Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Resultats:102 documents
Résultats :  1 - 2 - 3 - 4 - 5  - Suivant Next
Contributions  [ Source: China Unicom ]   Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 1451 ]  
 
2015-06-09 China Unicom   Proposal to describe the XPolM effect in polarization multiplex system in G.697     Q6/15  
[ 1444 ]  
 
2015-06-09 China Unicom , Huawei Technologies Co., Ltd. , Telecom Italia S.p.A.   Open Issues with MDSP Network Objectives     Q9/15  
[ 1443 ]  
 
2015-06-09 China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co., Ltd. , Telecom Italia S.p.A.   Open Issues with MDSP Terminology     Q9/15  
[ 1417 ]  
 
2015-06-09 China Unicom , FiberHome Technologies Group   Proposals for the latest draft of G.mdsp     Q9/15  
[ 1375 ]  
 
2015-06-09 China Unicom   Performance requirements for passive node elements with ID tags     Q16/15  
[ 1370 ]  
 
2015-06-09 China Unicom   the Clarification of G.metro work     Q9/15  
[ 1368 ]  
 
2015-06-09 China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Requirement analysis of optical layer protection in metro WDM networks     Q9/15  
[ 1361 ]  
 
2015-06-09 China Unicom   Discussion on various scenarios for ODU SMP application     Q9/15  
[ 1359 ]  
 
2015-06-09 China Unicom   Network flattening application scenarios for future ODUSMP deployment     Q9/15  
[ 1358 ]  
 
2015-06-09 China Unicom   Consideration on vertical link of interconnected nodes in DNI of MDSP     Q9/15  
[ 1357 ]  
 
2015-06-09 China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd.   Proposal of standardization for cascaded and nested protection of multiple OTN domains     Q9/15, Q11/15  
[ 1333 ]  
 
2015-06-08 China Unicom   Suggestions for TOD interface     Q13/15  
[ 1332 ]  
 
2015-06-08 China Unicom   Test plan and test items for PRTC     Q13/15  
[ 1331 ]  
 
2015-06-08 China Unicom   Considerations for T-BC in G.8275.1     Q13/15  
[ 1323 ]  
 
2015-06-08 China Unicom , Huawei Technologies Co., Ltd.   Cascaded protection     Q9/15, Q11/15  
[ 1321 ]  
 
2015-06-08 ADVA Optical Networking , China Unicom , Deutsche Telekom AG , Telefon AB - LM Ericsson   Generation method for pilot tones for G.metro     Q6/15  
[ 1320 ]  
 
2015-06-08 China Unicom , Huawei Technologies Co., Ltd.   Handling unexpected messages in G.metro     Q6/15  
[ 1308 ]  
 
2015-06-08 Calnex Solutions Limited , China Unicom   Test plan and actual measurement data for PRTC time error tests     Q13/15  
[ 1267 ]  
 
2015-06-08 China Mobile Communications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT)   Proposal to define the commission performance of submarine cable system     Q8/15  
[ 1266 ]  
 
2015-06-08 China Unicom , ZTE Corporation   Proposals about the Super-Nyquist DWDM in G.sup39     Q6/15  
[ 1265 ]  
 
2015-06-08 China Unicom , Ministry of Industry and Information Technology (MIIT) (CATR) , ZTE Corporation   To add multi-dimensional modulation format in G.sup.39     Q6/15  
[ 1264 ]  
 
2015-06-08 China Unicom , Ministry of Industry and Information Technology (MIIT) (CATR) , ZTE Corporation   To add a note to OSNR in G.697     Q6/15  
[ 1223 ]  
 
2015-06-07 China Unicom , ZTE Corporation   Proposal to speed up the revision of G.698.2     Q6/15  
[ 1222 ]  
 
2015-06-07 China Unicom   Proposal to discuss application code considering the span distance and link loss in G.metro     Q6/15  
[ 1221 ]  
 
2015-06-07 ADVA Optical Networking , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , FiberHome Technologies Group , Telefon AB - LM Ericsson , ZTE Corporation   The consideration of communication channel of G.metro     Q6/15  
Resultats:102 documents
Résultats :  1 - 2 - 3 - 4 - 5  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2015-7-4