2018 study period     ITU-D SG 2     2014-11-17
[ 132 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems     WP 5A     2014-11-10
[ 131 ]  
 
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz     WP 5B     2014-11-05
[ 130 ]  
 
RF Human hazards - Intersectoral activities     Israel (State of)     2014-10-26
[ 129 ]  
 
Liaison statement to Working Party 1C - Working document towards a preliminary draft new Report ITU-R RA.[SATMON]     WP 7D   227/7   2014-10-17
[ 128 ]  
 
Liaison statement on leakage of radio frequency energy from J.HiNoC systems and coexistence of wired telecommunications with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195.1 (J.HINOC-REQ)     ITU-T SG 9     2014-09-30
[ 127 ]  
 
Reply liaison statement to Working Party 1C - Information documents on indoor noise measurement     WP 3L     2014-09-15
[ 126 ]  
 
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5     ITU-T WP 2/5     2014-08-08
[ 125 ]  
 
Liaison statement to ITU-T Study Groups 5 and 9, and ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C and 7D - Leakage of radio frequency energy from J.HiNoC systems     WP 1A     2014-06-20
Results:174 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-08-28