Page 52 - U4SSC Case study Daegu, Korea (Republic of), February 2022
P. 52

The city of Daegu plans to operate the Data Hub in 2022, develop algorithms for long-term and
            continuous solution to urban problems, and upgrade the Data hub by securing new data to utilize
            it as an urban operations platform.


            6.1.5  Daegu smart city operation model


            Daegu recognizes that in order to realize a data-driven smart sustainable city, the existing urban
            operation system must be converted into a smart sustainable city operations system. Accordingly,
            Daegu is reviewing smart sustainable city strategies, inhabitant-centred smart sustainable city
            operations, and systematic management and evaluation guidelines to make this happen. The
            intention is to convert the existing city operations model based on departments or tasks into an
            integrated city operation model suitable for a data-driven smart sustainable city. As a first step, SK
            Telecom’s smart city operations model was applied to Daegu.

            1.  City operation framework


            Daegu aims to implement a smarter and more sustainable city through the formulation of a smart
            sustainable city strategy based on an inhabitant-centred city operations, systematic management
            and evaluation through the conversion of the existing city operations model into a city operations
            framework. Globally, the standards and operational directions that smart sustainable cities have
            in common is their aim to attain SDG17 – Strengthen the means of implementation and revitalize
            the global partnership for sustainable development – which is expected comprehensively to lead
            to the happiness of inhabitants' lives in urban areas.

            2.  Data operation framework


            To enable data-driven city operations, Daegu will collect, store, manage and analyse all city
            data beyond the existing smart city service-oriented silo form, and share data with various city
            stakeholders such as inhabitants, local governments and private companies. Daegu aims to
            establish and operate a data management/operation framework that can be utilized for smart
            and more sustainable city operations.


























             34  U4SSC Case study | Daegu, Korea (Republic of) | February 2022
   47   48   49   50   51   52   53   54   55   56   57