Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 196 ]
|
Summary record of the meeting of Radiocommunication Study Group 9
|
N/A
|
|
2003-05-08 |
|
[ 195 ]
|
Status of Questions assigned to SG 9
|
Radiocommunicatioin SG 9
|
|
2003-04-15 |
|
[ 194 ]
|
Final List of Participants - Study Group 9
|
Director, BR
|
|
2003-04-15 |
|
[ 193 ]
(Rev.1) |
Draft new Recommendation ITU-R F.[9B/Coordination-FWS] - Guidelines for a process to address the deployment of area-licensed fixed wireless systems operating in neighbouring countries
|
WP 9B
|
231/9
|
2003-04-15 |
|
[ 192 ]
|
List of documents issued
|
BRSGD
|
|
2003-04-14 |
|
[ 191 ]
|
Executive summary of the meeting of Working Party 9B - (Geneva, 7-14 April 2003)
|
Chairman, WP 9B
|
|
2003-04-14 |
|
[ 190 ]
|
Draft revision of Question ITU-R 119-1/9 - Limitation of unwanted emissions from fixed wireless systems in the fixed service
|
WP 9B
|
|
2003-04-14 |
|
[ 189 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.1401 - Considerations for the possible identification of frequency bands for fixed wireless access and related sharing studies
|
WP 9B
|
|
2003-04-14 |
|
[ 188 ]
|
Executive Report of the meeting of WP 9D
|
Chairman, WP 9D
|
|
2003-04-14 |
|
[ 187 ]
(Rev.1) |
Draft revision of Recommendation ITU-R F.384-7 - Radio-frequency channel arrangements for medium and high capacity digital fixed wireless systems operating in the upper 6 GHz band
|
WP 9B
|
|
2003-04-14 |
|
[ 186 ]
|
Status of Questions assigned to WP 9B
|
WP 9B
|
|
2003-04-14 |
|
[ 185 ]
|
Draft new Question ITU-R [9B/DOEP]/9 - Analysis and optimization of error performance of digital fixed wireless systems for the purpose of maintenance and operation
|
WP 9B
|
|
2003-04-14 |
|
[ 184 ]
|
Editorial update of Recommendation ITU-R F. 746 - Radio-frequency arrangements for fixed service systems
|
N/A
|
|
2003-04-14 |
|
[ 183 ]
|
Status of Questions assigned to Working Party 9D
|
N/A
|
|
2003-04-14 |
|
[ 182 ]
|
Executive Report on the meeting of Working Party 9A held in Geneva (7-11 April 2003)
|
N/A
|
|
2003-04-14 |
|
[ 181 ]
(Rev.1) |
Draft new Recommendation [Doc. 9/181] - Protection of fixed wireless systems from terrestrial digital video broadcasting systems in the VHF and UHF shared bands
|
N/A
|
|
2003-04-14 |
|
[ 180 ]
(Rev.1) |
Draft modification to Recommendation ITU-R F.699-5 - Reference radiation patterns for line-of-sight radio-relay system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
|
N/A
|
|
2003-04-14 |
|
[ 179 ]
|
Status of Questions assigned to Working Party 9A
|
WP 9A
|
|
2003-04-14 |
|
[ 178 ]
|
Draft new Question ITU-R[57 GHz] - Technical and operational characteristics of fixed wireless systems operating in frequency bands allocated to the fixed service above 57 GHz
|
WP 9B
|
|
2003-04-14 |
|
[ 177 ]
|
Draft revision of Question ITU-R 228/9 - Performance and availability objectives for the access part of the network formed wholly or partly by fixed wireless systems
|
WP 9A
|
228/9
|
2003-04-14 |
|
[ 176 ]
|
Draft revision of Question ITU-R 210-1/9 - Error performance objectives for fixed wireless sections
|
WP 9A
|
210/9
|
2003-04-14 |
|
[ 175 ]
|
Draft revision of Question ITU-R 161-3/9 - Performance limits for bringing into service and maintenance of digital fixed wireless systems
|
WP 9A
|
161/9
|
2003-04-14 |
|
[ 174 ]
|
Draft revision of Question ITU-R 122-3/9 - Effects of propagation on the design and operation of fixed wireless systems
|
WP 9A
|
122/9
|
2003-04-14 |
|
[ 173 ]
|
Draft revision of Question ITU-R 102-3/9 - Availability of digital fixed wireless systems
|
WP 9A
|
102/9
|
2003-04-14 |
|
[ 172 ]
(Rev.1) |
Draft new Recommendation ITU-R F. [Doc. 9/172] [9A/GSO-1] - Interference criteria of fixed wireless systems operating in the 37-40 GHz and 40.5-42.5 GHz bands with respect to satellites in the geostationary orbit
|
WP 9A
|
127/9
|
2003-04-14 |
|
[ 171 ]
|
Report of the meeting of ITU-R Study Group 9 (Geneva, 15 April 2003)
|
Chairman, SG 9
|
|
2003-04-14 |
|
[ 170 ]
(Rev.1) |
Error performance objectives for real digital fixed wireless links used in 27 500 km hypothetical reference paths and connects
|
WP 9A
|
210/9
|
2003-04-14 |
|
[ 169 ]
|
