Documents Temporaires    | 
	              
	             
 | 
Numéro  
	             
 | 
Titre
 | 
Source
 | 
AI/Question 
 | 
Date
 | 
 | 
[ 95 ]
		 
	              | 
Validation examples for prediction methods in Recommendation ITU-R P.530
		 
		  | 
WP 3M
   		  | 
204/3
   		  | 
2006-10-06 | 
 | 
[ 94 ]
		 
	              | 
Element for the Chairman's Report
		 
		  | 
WP 3M
   		  | 
   		  | 
2006-10-06 | 
 | 
[ 93 ]
		 
	              | 
Element for WP 3M Chairman's report - Status of data banks
		 
		  | 
WP 3M
   		  | 
   		  | 
2006-10-05 | 
 | 
[ 92 ]
		 
	              | 
Annex 5 to WP 3M Chairman's Report - Recommendation ITU-R P.618: Proposed revision and future work
		 
		  | 
WP 3M
   		  | 
   		  | 
2006-10-05 | 
 | 
[ 91 ]
		 
	              | 
Proposed revision to Recommendation ITU-R P.1144-3 - Guide to the application of the propagation methods of Radiocommunication Study Group 3
		 
		  | 
WP 3M
   		  | 
   		  | 
2006-10-05 | 
 | 
[ 90 ]
		 
	              | 
Proposed revision to Recommendation ITU-R P.682-1 - Propagation data required for the design of Earth-space aeronautical mobile telecommunication systems
		 
		  | 
WP 3M
   		  | 
   		  | 
2006-10-05 | 
 | 
[ 89 ]
		 
	              | 
Element for WP 3M Chairman's Report - Status of differential attenuation task
		 
		  | 
WP 3M
   		  | 
   		  | 
2006-10-05 | 
 | 
[ 88 ]
		 
	              | 
Investigation of a new fixed-link planning method based on joint signal-level probability distributions
		 
		  | 
WP 3M
   		  | 
204/3
   		  | 
2006-10-05 | 
 | 
[ 87 ]
		 
	              | 
Annex for the WP 3M Chairman's Report - Further work for the combined rain and wet snow attenuation prediction method
		 
		  | 
WP 3M
   		  | 
204/3
   		  | 
2006-10-05 | 
 | 
 
		 [ 86 ]
		 
		 
	              | 
Working document towards a preliminary draft new Recommendation - Prediction methods required for the design of free space optical links
		 
		  | 
WP 3M
   		  | 
228/3
   		  | 
2006-10-05 | 
 | 
[ 85 ]
		 
	              | 
Annex to WP 3M Chairman's Report - Prediction of the multipath deep fading distribution tail
		 
		  | 
WP 3
   		  | 
   		  | 
2006-10-05 | 
 | 
[ 84 ]
		 
	              | 
Physical prediction model for differential rain attenuation distribution of converging terrestrial links
		 
		  | 
WP 3M
   		  | 
204/3
   		  | 
2006-10-05 | 
 | 
[ 83 ]
		 
	              | 
Proposed revision to Recommendation ITU-R P.530-11 - Propagation data and prediction methods required for the design of terrestrial line-of-sight systems
		 
		  | 
WP 3M
   		  | 
204/3
   		  | 
2006-10-05 | 
 | 
[ 82 ]
		 
	              | 
Liaison statement to WP 9A
		 
		  | 
WPs 3J, 3K and 3M
   		  | 
   		  | 
2006-10-05 | 
 | 
[ 81 ]
		 
	              | 
Liaison statement to WP 4-9S
		 
		  | 
WP 3J
   		  | 
   		  | 
2006-10-05 | 
 | 
[ 80 ]
		 
	              | 
Reply to the Liaison statement from WP 8B - Consideration of the statistical aspects of propagation predictions
		 
		  | 
WP 3M
   		  | 
   		  | 
2006-10-05 | 
 | 
[ 79 ]
		 
	              | 
Liaison statement to WP 8F on frequency related matters for the future development of IMT-2000 and IMT-Advanced related to WRC-07 Agenda item 1.4 - Sharing studies between IMT-Advanced systems and radars in the 2 700-2 900 MHz band and the 3 400-3 700 MHz band
		 
		  | 
WPs 3K and 3M
   		  | 
   		  | 
2006-10-05 | 
 | 
[ 78 ]
		 
	              | 
Liaison statement to WP 8B on long range tracking of AIS messages
		 
		  | 
WP 3M
   		  | 
   		  | 
2006-10-05 | 
 | 
[ 77 ]
		 
	              | 
Liaison statement to Working Party 9B - Fixed service application using frequency bands 
above 3 000 GHz
		 
		  | 
WP's 3J and 3M
   		  | 
   		  | 
2006-10-04 | 
 | 
[ 76 ]
		 
	              | 
Liaison statement to WP 4B - Application of Recommendation ITU-R P.1623 to the estimation of outage intensity performance for satellite digital paths
		 
		  | 
N/A
   		  | 
   		  | 
2006-10-04 | 
 | 
[ 75 ]
		 
	              | 
Future work on Recommendation ITU-R P.452-12
		 
		  | 
WP 3M
   		  | 
   		  | 
2006-10-03 | 
 | 
[ 74 ]
		 
	              | 
Summary of proposed revisions to ITU-R P.452
		 
		  | 
N/A
   		  | 
   		  | 
2006-10-03 | 
 | 
[ 73 ]
		 
	              | 
Liaison statement to Working Parties 1A, 1C, 4A, 4-9S, 6E, 7B, 8A, 8B, 8F, 9A and 9D - Spreadsheet implementation of the clear-air portion of Recommendation ITU-R P.452-12
		 
		  | 
N/A
   		  | 
   		  | 
2006-10-03 | 
Resultats:23 documents  
	         | 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):