Page 23 - U4SSC Verification Report, Daegu, Korea (Republic of), October 2021
P. 23

7.      KPIs Not Reported



                 KPI Number                                       Description
              EC: ICT: D: 1A       Drainage / Storm Water System ICT Monitoring
              EC: I: B: 2A         Integrated Building Management Systems
              EN: EN: PSN: 2A      Green Area Accessibility



            8.      KPIs Not Verified


            All reported KPIs were verified.




            9.      Next Steps


            Daegu is encouraged to focus on KPIs that have been reported as falling within the benchmarks
            of 0 – 33 % and 33 – 66 % of targets, determine which of these KPIs indicates critical issues for the
            city and develop plans for improvement.


            Daegu is encouraged to review the KPIs for which no data were reported and determine plans for
            future data collection and reporting.

            Daegu is encouraged to continue ongoing data collection to determine trends in performance
            against benchmarks over time.

            Daegu is encouraged to stay engaged within the U4SSC process and continue to provide feedback
            on KPIs and benchmarks.
































                                                             Verification Report | Daegu, Korea (Republic of) | October 2021  15
   18   19   20   21   22   23   24   25   26   27   28