Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Resultats:222 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5  - Suivant Next
Contributions  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 529 ]  
 
Proposal of Multi-failure processing for ODUsmp     China Unicom , ZTE Corporation   Q9/15   2014-03-09
[ 528 ]  
 
Proposal of APS signalling transmitting pattern for ODUsmp     ZTE Corporation   Q9/15   2014-03-09
[ 499 ]  
 
ODU SMP Lower Order 1-stage signalling     Alcatel-Lucent USA Inc.   Q9/15   2014-03-07
[ 497 ]  
 
ODU SMP Proposal Status     Alcatel-Lucent USA Inc.   Q9/15   2014-03-07
[ 457 ]  
(Rev.1) 
Proposal to finalize work on a revision to Recommendation G.8131     Korea (Rep. of)   Q9/15   2014-03-05
[ 441 ]  
(Rev.1-3) 
Proposed draft text for G.8131     Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co. Ltd.   Q9/15   2014-02-17
[ 430 ]  
 
Proposed text for draft G.MDSP based on existing OTN material     Alcatel-Lucent Deutschland AG   Q9/15   2013-06-18
[ 429 ]  
 
Considerations regarding G.MDSP     Alcatel-Lucent Italia S.p.A.   Q9/15   2013-06-18
[ 427 ]  
 
Comments on circulated draft version of G.808.2     Alcatel-Lucent Deutschland AG   Q9/15   2013-06-18
[ 426 ]  
 
Proposed enhancement of G.873.2     Alcatel-Lucent Deutschland AG   Q9/15   2013-06-18
[ 422 ]  
(Rev.1) 
MAC DA setting for Ethernet OAM frames     Alcatel-Lucent Italia S.p.A.   Q9/15, Q10/15   2013-06-18
[ 418 ]  
 
Discussion and proposal on progress in MPLS-TP linear protection     Nippon Telegraph and Telephone Corporation (NTT)   Q9/15   2013-06-18
[ 417 ]  
 
Proposed text for G.mdsp     Alcatel-Lucent Italia S.p.A. , Telecom Italia S.p.A.   Q9/15   2013-06-18
[ 395 ]  
 
Support for Ethernet linear protection solutions applicable to DNI scenarios     Telecom Italia S.p.A.   Q9/15   2013-06-18
[ 394 ]  
 
Selection of protection transport entities in m1 SMP architecture     FiberHome Technologies Group   Q9/15   2013-06-18
[ 393 ]  
 
Editorial suggestions for G.8131.1     FiberHome Technologies Group   Q9/15   2013-06-18
[ 392 ]  
 
G.mdsp proposed new network objectives     Telecom Italia S.p.A.   Q9/15   2013-06-18
[ 390 ]  
 
Definition for Broadcast Bridge in G.8131.1     FiberHome Technologies Group   Q9/15   2013-06-18
[ 388 ]  
(Rev.1) 
Forwarding behaviour for OAM frames at MIPs in G.8021     Alcatel-Lucent USA Inc.   Q9/15   2013-06-18
[ 387 ]  
 
Validating assumptions made in the context of MECP     Alcatel-Lucent USA Inc.   Q9/15   2013-06-18
[ 383 ]  
 
Proposal to cross-connection release signal of 2-stage ODU SMP protocol     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 370 ]  
 
Utilizing G.8031 APS protocol for per-leaf protection in MECP     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 369 ]  
 
Propose to modify network objectives for G.mdsp     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 356 ]  
 
Modification of pre-emption principles in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 354 ]  
 
some editorial suggestions for G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 353 ]  
 
proposal text about network objective of configuration inconsistance in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 351 ]  
 
priority consideration for preemption in G.808.3     FiberHome Technologies Group   Q9/15   2013-06-18
[ 350 ]  
 
Considerations in 2-stage ODU SMP protocol     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 347 ]  
 
MECP per-tree protection - simultaneous condition     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 346 ]  
 
MECP per-tree protection - operator's command initiated protection     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2013-06-18
[ 342 ]  
 
Proposal for generic state machine description in G.808.1     Hitachi, Ltd. , NEC   Q9/15   2013-06-18
[ 288 ]  
(Rev.1) 
Proposed correction of MAC DA specification in G.8013     NEC Corporation   Q9/15, Q10/15   2013-06-17
[ 287 ]  
(Rev.1) 
Comments on the scope and some definitions of G.808.2     NEC Corporation   Q9/15   2013-06-17
[ 271 ]  
 
ODU SMP Signalling Options     Alcatel-Lucent USA Inc.   Q9/15   2013-06-17
[ 269 ]  
 
Availability/Outage times for ODUSMP     Alcatel-Lucent USA Inc.   Q9/15   2013-06-17
[ 257 ]  
 
Proposed text for removed G.8032 appendices (for agreement)     Nippon Telegraph and Telephone Corporation (NTT)   Q9/15   2013-06-17
[ 236 ]  
 
Proposed text in G.MDSP     China Unicom , Huawei Technologies Co. Ltd.   Q9/15   2013-06-17
[ 235 ]  
 
APS Behavior in 1-stage ODU SMP Proposal     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-17
[ 234 ]  
 
Discussion about Single Failure and its Potential Affect in ODU SMP     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-17
[ 229 ]  
 
Analysis of Supporting External Commands in ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2013-06-17
[ 223 ]  
 
Answers to B100G questions from Q11/15 rapporteur (TD22/GEN)     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q9/15, Q6/15, Q14/15, Q12/15, Q11/15   2013-06-17
[ 213 ]  
 
Status update for ODU SMP     ZTE Corporation   Q9/15   2013-06-17
[ 208 ]  
 
Consideration on optical layer protection     China Unicom , Fiberhome , Nokia Siemens Networks   Q9/15   2013-06-17
[ 205 ]  
 
Architecture and APS communication for per-leaf protection in MECP     Korea (Rep. of)   Q9/15   2013-06-17
[ 202 ]  
 
MECP per-tree protection - root node initiated protection     Korea (Rep. of)   Q9/15   2013-06-17
[ 190 ]  
(Rev.1) 
Proposed text on multiple failure for G.mdsp     Ministry of Industry and Information Technology (MIIT)   Q9/15   2013-06-17
[ 156 ]  
 
Proposed MPLS-TP Linear protection models for Appendix in G.8121     Fujitsu Limited   Q9/15, Q10/15   2013-06-17
[ 155 ]  
 
Comments on draft G.808.2     Fujitsu Limited   Q9/15   2013-06-17
[ 154 ]  
 
Consideration on the notification of availability for ODU SMP     Fujitsu Limited   Q9/15   2013-06-17
[ 145 ]  
 
ODU SMP Activation Time     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-16
Resultats:222 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-5-4