Procedure for adoption of draft Recommendations and Questions prepared by Joint Working Party 4-9S
|
Japan
|
|
2003-04-11 |
|
[ 168 ]
|
Editorial modification to Recommendation ITU-R F.1249-1 - Maximum equivalent isotropically radiated power of transmitting stations in the fixed service operating in the frequency band 25.25-27.5 GHz shared with the inter-satellite service
|
WP 9D
|
|
2003-04-11 |
|
[ 167 ]
|
Editorial modification to Recommendation ITU-R F.1247-1 - Technical and operational characteristics of systems in the fixed service to facilitate sharing with the space research, space operation and Earth exploration-satellite services operating in the bands 2 025-2 110 MHz and 2 200-2 290 MHz
|
WP 9D
|
|
2003-04-11 |
|
[ 166 ]
|
Editorial updating of Recommendation ITU-R F.1403 - Power flux-density criteria in ITU-R Recommendations for protection of systems in the Fixed Service in frequency bands shared with space stations of various space services
|
WP 9D
|
111/9, 113/9, 118/9, 201/9
|
2003-04-11 |
|
[ 165 ]
+Corr.1(Rev.1) |
Status of texts - ITU-R F-series Recommendations
|
RSG 9
|
|
2003-03-18 |
|
[ 164 ]
|
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan
|
ITU-T SG 15
|
|
2003-02-05 |
|
[ 163 ]
|
Summary record of the second plenary meeting of Radiocommunication Study Group 9
|
SG 9
|
|
2001-10-11 |
|
[ 162 ]
|
Summary record of the first plenary meeting of Radiocommunication Study Group 9
|
SG 9
|
|
2001-10-11 |
|
[ 161 ]
|
Summary record for the joint meeting of ITU-R Study Groups 4 and 9
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 160 ]
|
Executive Report on the third and final meeting of Joint Task Group 4-7-8-9 (30 April - 8 May 2002)
|
Chairman, JTG 4-7-8-9
|
|
2002-06-28 |
|
[ 159 ]
|
Liaison statement from TG 6/8 - Request of information related to sharing between the broadcasting service and fixed service in the frequency bands 174-230 MHz and 470-862 MHz
|
TG 6/8
|
|
2001-10-11 |
|
[ 158 ]
|
Summary of draft Recommendations
|
WP 4-9S
|
|
2001-10-11 |
|
[ 157 ]
|
Executive summary of the meeting of Working Party 4-9S
|
Chairman, WP 4-9S
|
|
2001-10-11 |
|
[ 155 ]
|
List of documents issued
|
BRSGD
|
|
2001-10-11 |
|
[ 154 ]
(Rev.1) |
Draft new Recommendation ITU-R SF.[DOC.4/95-9/154] The minimum distance from the coastline beyond which in-motion earth stations located on board vessels would not cause unacceptable interference to the fixed service
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 153 ]
|
Proposal for deletion of Recommendation ITU-R SF.615-1 and consequential editorial amendments to certain Recommendations in accordance with Resolution ITU-R 44
|
WP 4-9S
|
|
2001-10-11 |
|
[ 152 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SF.765 - Intersection of radio-relay beams with orbits used by space stations in the fixed-satellite service
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 151 ]
(Rev.1) |
Draft new Recommendation ITU-R SF.[4/92-9/151] Guidance for determination of interference from earth stations on vessels to stations in the fixed service when the ESV is within the minimum distance
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 150 ]
(Rev.1) |
Draft new Recommendation ITU-R SF.[DOC.4/91-9/150] Use of frequencies by earth stations on board vessels transmitting in certain bands allocated to the fixed-satellite service
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 149 ]
(Rev.1) |
Draft new Recommendation ITU-R SF.[DOC.4/90-9/149] Methodology for determining power flux-density statistics for use in sharing studies between the FS and FSS in a multi-satellite environment
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 148 ]
(Rev.1) |
Draft new Recommendation ITU-R SF.[4/89-9/148] - A methodology for interference evaluation from the downlink of the fixed service using high altitude platform stations to the uplink of the fixed-satellite service using ......
|
SGs 4 and 9
|
|
2001-10-11 |
|
[ 147 ]
|
Final list of participants
|
BRDMU
|
|
2001-10-11 |
|
[ 146 ]
|
Liaison statemtn to WP 6E - Recommended text for draft CPM Report on Agenda item 1.36
|
WP 9C
|
|
2001-10-11 |
Results:195 total items. Result page:
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):