Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 104 ]
|
Liaison statement to Working Party 7B - Studies pertaining to sharing between the space research service and HDFS systems in the fixed service
|
WP 9D
|
|
2003-04-25 |
|
[ 103 ]
|
Liaison to Working Party 7B - Sharing between non-GSO/GSO inter-satellite links and GSO/GSO inter-satellite links
|
WP 4A
|
|
2003-04-09 |
|
[ 102 ]
|
Report on the September/October 2002 meeting of Working Party 7B with a view to its next meeting (October 2003)
|
Chairman, WP 7B
|
|
2002-10-30 |
|
[ 101 ]
|
Final List of Participants - Working Party 7B
|
Director, BR
|
|
2002-10-03 |
|
[ 100 ]
|
List of documents issued
|
BRSGD
|
|
2002-09-27 |
|
[ 99 ]
|
Review of the Questions assigned to WP 7B
|
Vice-Chairman, SG 7
|
|
2002-09-25 |
|
[ 98 ]
|
Working document to review of the Recommendation ITU-R SA.363-5 - Space Operation Systems - Frequencies, bandwidths and protection criteria
|
Russian Federation
|
|
2002-09-26 |
|
[ 97 ]
|
Proposals for modification of the preliminary draft new Recommendation - Sharing between telecommand links in the space research and space operation services with the fixed and mobile services in frequency bands between 100 MHz and 1 GHz
|
Russian Federation
|
|
2002-09-24 |
|
[ 96 ]
|
Proposed revision to PDNRs SA.[SHAR15] and SA.[SHAR26]
|
Canada
|
|
2002-09-23 |
|
[ 95 ]
|
Preliminary draft new Recommendation on Technical and operational characteristics of interplanetary and deep-space systems operating in the space-to-Earth direction around 283 THz (1.06 um)
|
United States of America
|
235/7
|
2002-09-18 |
|
[ 94 ]
|
Proposed revision to preliminary draft new Recommendation ITU-R SA.[26SHAR]: Feasibility of sharing between the Space Research Service (Space-to-Earth) and the Inter-Satellite, Earth Exploration-Satellite, Fixed and Mobile Services in the band 25.5-27.0 GHz
|
United States of America
|
|
2002-09-18 |
|
[ 93 ]
|
Proposed revision to preliminary draft new Recommendation ITU-R SA.[15SHAR]: Feasibility of sharing between the Space Research Service (Space-to-Earth) and the Fixed and Mobile services in the band 14.8 - 15.35 GHz - (WRC-03 agenda item 1.12)
|
United States of America
|
|
2002-09-18 |
|
[ 92 ]
|
Proposed amendments to PDNR ITU-R SA.[15SHAR] - Feasibility of sharing between the Space Research Service (Space-to-Earth) and the Fixed and Mobile services in the band 14.8-15.35 GHz
|
United States of America
|
|
2002-09-18 |
|
[ 91 ]
|
Examination under No. 11.32 of frequency assignments relating to space research and earth exploration-satellite applications in a space-to-space network composed of a space station on a geostationary satellite and a space station on a non-geostationary satellite in the bands 13.4-14.3 GHz, 14.5-15.35 GHz, 22.55-23.55 GHz and 25.25-27.5 GHz
|
United States of America
|
|
2002-09-18 |
|
[ 90 ]
|
Sharing between Command Links in the Space Research and Space Operation Services with the Fixed, Mobile and Mobile-Satellite Services in Frequency band 257 - 262 MHz
|
United States of America
|
|
2002-09-18 |
|
[ 89 ]
|
Proposed preliminary draft new Recommendation on - Maximum allowable degradation to radiocommunication links of the space research and space operation services arising from interference from emissions and radiations from other sources
|
United States of America
|
|
2002-09-18 |
|
[ 88 ]
|
Use of out-of-band and spurious domains
|
WP 1A
|
|
2002-08-06 |
|
[ 87 ]
|
Liaison statement to Working Parties 7B, 7C, 7D and 7E - Request for information related to sharing between the broadcasting service and other co-primary services in the frequency bands 174-230 MHz and 470-862 Mhz
|
TG 6/8
|
|
2002-02-11 |
|
[ 86 ]
|
Reply to liaison statement from Working Party 7B - Methodology for interference assessment between HDFS and space research systems
|
WP 9D
|
|
2002-02-11 |
|
[ 85 ]
|
Liaison statement to WP 7E and 7B - Possible SRS allocation
|
WP 9D
|
|
2002-02-11 |
|
[ 84 ]
|
Reply to liaison statement from Working Party 7B and liaison statement to Working Party 7E - WRC-03 Agenda item 1.12, Resolution 723, resolves 1
|
WP 9D
|
|
2002-02-11 |
|
[ 83 ]
|
Liaison statement to WP 7E (copy to WP 7B for information) - WRC-03 Agenda item 1.12, Resolution 723, resolves 1
|
WP 8B
|
|
2002-02-11 |
|
[ 82 ]
|
Liaison from WP 4A
|
WP 4A
|
|
2002-02-11 |
|
[ 81 ]
|
Liaison to WPs 1A/6S, 7B, 7C, 8D, Satellite Backlog Action Group - Development of software requirements for automating the examination of space filings for compliance with Article 5
