Page 21 - U4SSC Verification Report, Krimpen aan den IJssel, The Netherlands, June 2020
P. 21

7.      KPIs Not Reported

              KPI Number      Description
              EC: ICT: ES: 1C  Smart Electricity Meters
              EC: P: IN: 1C   R&D expenditure
              EC: P: IN: 3A   Small and Medium-Sized Enterprises
              EC: I: B: 1A    Public Building Sustainability
              EC: I: B: 2A    Integrated Building Management Systems
              EN: E: E: 4C    Public Building Energy Consumption
              SA: EH: C: 1C   Cultural Expenditure
              SC: EH: C: 2A   Cultural Infrastructure
              SC: SH: FS: 1A  Local Food Production



            8.      KPIs Not Verified


            None.




            9.      Next Steps


            Krimpen aan den IJssel is encouraged to focus on KPIs that have been reported as falling within the
            benchmarks of 0 – 33% and 33 – 66% of targets and determine which of these KPIs indicate critical
            issues for the city and develop plans for improvement.


            Krimpen aan den IJssel is encouraged to review the KPIs for which no data were reported and determine
            plans for future data collection and reporting.

            Krimpen aan den IJssel is encouraged to continue ongoing data collection to determine trends in
            performance against benchmarks over time.

            Krimpen aan den IJssel is encouraged to stay engaged within the U4SSC process and continue to provide
            feedback on KPIs and benchmarks.























                                                        Verification Report | Krimpen aan den IJssel, The Netherlands | June 2020  15
   16   17   18   19   20   21   22   23   24   25   26