Contributions
[ AI/Question: Q13/15 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 988 ]
|
Time_event_message_ToD_Protocol_modification
|
Orange
|
Q13/15
|
2014-11-10 |
|
[ 987 ]
|
G8266_T-GM_Interfaces
|
Orange
|
Q13/15
|
2014-11-10 |
|
[ 986 ]
|
SyncE over LAG-text modification
|
Orange
|
Q13/15
|
2014-11-10 |
|
[ 973 ]
|
Requirements for PTP option for T-TC timing characteristics.
|
NEC Corporation
,
Orange
|
Q13/15
|
2014-11-10 |
|
[ 958 ]
|
Variable temperature test of G.8273
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-11-10 |
|
[ 957 ]
|
T-BC High-Frequency Noise (Jitter) Generation Results Based on Multiple Replications of Simulations
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-11-10 |
|
[ 956 ]
|
SyncE transient test of G.8273
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-11-10 |
|
[ 955 ]
|
Proposal of Cs-GNSS Ensembler clock
|
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-11-10 |
|
[ 954 ]
|
Proposal for G.8273.2
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-11-10 |
|
[ 953 ]
|
Noise transfer test of G.8273.2
|
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-11-10 |
|
[ 952 ]
|
Measurement accuracy of PRTC
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-11-10 |
|
[ 951 ]
|
High-Level Time Synchronization Functional Model based on Media-Independent and Media-Dependent Layers
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-11-10 |
|
[ 927 ]
|
Proposal on Sync Management and OAM
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q14/15, Q13/15, Q10/15
|
2014-11-10 |
|
[ 926 ]
|
Proposal for OTN synchronization
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-11-10 |
|
[ 925 ]
|
Experiments and analysis on automatic asymmetry compensation
|
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q13/15
|
2014-11-10 |
|
[ 924 ]
|
Fronthual synchronization requirements
|
China Mobile Communications Corporation
|
Q13/15
|
2014-11-10 |
|
[ 923 ]
|
Proposal on defining the sync layer functions of OTN and extending G.781
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2014-11-10 |
|
[ 919 ]
|
Clock Management and Information Model
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q14/15, Q13/15
|
2014-11-10 |
|
[ 918 ]
|
Intelligent Clock Use Case and Requirements
|
China Mobile Communications Corporation
|
Q14/15, Q13/15, Q12/15
|
2014-11-10 |
|
[ 880 ]
|
Amendment 2 to Recommendation ITU-T G.8271.1/Y. 1366.1: clarifications
|
Telefon AB - LM Ericsson
|
Q13/15
|
2014-11-09 |
|
[ 879 ]
|
BMCA in G.8275.2
|
Telefon AB - LM Ericsson
|
Q13/15
|
2014-11-09 |
|
[ 878 ]
|
High frequency noise measurement interval in G.8271.1 and G.8273.2
|
Telefon AB - LM Ericsson
|
Q13/15
|
2014-11-09 |
|
[ 877 ]
|
PTP over LAG and potential impacts on G.8275.1
|
Telefon AB - LM Ericsson
|
Q13/15
|
2014-11-09 |
|
[ 876 ]
|
EECv2 specification and synchronization over OTN
|
Deutsche Telekom AG Standardization
|
Q13/15
|
2014-11-09 |
|
[ 875 ]
|
Use cases for EECv2 specification
|
Deutsche Telekom AG Standardization
|
Q13/15
|
2014-11-09 |
|
[ 874 ]
|
PRTC ensemble type 1 (GNSS+Cs) performance specification
|
Deutsche Telekom AG Standardization
|
Q13/15
|
2014-11-09 |
|
[ 873 ]
|
PRTC ensemble function types to be specified
|
A1 Telekom Austria AG
,
Deutsche Telekom AG Standardization
,
Orange
|
Q13/15
|
2014-11-09 |
|
[ 872 ]
|
Synchronization Network Migration and need for PRTC ensemble functions
|
Deutsche Telekom AG Standardization
|
Q13/15
|
2014-11-09 |
|
[ 832 ]
|
Method to correct PDV for time synchronization using reference packet
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q13/15
|
2014-11-07 |
|
[ 831 ]
(Rev.1) |
Architecture for timing protection and correcting link asymmetry
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q13/15
|
2014-11-07 |
|
[ 817 ]
|
Formats of Frame-Mapped GFP PTP Messages for PTP-over-OTN-Overhead
|
PMC-Sierra, Inc.
|
Q13/15, Q11/15
|
2014-11-06 |
|
[ 813 ]
(Rev.1) |
Test of frequency delivery over aerial-optical-cable-based network
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
|
Q13/15
|
2014-11-05 |
|
[ 771 ]
|
Document describing migration from other PTP profiles to G.8275.1
|
Nokia Solutions and Networks Gmbh & Co. KG
|
Q13/15
|
2014-03-11 |
|
[ 770 ]
|
Updates to G.8263 Testing
|
Nokia Solutions and Networks Gmbh & Co. KG
|
Q13/15
|
2014-03-11 |
|
[ 759 ]
|
Access budget within E2E Time/phase HRM
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q13/15
|
2014-03-11 |
|
[ 747 ]
|
Information on Upcoming New Work on B100G OTN
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 737 ]
|
Synchronization over OTN: application scenarios and standardization requirements for different OTN interface structures
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 736 ]
|
Frequency and time synchronization over OTN: requirements, implementation, deployments and test performance
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 735 ]
|
Proposal on Synchronization OAM in packet networks
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q10/15
|
2014-03-11 |
|
[ 734 ]
|
Proposal for clockClass definition
|
China
|
Q13/15
|
2014-03-11 |
|
[ 731 ]
|
Update of the table listing the ITU-T Recommendations suitable for conformity/interoperability testing
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 730 ]
|
C&I pilot project for Synchronous Ethernet technology
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 729 ]
|
Clarification of PTP unicast communication for G.8275.2 and G.8265.1 - request for unicast transmission of multiple types of PTP messages using Signaling messages
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 728 ]
|
Guidance on the usage of the methods for PDV tolerance testing in G.8263
|
Iometrix, Inc.
,
Orange
|
Q13/15
|
2014-03-11 |
|
[ 727 ]
|
PTP GM performance specification in ITU-T
|
Iometrix, Inc.
,
Orange
|
Q13/15
|
2014-03-11 |
|
[ 726 ]
|
Notion of Quality Level of local clock in G.8265.1 during master selection
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 725 ]
|
Review of G.8275.1 Latest Draft
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 724 ]
|
Use of G.8265.1 telecom profile for Assisted Partial Timing Support
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 722 ]
|
Clarification of PTP unicast communication for G.8275.1, G.8275.2 and G.8265.1 - modification of frequencyTraceable flag, timeTraceable flag, and clockClass
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
|
[ 721 ]
|
Comments on methods 1 and 2 for PDV tolerance testing in G.8263
|
Iometrix, Inc.
|
Q13/15
|
2014-03-11 |
Resultats:474 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):