Page 23 - U4SSC Verification Report, Mashhad, Iran, August 2021
P. 23
7. KPIs Not Reported
KPI Number Description
EC: I: T: 5A Travel Time Index
EC: I: T: 7A Shared Vehicles
EC: P: IN: 1C R&D Expenditure
EC: I: B: 1A Public Building Sustainability
EC: I: B: 2A Integrated Building Management Systems
EN: EN: EQ: 1C EMF Exposure
SC: EH: H: 6A Electronic Health Records
SC: SH: SI: 3C Poverty
SC: SH: SA: 5A Emergency Service Response Time
SC: SH: SA: 6C Police Service
SC: SH: SA: 8C Violent Crime Rate
8. KPIs Not Verified
All reported KPIs were verified.
9. Next Steps
Mashhad is encouraged to focus on KPIs that have been reported as falling within the benchmarks
of 0 – 33% and 33 – 66% of targets, determine which of these KPIs indicates critical issues for the
city and develop plans for improvement.
Mashhad is encouraged to review the KPIs for which no data were reported, and determine plans
for future data collection and reporting.
Mashhad is encouraged to continue ongoing data collection to determine trends in performance
against benchmarks over time.
Mashhad is encouraged to stay engaged within the U4SSC process and continue to provide
feedback on KPIs and benchmarks.
Verification Report | Mashhad, Iran | August 2021 15