| Contributions  | 
| 
 | Number 
 | Title | Source | AI/Question 
 | Date | 
|  | [ 636 ] 
 | Liaison statement on possible disturbance/interference between radio devices and broadband cable and TV networks | ITU-T SG 9 |  | 2011-12-14 | 
|  | [ 635 ] 
 | Liaison statement on radio connection to hearing aids | ITU-T SG 16 |  | 2011-12-14 | 
|  | [ 634 ] 
 | Reply liaison statement related to "Further work on Power Line Telecommunications" | ITU-T SG 9 |  | 2011-12-14 | 
|  | [ 633 ] 
 | ITU-R Study Group 1 Recommendation ITU-R SM.1879-1 to be brought to the attention of Study Group 6 | BR Study Group Department |  | 2011-11-25 | 
|  | [ 632 ] 
 | Liaison statement to Working Party 5D (copy to Working Parties 5A, 4A, 6A and 7B for information) - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R 1581-3 | WP 5B |  | 2011-11-18 | 
|  | [ 631 ] 
 | Liaison statement to Working Parties 5A and 6A - Status of studies in support of potential joint development of ITU-R Recommendations/Reports on harmonization of ENG | WP 5C |  | 2011-11-16 | 
|  | [ 630 ] 
 | Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Draft revision of Recommendation ITU-R F.758-4 | WP 5C |  | 2011-11-16 | 
|  | [ 629 ] 
 | ITU-R Study Group 1 Recommendation to be brought to the attention of Study Groups 4, 5, 6 and 7 | BR Study Group Department |  | 2011-11-03 | 
|  | [ 628 ] 
 | ITU-R Study Group 1 Question to be brought to the attention of Study Groups 4, 5, 6 and 7 | BR Study Group Department |  | 2011-11-03 | 
|  | [ 627 ] 
 | ITU-R Study Group 1 Recommendation to be brought to the attention of Study Group 6 | BR Study Group Department |  | 2011-11-03 | 
|  | [ 626 ] 
 | Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Handbook on "Propagation information for the prediction of interference and coordination distance" | SG 3 |  | 2011-10-31 | 
|  | [ 625 ] 
 | Reply liaison statement to Working Party 1A (copy to Working Party 6A for information) - Question ITU-R 230-1/3 on "Prediction methods and models applicable to power line telecommunications systems" | SG 3 | 230-1/3 | 2011-10-31 | 
|  | [ 624 ] 
 | Liaison statement to Working Party 6A - Ground-wave propagation handbook | SG 3 |  | 2011-10-31 | 
|  | [ 623 ] 
 | Reply liaison statement to Working Party 6A - Impact of global warming on ITU-R Recommendations - Interference assessment over cold and warm sea paths | WP 3K |  | 2011-10-26 | 
|  | [ 622 ] 
 | Liaison statement to Working Party 6A - Compatibility studies in relation to Resolution 224 | WP 5D |  | 2011-10-26 | 
|  | [ 621 ] 
 | Liaison statement to IEC TC100 on Wireless connections to hearing aids | ITU-T FG AVA |  | 2011-10-14 | 
|  | [ 620 ] 
 | Liaison statement to Working Party 5D (copy to WPs 4A, 5A, 5B and 6A for information) - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3 | WP 7B |  | 2011-10-13 | 
|  | [ 619 ] +Ann.1-20
 | Report of the meeting of Working Party 6A (Geneva, 27 September to 5 October 2011) | Chairman, WP 6A |  | 2011-10-06 | 
|  | [ 618 ] 
 | Final List of Participants - Working Party 6A (Geneva, 27 September to 5 October 2011) | Director, BR |  | 2011-10-05 | 
|  | [ 617 ] 
 | Proposal for action on some terms and definitions related to broadcasting | SG 6 Rapporteur to the CCV |  | 2011-10-03 | 
|  | [ 616 ] 
 | Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Party 1A) - A database for the protection of radio services | WP 4A |  | 2011-09-29 | 
|  | [ 615 ] 
 | Liaison statement to Working Party 5D (copy to Working Parties 5A, 5B, 6A and 7B for information) - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3 | WP 4A |  | 2011-09-29 | 
|  | [ 614 ] 
 | Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working parties 1A, 4A) - A database for the protection of radio services | WP 4C |  | 2011-09-28 | 
|  | [ 613 ] 
 | Liaison statement to Working Parties 6A and 6B | WP 4B |  | 2011-09-26 | 
|  | [ 612 ] 
 | List of documents issued | BR Study Group Department |  | 2011-09-26 | 
|  | [ 611 ] (Rev.1)
 | Status Report on preparation of Handbook on digital terrestrial television (DTTB) implementation | RG Handbook on DTTB implementation |  | 2011-09-26 | 
|  | [ 610 ] 
 | Study Group 6 receives Emmy Award 2011 for Recommendation ITU-R BS.1770-2 | Chairman, SG 6 |  | 2011-09-23 | 
|  | [ 609 ] 
 | Studies called for under Resolution 224 (WRC-07) within Working Party 6A consistent with the views of the Chairmen of Study Group 5 and Study Group 6 - Draft Report on intercessional activities | RG on Studies under Resolution 224 |  | 2011-09-22 | 
|  | [ 608 ] 
 | The co-existence of LTE and digital TV services at UHF: A field trial | United Kingdom of Great Britain and Northern Ireland | 4-2/6, 132-1/6, 114/6 | 2011-09-20 | 
|  | [ 607 ] 
 | Technical analysis of LTE 800 MHz base station interference into DTT receivers | United Kingdom of Great Britain and Northern Ireland | 4/6, 132/6, 114/6 | 2011-09-20 | 
|  | [ 606 ] 
 | Protection ratio measurements LTE 800 MHz base station interference into DTT receivers | United Kingdom of Great Britain and Northern Ireland | 4-2/6, 132-1/6, 114/6 | 2011-09-20 | 
|  | [ 605 ] 
 | Additional DVB-T receiver protection ratio and overload threshold measurements under LTE BS interference with different LTE traffic loadings | Philips International B.V. |  | 2011-09-20 | 
|  | [ 604 ] 
 | Proposed liaison statement to Working Party 5D - Compatibility studies in relation to Resolution 224 (Rev.WRC-07) and Question ITU-R 229/5 | NDR
          	    ,
        	    Free TV Australia Ltd.
