Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 54 ]
+Ann.1-3 |
Chairman's report - Meeting 11-14 September 2007
|
Chairman, WP 7A
|
|
2007-09-14 |
|
[ 53 ]
|
Final List of Participants - Working Party 7A
Geneva, 11-14 September 2007
|
Director, BR
|
|
2007-09-14 |
|
[ 52 ]
|
List of documents issued
|
BR Study Group Department
|
|
2007-09-05 |
|
[ 51 ]
|
Note on Coordinated Universal Time UTC
|
BIPM
|
|
2007-09-04 |
|
[ 50 ]
|
Information document - Interference between standard frequency and time signal services operating between 20 and 90 kHz
|
Japan
|
102/7
|
2007-09-03 |
|
[ 49 ]
|
Information document - Questionnaire on "Possible future change to Coordinated Universal Time (UTC)" in Japan
|
Japan
|
236/7
|
2007-09-03 |
|
[ 48 ]
|
Proposed Preliminary draft new ITU-R Recommendation - Internal time scales for communication and navigation systems
|
United States of America
|
|
2007-08-30 |
|
[ 47 ]
|
Proposals for revision of Recommendation ITU-R TF.460-6
|
Italy
|
236/7
|
2007-08-30 |
|
[ 46 ]
|
Liaison statement to Working Parties 6E, 7A, 7B, 7C, 7D, 8A, 8B, 8F, 9A and 9C - Interference protection requirements from power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
WP 1A
|
|
2007-06-19 |
|
[ 45 ]
(Rev.1) |
Proposed Draft New Question - Application and improvement of two-way satellite time and frequency transfer (TWSTFT)
|
Germany (Federal Republic of)
|
|
2007-05-08 |
|
[ 44 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database
|
Coordination Committee for Vocabulary (CCV)
|
|
2007-01-11 |
|
[ 43 ]
+Ann.1-4 |
Chairman's report - meeting 29 August - 1 September 2006
|
Chairman, WP 7A
|
|
2006-09-04 |
|
[ 42 ]
|
Final List of Participants
|
Director, BR
|
|
2006-08-31 |
|
[ 41 ]
|
List of documents issued
|
BR Study Group Department
|
|
2006-08-28 |
|
[ 40 ]
|
Interference between standard frequency and time signal services operating between 20 and 90 kHz
|
Japan
|
102/7
|
2006-08-18 |
|
[ 39 ]
|
Information document - Report on the last leap second adjustment in Japan
|
Japan
|
236/7
|
2006-08-18 |
|
[ 38 ]
|
Contribution to the discussion on the future of the UTC time scale
|
United States of America
|
236/7
|
2006-08-17 |
|
[ 37 ]
|
Proposed modification of Recommendation ITU-R TF.583 - Information document, regarding IRIG codes
|
Germany (Federal Republic of)
|
239/7
|
2006-08-09 |
|
[ 36 ]
|
Proposed modification of revised Recommendation ITU-R TF.460-6 - Standard-frequency and time signal emissions
|
Germany (Federal Republic of)
|
102/7
|
2006-08-09 |
|
[ 35 ]
|
Contribution to the discussion on the future of the UTC time scale
|
Russian Federation
|
236/7
|
2006-08-07 |
|
[ 34 ]
|
Liaison statement from WP 1B to SG 7
|
WP 1B
|
|
2006-02-03 |
|
[ 33 ]
+Ann.1-5 |
Chairman's report - meeting 8-11 November 2005
|
Chairman, WP 7A
|
|
2005-11-15 |
|
[ 32 ]
|
Final List of Participants - Working Party 7A
|
Director, BR
|
|
2005-11-10 |
|
[ 31 ]
|
List of documents issued
|
BR Study Group Department
|
|
2005-11-07 |
|
[ 30 ]
|
Proposed draft new Question - Interference to standard frequency and time-signal services caused by noise from electrical appliances
|
Japan
|
|
2005-10-28 |
|
[ 29 ]
|
PDNR - Interference between standard frequency and time signal services operating at low frequencies
|
Japan
|
|
2005-10-28 |
|
[ 28 ]
|
