Page 21 - U4SSC Verification Report, Krimpen aan den IJssel, The Netherlands, June 2020
P. 21
7. KPIs Not Reported
KPI Number Description
EC: ICT: ES: 1C Smart Electricity Meters
EC: P: IN: 1C R&D expenditure
EC: P: IN: 3A Small and Medium-Sized Enterprises
EC: I: B: 1A Public Building Sustainability
EC: I: B: 2A Integrated Building Management Systems
EN: E: E: 4C Public Building Energy Consumption
SA: EH: C: 1C Cultural Expenditure
SC: EH: C: 2A Cultural Infrastructure
SC: SH: FS: 1A Local Food Production
8. KPIs Not Verified
None.
9. Next Steps
Krimpen aan den IJssel is encouraged to focus on KPIs that have been reported as falling within the
benchmarks of 0 – 33% and 33 – 66% of targets and determine which of these KPIs indicate critical
issues for the city and develop plans for improvement.
Krimpen aan den IJssel is encouraged to review the KPIs for which no data were reported and determine
plans for future data collection and reporting.
Krimpen aan den IJssel is encouraged to continue ongoing data collection to determine trends in
performance against benchmarks over time.
Krimpen aan den IJssel is encouraged to stay engaged within the U4SSC process and continue to provide
feedback on KPIs and benchmarks.
Verification Report | Krimpen aan den IJssel, The Netherlands | June 2020 15