Page 15 - U4SSC Verification Report, Mashhad, Iran, August 2021
P. 15
Dimension: Economy (continued)
CATEGORY KPI / Data Point Results Benchmark
Smart Electricity 3.72 %
Meters
Electricity Supply ICT 100.00 %
Monitoring
Demand Response 3.02 %
Penetration
Electricity System 0.80
Outage Frequency
ELECTRICITY SUPPLY Electricity System
Outage Time 70.87 Minutes
Access to 100.00 %
Electricity
Verification Report | Mashhad, Iran | August 2021 7