Contribution to the discussion on the future of the UTC time scale - Question ITU-R 236/7 and Recommendation ITU-R TF.460-6
|
United Kingdom of Great Britain and Northern Ireland
|
236/7
|
2005-10-27 |
|
[ 27 ]
|
Contribution to the draft revised Recommendation ITU-R TF.460-6
|
Italy
|
236/7
|
2005-10-21 |
|
[ 26 ]
|
Proposed modification of revised Recommendation ITU-R TF.460-6
|
France
|
102/7
|
2005-10-18 |
|
[ 25 ]
|
Information document on interference between standard frequency and time signal services operating between 20 and 90 kHz
|
United States of America
|
102/7
|
2005-10-18 |
|
[ 24 ]
|
Liaison statement to Working Party 7A - Necessary bandwidth of standard frequency and time signals
|
WP 1A
|
|
2005-10-04 |
|
[ 23 ]
|
Contribution to the discussion on the future of the UTC time scale - Question ITU-R 236/7 and Recommendation ITU-R TF.460
|
Germany (Federal Republic of)
|
236/7
|
2005-09-21 |
|
[ 22 ]
|
Liaison statement to WPs 3L, 6E, 7A, 7D, 8A, 8B and 9C - Impact of cable and power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
WP 1A
|
|
2004-10-20 |
|
[ 21 ]
+Ann.1-5 |
Report on the meeting of Working Party 7A, Geneva, 28 September to 1 October 2004
|
Chairman, WP 7A
|
|
2004-10-01 |
|
[ 20 ]
|
Final List of Participants - Working Party 7A
|
Director, BR
|
|
2004-09-30 |
|
[ 19 ]
|
List of documents issued
|
BR Study Group Department
|
|
2004-09-27 |
|
[ 18 ]
|
Progress Report towards the meeting of Working Party 7A
|
Chairman, WP 7A
|
|
2004-09-27 |
|
[ 17 ]
|
Working document to the preliminary draft new Recommendation "Time scale based on pulsar timing"
|
Russian Federation
|
205/7
|
2004-09-20 |
|
[ 16 ]
|
Proposed new Question ITU-R XXX - Interference between standard frequency and time signal services operating at low frequency
|
United States of America
|
|
2004-09-01 |
|
[ 15 ]
|
Proposed revised Recommendation ITU-R TF.460-6 - Standard-frequency and time-signal emissions
|
United States of America
|
|
2004-09-01 |
|
[ 14 ]
|
Liaison statement to WPs 7A, 8A, 8B and 9C - Compatibility between radiocommunication systems and high data rate telecommunication systems using electricity power supply or telephone distributing wiring
|
WP 1A
|
221/1
|
2003-11-06 |
|
[ 13 ]
(Rev.1) |
Liaison statement to Working Party 7A - Draft revision of Recommendation ITU-R SM.1541 - Annex 7
|
WP 1A
|
|
2003-11-05 |
|
[ 12 ]
|
Review of ITU-R Recommendations by Study Group 7
|
Vice-Chairman, SG 7
|
|
2003-10-09 |
|
[ 11 ]
|
Report of the meeting of Working Party 7A
|
Chairman, WP 7A
|
|
2003-10-08 |
|
[ 10 ]
|
Final List of Participants - Working Party 7A
|
Director, BR
|
|
2003-10-07 |
|
[ 9 ]
|
List of documents issued
|
BR Study Group Department
|
|
2003-10-03 |
|
[ 8 ]
|
WRC-07 Agenda Items and allocation of preparatory work by the CPM06-1 to responsible, contributing and interested groups involving Study Group 7
|
BR Study Group Department
|
|
2003-10-03 |
|
[ 7 ]
|
Progress Report towards the meeting of Working Party 7A
|
Chairman, WP 7A
|
|
2003-10-03 |
|
[ 6 ]
|
Working document to the preliminary draft new Recommendation - Time scale based on pulsar timing
|
Russian Federation
|
205/7
|
2003-10-01 |
|
[ 5 ]
|
Information document for Liaison statement to WP 1A - Survey results on specification of equipments using band 5 of SFTS
|
Japan
|
222/1
|
2003-09-29 |
Results:54 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):