Page 23 - U4SSC Verification Report, Daegu, Korea (Republic of), October 2021
P. 23
7. KPIs Not Reported
KPI Number Description
EC: ICT: D: 1A Drainage / Storm Water System ICT Monitoring
EC: I: B: 2A Integrated Building Management Systems
EN: EN: PSN: 2A Green Area Accessibility
8. KPIs Not Verified
All reported KPIs were verified.
9. Next Steps
Daegu is encouraged to focus on KPIs that have been reported as falling within the benchmarks
of 0 – 33 % and 33 – 66 % of targets, determine which of these KPIs indicates critical issues for the
city and develop plans for improvement.
Daegu is encouraged to review the KPIs for which no data were reported and determine plans for
future data collection and reporting.
Daegu is encouraged to continue ongoing data collection to determine trends in performance
against benchmarks over time.
Daegu is encouraged to stay engaged within the U4SSC process and continue to provide feedback
on KPIs and benchmarks.
Verification Report | Daegu, Korea (Republic of) | October 2021 15