Page 15 - U4SSC Verification Report Canton of Geneva, Switzerland, October 2022
P. 15

Dimension: Economy (continued)

                   CATEGORY              KPI / Data Point           Results                Benchmark



                                      Drainage/Storm Water          90.00 %
                                      System ICT Monitoring

                   DRAINAGE

                                      Smart Electricity             2.13 %
                                      Meters

                                      Electricity Supply ICT        7.28 %
                                      Monitoring

                                      Demand Response               12.43 %
                                      Penetration

                                      Electricity System             0.25
                                      Outage Frequency
               ELECTRICITY SUPPLY
                                      Electricity System        10.10 Minutes
                                      Outage Time

                                      Access to Electricity        100.00 %













































                                                          Verification Report | Canton of Geneva, Switzerland | October 2022  7
   10   11   12   13   14   15   16   17   18   19   20