Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Resultats:45 documents
Résultats :  1 - 2  - Suivant Next
Contributions  [ Source: China Unicom ]   Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 764 ]  
 
2014-03-11 China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   G.vdsl: New 998ADE17 Band Plan for VDSL2     Q4/15  
[ 723 ]  
 
2014-03-11 China Unicom   Considerations on independence of each single protection switching in G.MDSP     Q9/15  
[ 719 ]  
 
2014-03-11 China Unicom , Ministry of Industry and Information Technology (MIIT)   Proposal to update the definition of terms for submarine cable system in G.972     Q8/15  
[ 718 ]  
 
2014-03-11 China Unicom , Ministry of Industry and Information Technology (MIIT)   Proposal to update G.977 considering ROADM and 100G application     Q8/15  
[ 717 ]  
 
2014-03-11 China Unicom , Ministry of Industry and Information Technology (MIIT)   Proposal to update G.973.1 considering 100G application     Q8/15  
[ 716 ]  
 
2014-03-11 China Unicom , ZTE Corporation   Proposal to add XPolM effect in G.697     Q6/15  
[ 715 ]  
 
2014-03-11 China Unicom   MFD distribution of G.652 fibre in China Unicom     Q5/15  
[ 712 ]  
 
2014-03-11 China Unicom , ZTE Corporation   Experimental results of EVM related parameters of QPSK transmitter     Q6/15  
[ 710 ]  
 
2014-03-11 China Unicom , ZTE Corporation   Considerations about Addition of the Generic DSP Demodulation Flow in G.sup39     Q6/15  
[ 708 ]  
 
2014-03-11 China Unicom , FiberHome Technologies Group   Proposal of starting a new work item or modify the existing recommendations on optical layer protection     Q9/15  
[ 688 ]  
 
2014-03-11 China Unicom , Ericsson Canada, Inc.   Optical layer protection requirement of Metro DWDM system     Q9/15  
[ 687 ]  
 
2014-03-11 Calnex Solutions Limited , China Unicom , Huawei Technologies Co. Ltd.   Consideration for 1588 over OTN by ESC     Q13/15, Q11/15  
[ 686 ]  
 
2014-03-11 Calnex Solutions Limited , China Unicom   Suggestions for time interface connection between OTN and Package Switching / Transport Network     Q13/15, Q11/15  
[ 685 ]  
 
2014-03-11 Calnex Solutions Limited , China Unicom , Huawei Technologies Co. Ltd.   Test and analysis about PTP over OTN by transparent mode     Q13/15, Q11/15  
[ 680 ]  
 
2014-03-11 Ministry of Industry and Information Technology (MIIT) , China Telecommunications Corporation , China Unicom   Considerations for PTP over OTN network     Q13/15  
[ 628 ]  
 
2014-03-10 China , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Proposal for studying intelligent node elements in optical fibre networks     Q16/15  
[ 604 ]  
 
2014-03-10 China Unicom   Considerations on control plane derived from G.8080 for G.ODUSMP     Q9/15  
[ 603 ]  
 
2014-03-10 China Unicom   Proposal on fundamental visor and virtualization in soft-defined transport network     Q14/15, Q12/15  
[ 584 ]  
 
2014-03-10 China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Proposal about SMSR parameter for advanced modulation formats in ITU-T G.698.2     Q6/15  
[ 581 ]  
 
2014-03-10 China Unicom , ZTE Corporation   Considerations about the EVM     Q6/15  
[ 541 ]  
 
2014-03-09 China Unicom , Huawei Technologies Co. Ltd.   Performance analysis of OTUC4 and OTLC4.16 frame alignment     Q11/15  
[ 529 ]  
 
2014-03-09 China Unicom , ZTE Corporation   Proposal of Multi-failure processing for ODUsmp     Q9/15  
[ 466 ]  
 
2014-03-07 China Unicom , Huawei Technologies Co. Ltd.   Considerations on DS/US adjustment for the VDSL2     Q4/15  
[ 399 ]  
 
2013-06-18 China Unicom , FiberHome Technologies Group   The requirement of optical overhead extend at IrDI     Q11/15  
[ 365 ]  
 
2013-06-18 China Unicom , FiberHome Technologies Group   Propose to add 1dB and 3dB passband width parameters in G.680     Q6/15  
Resultats:45 documents
Résultats :  1 - 2  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

 

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2014-9-16