          	    ,
        	    Zweites Deutsches Fernsehen (ZDF) |  | 2011-09-20 | 
|  | [ 603 ] 
 | Preliminary draft new Report ITU-R BT.[CS] - Compatibility Studies in the band 790-862 MHz | RG on Studies under Resolution 224 |  | 2011-09-20 | 
|  | [ 602 ] 
 | Preliminary draft new Report - Areas for compatibility studies between digital terrestrial television broadcasting services and other services | RG on Studies under Resolution 224 |  | 2011-09-20 | 
|  | [ 601 ] 
 | Concerns on preliminary draft new Report ITU-R BT.[COMPENDIUM] | Korea (Republic of) |  | 2011-09-19 | 
|  | [ 600 ] 
 | Review of Recommendations and Reports within the purview of Working Party 6A | Korea (Republic of) |  | 2011-09-19 | 
|  | [ 599 ] 
 | Proposed draft new Recommendation ITU-R BT.[ETMM] - Error-correction, data framing, modulation and emission methods for terrestrial multimedia broadcasting for mobile reception using handheld receivers in VHF/UHF bands | Korea (Republic of) | 45-2/6, 31/6 | 2011-09-19 | 
|  | [ 598 ] 
 | Report on developments on PLT since the sixth meeting of Study Group 6 | RG PLT |  | 2011-09-20 | 
|  | [ 597 ] 
 | Proposed revisions to preliminary draft new Recommendation ITU-R BT.[ETMM] - Error-correction, data framing, modulation and emission methods for terrestrial multimedia broadcasting for mobile reception using handheld receivers in VHF/UHF bands | Ukraine | 69-1/6 | 2011-09-19 | 
|  | [ 596 ] 
 | Proposed draft revision of Recommendation ITU-R BT.1833-1 - Broadcasting of multimedia and data applications for mobile reception by handheld receivers | Ukraine | 69-1/6 | 2011-09-19 | 
|  | [ 595 ] 
 | Preliminary draft new Report - A conceptual method for the representation of loss of broadcast coverage | RG on Studies under Resolution 224 |  | 2011-09-19 | 
|  | [ 594 ] +Corr.1
 | Preliminary draft new Report - A generic methodology for assessing interference from cellular mobile networks into broadcast reception | RG on Studies under Resolution 224 |  | 2011-09-19 | 
|  | [ 593 ] 
 | Preparation of new Question on the study of worldwide broadcasting roaming | Russian Federation |  | 2011-09-19 | 
|  | [ 592 ] 
 | Results of field strength and consistent reception test for DVB-T/T2 digital terrestrial broadcasting on the border of transmitting station service area | Russian Federation | 4-2/6, 132-1/6 | 2011-09-19 | 
|  | [ 591 ] 
 | Frequency band using for electronic news gathering, outside broadcast and program field production | Regional Commonwealth in the Field of Communications | 89/6 | 2011-09-19 | 
|  | [ 590 ] 
 | Proposed liaison statement to Study Group 1 and Working Party 1C - DVB-T coverage measurements and verification of planning criteria | Free TV Australia Ltd. |  | 2011-09-19 | 
|  | [ 589 ] 
 | Proposed Question to ITU-R Working Party 3K - Impact of global warming on ITU-R Recommendations - Interference assessment over cold and warm sea paths | Free TV Australia Ltd. |  | 2011-09-19 | 
|  | [ 588 ] 
 | Proposed liaison statement to Study Group 1 and Working Party 1B - Technical and operating parameters and spectrum use for short-range radiocommunication devices | Free TV Australia Ltd. |  | 2011-09-19 | 
|  | [ 587 ] 
 | Working document towards a preliminary draft new Recommendation ITU-R BT.[DTVRX] - Characteristics of a reference receiving system for frequency planning of digital terrestrial television systems | Free TV Australia Ltd. | 4-2/6, 14/6, 132-1/6, 114/6, 105/6 | 2011-09-19 | 
| Results:636 total items. Result page: 	
	1 -
	2 - 
     	3 - 
     	4 - 
     	5 - 
     	6 - 
     	7 - 
     	8 - 
     	9 - 
     	10 - 
     	11 - 
     	12 - 
     	13
	   - Next
  
 | 
Multiple Document Download: Formats and Languages to be included (when available):