|
WP 4A
|
|
2002-02-11 |
|
[ 80 ]
|
Reply to liaison statement from WP 7B and liaison statement to WPs 7E, 9D - WRC-03 Agenda item 1.12 resolves 4, Resolution 723 (WRC-2000)
|
WP 6S
|
|
2002-02-11 |
|
[ 79 ]
|
Liaison statement to WPs 9D, 7B and 7D concerning Resolution 79 (WRC-2000)
|
Chairman, WP 3M
|
|
2002-02-11 |
|
[ 78 ]
|
Report on the February 2002 meeting of Working Party 7B with a view to its next meeting (September/October 2002)
|
Chairman, WP 7B
|
|
2002-02-11 |
|
[ 77 ]
|
List of documents issued
|
BRSGD
|
|
2002-02-11 |
|
[ 76 ]
|
Examination under No. S11.32 of frequency assignments relating an inter-satellite (space-to-space) network composed of a space station on a geostationary satellite and a space station on a non-geostationary satellite
|
Director, BR
|
|
2002-02-11 |
|
[ 75 ]
|
Proposed draft revised Recommendation ITU-R SA.1278 regarding addition of the space research service to the band 25.5-27.0 GHz
|
European Space Agency (ESA)
|
|
2002-02-11 |
|
[ 74 ]
|
Preliminary draft new Question - Need for frequency allocations above 275 GHz to the EESS (passive) and SRS (passive)
|
France
|
|
2002-02-11 |
|
[ 73 ]
|
Determination of coordination distance / exclusion zone between radio astronomy antenna and fixed service systems operating at 43 GHz - Resolution 79
|
France
|
|
2002-02-11 |
|
[ 72 ]
|
A sharing analysis between a single SRS system and FSS systems in the 37.5-38.0 GHz band
|
France
|
|
2002-02-11 |
|
[ 71 ]
|
Estimation of feasibility to allocate up to 3 MHz spectrum in the frequency band 235.0-328.6 MHz to implement telecommand uplinks in space research and space operation services
|
Russian Federation
|
|
2002-02-11 |
|
[ 70 ]
|
Sharing analysis between METS and FSS in the 37.5-38.0 Band (II)
|
Japan
|
|
2002-02-11 |
|
[ 69 ]
|
PDNR on sharing considerations and interim consultation process for high density fixed service sharing with the space research service (space-to-Earth) in the 31.8-32.3 and 37-38 GHz bands
|
United States of America
|
|
2002-02-11 |
|
[ 68 ]
|
Conditions for stations in the space research service (space-to-earth) to share with BSS feeder links in the 14.5-14.8 GHz band
|
United States of America
|
|
2002-02-11 |
|
[ 67 ]
|
Sharing between the mobile service (aeronautical mobile) and the space research service (space-to-Earth) in the frequency band 37-38 GHz
|
United States of America
|
|
2002-02-11 |
|
[ 66 ]
|
Working document towards draft CPM text on the 15 GHz element of Agenda item 1.12 (WRC-03) Resolution 723, resolves 4
|
United States of America
|
|
2002-02-11 |
|
[ 65 ]
|
Working document towards draft CPM text on the 26 GHz element of Agenda item 1.12 (WRC-2003) Resolution 723 resolves 4
|
United States of America
|
|
2002-02-11 |
|
[ 64 ]
|
Draft response to Document 7B/37 - Liaison from JTG 4-7-8
|
United States of America
|
|
2002-02-11 |
|
[ 63 ]
|
A preliminary draft CPM text addressing the feasibility of sharing between the space research service (space-to-Earth) and the fixed satellite service (space-to-Earth) in the band 37.5-38 GHz
|
Japan
|
|
2002-07-31 |
|
[ 62 ]
|
Review of Recommendations ITU-R SA. Series
|
Vice-Chairman, SG 7
|
|
2002-02-11 |
|
[ 61 ]
|
Liaison statement to WP 7B - Modifications to data relay satellite orbital locations
|
WP 9D
|
|
2002-02-11 |
|
[ 60 ]
(Rev.1) |
Liaison statement to Working Parties 4A, 6S, 7E, 7B, 8D, 9A, 9B and 9D - A draft new Recommendation and a draft new revision of Recommendations dealing with sharing bewtween the FS and FSS operating in the band 37.5 to 42.5 GHz
|
WP 4-9S
|
|
2002-02-11 |
|
[ 59 ]
|
Liaison statement to WPs 4A, 7B, 7D, 7E and 9D - Agenda item 1.11 of WRC-03
|
WP 8D
|
|
2002-02-11 |
|
[ 58 ]
|
Liaison to WPs 1C, 4A, 6S, 7B, 7C, 7D, 8B, 8D, 9B, 9C and 9D
|
TG 1/7
|
|
2002-02-11 |
|
[ 57 ]
|
Liaison statement to Working Parties 4A, 6E, 6S, 7A, 7B, 7C, 8A, 8B, 8D, 8F and 9B - Definitions of the spectral properties of transmitter emissions
|
WP 1A
|
|
2002-02-11 |
|
[ 56 ]
|
Liaison statement to WPs 3J, 4A, 4B, 6E, 6S, 7B, 7D, 8A, 8B and 9D - Compatibility between Ultra Wideband (UWB) emissions and Radiocommunication Services
|
WPs 1A and 1B
|
|
2002-02-11 |
|
[ 55 ]
|
Liaison statement from WP 9D - Resolution 79 (WRC-2000) on the coordination distance between radio astronomy and earth stations in bands above 30 GHz and P-MP high density applications in the fixed servce
|
WP 9D
|
|
2002-02-11 |
Results:104 total items. Result page:
1 -
2 -
3
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):