Page 15 - U4SSC Verification Report, Asker, Norway, September 2020
P. 15

Dimension: Economy (continued)
                     CATEGORY              KPI / Data Point          Results               Benchmark

                                        Smart Electricity            98.70 %
                                        Meters

                                        Electricity Supply ICT       100.00 %
                                        Monitoring
                                        Demand Response               0.11 %
                                        Penetration
                                        Electricity System             1.97
                                        Outage Frequency
                 ELECTRICITY SUPPLY     Electricity System
                                        Outage Time               49.84 Minutes

                                        Access to Electricity       100.00 %
























































                                                                     Verification Report | Asker, Norway | September 2020  7
   10   11   12   13   14   15   16   17   18   19   20