Page 24 - U4SSC Verification Report, Rana, Norway, September 2020
P. 24
7. KPIs Not Reported
KPI Number Description
EC: I: ES: 1C Electricity System Outage Frequency
Partial - Following not reported:
Para Transport:
EC: I: T: 4A Rana is able to collect the number of people with access to a para transport card
(TT Card). Reported: 1.86 %.
The TT Card is usually used for discounted taxi fares as there is no dedicated para
transport system. However, access is not the same as usage.
EC: I: T: 5A Travel Time Index
EC: I: B: 1A Public Building Sustainability
Partial - Following not reported:
EN: EN: AQ: 1C Air Pollution - SO 2
Air Pollution - O 3
SC: SH: SA: 6C Police Service
SC: SH: FS: 1A Local Food Production
8. KPIs Not Verified
All reported KPIs were verified.
9. Next Steps
Rana is encouraged to focus on KPIs that have been reported as falling within the benchmarks of 0 – 33 %
and 33 – 66 % of targets, determine which of these KPIs indicates critical issues for the city and develop
plans for improvement.
Rana is encouraged to review the KPIs for which no data were reported, and determine plans for future
data collection and reporting.
Rana is encouraged to continue ongoing data collection to determine trends in performance against
benchmarks over time.
Rana is encouraged to stay engaged within the U4SSC process and continue to provide feedback on KPIs
and benchmarks.
16 Verification Report | Rana, Norway | September 2020