Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Resultats:31 documents
Contributions  [ Source: Futurewei Technologies US R ]  [ AI/Question: Q2/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 2065 ]  
 
Proposed future ONU management reference model in G.988     Futurewei Technologies US R&D Center   Q2/15   2016-09-06
[ 2025 ]  
 
Contributed text for a recommendation on Reach Extenders for XGS-PON     Futurewei Technologies US R&D Center , Orange   Q2/15   2016-09-05
[ 1944 ]  
 
Technology review on transmitting 25 Gb/s over a single wavelength channel     Futurewei Technologies US R&D Center   Q2/15   2016-09-02
[ 1941 ]  
 
Proposal of a new PLOAM to reboot ONU in G.9807.1     Futurewei Technologies US R&D Center   Q2/15   2016-09-02
[ 1940 ]  
 
Proposal of a new supplement on 25 Gb/s transmission per wavelength     Broadcom Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , ZTE Corporation   Q2/15   2016-09-02
[ 1939 ]  
 
Channel Bonding Discussion in IEEE P802.3ca     Futurewei Technologies US R&D Center   Q2/15   2016-09-02
[ 1729 ]  
 
Dual-rate support in XGS-PON     British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , Orange , ZTE Corporation   Q2/15   2016-02-02
[ 1723 ]  
 
G.RoF system architecture     Futurewei Technologies US R&D Center   Q2/15   2016-02-01
[ 1721 ]  
 
Proposal for 10G burst profile in G.XGS-PON     Broadcom Corporation , Futurewei Technologies US R&D Center   Q2/15   2016-02-01
[ 1244 ]  
 
Comments to G.989.3 Draft 20150601     Futurewei Technologies US R&D Center   Q2/15   2015-06-08
[ 1133 ]  
 
Clause 17.1: Announcement     Futurewei Technologies US R&D Center , Verizon Communication Corporation , ZTE Corporation   Q2/15   2014-11-11
[ 995 ]  
 
Proposal of G.989.2 Annex C, Wavelength-Routed PtP WDM PMD     Futurewei Technologies US R&D Center   Q2/15   2014-11-10
[ 993 ]  
 
Proposal of G.989.2 Annex A PtP WDM PMD table parameter update with FEC enabled     Futurewei Technologies US R&D Center   Q2/15   2014-11-10
[ 985 ]  
 
Power saving with channel selection     Futurewei Technologies US R&D Center   Q2/15   2014-11-10
[ 982 ]  
 
Proposal of G.989.3 Annex H - PtP WDM Transmission Convergence Layer     Futurewei Technologies US R&D Center   Q2/15   2014-11-10
[ 979 ]  
 
Proposal of G.989.3 Annex on "Transcoded Framing with FEC and OAM for PtP WDM TC"     Futurewei Technologies US R&D Center   Q2/15   2014-11-10
[ 962 ]  
 
A possible next stage of TWDM PON: 100G-PON     Futurewei Technologies US R&D Center   Q2/15   2014-11-10
[ 891 ]  
 
Responses to the comments of Toshiaki Kuri on the Futurewei proposal entitled "Aggregated Analog Radio over Fiber (AA-ROF)"     Futurewei Technologies US R&D Center   Q2/15   2014-11-10
[ 890 ]  
 
Responses to the comments of Toshiaki Kuri on the Futurewei proposal entitled "Aggregated Analog Radio over Fiber (AA-ROF)"  
No file provided
 
Futurewei Technologies US R&D Center   Q2/15   2014-11-10
[ 889 ]  
 
Aggregated Analog Radio over Fiber (AA-ROF)     Futurewei Technologies US R&D Center   Q2/15   2014-11-10
[ 709 ]  
 
Comments on Clause 13 of G.989.3     China Telecommunications Corporation , Futurewei Technologies US R&D Center , Verizon Communication Corporation , ZTE Corporation   Q2/15   2014-03-11
[ 602 ]  
 
Reusing PON-ID as TWDM channel ID     Futurewei Technologies US R&D Center   Q2/15   2014-03-10
[ 600 ]  
 
Comments to Feb 2014 Q2 interim document "D33_G.989.3-Tuning-States-20140218-VZ-ZTE-HIT-MIT-OKI-NTT_r2"     Futurewei Technologies US R&D Center   Q2/15   2014-03-10
[ 131 ]  
 
Full capacity in NG-PON2 using line coding     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 130 ]  
 
Proposal to study AWG based WDM PON proposal in mobile front-haul application     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 129 ]  
 
On the editorial placement of NG-PON2 (TWDM) TC-layer specifications     Alcatel-Lucent USA Inc. , Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 128 ]  
 
On the concept of out-of-band ranging in TWDM PONs     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 127 ]  
 
Impacts of line code change on G.989.2     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 117 ]  
 
G.poc draft proposal     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 116 ]  
 
Proposal to replace NG-PON2 channel plan in Appendix VII of G.989.2 draft     ADVA Optical Networking , Futurewei Technologies US R&D Center , Gemfire Europe Limited   Q2/15   2013-06-15
[ 115 ]  
 
Multiple rate TC extension for TWDM     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
Resultats:31 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-5-1