Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Resultats:474 documents
Résultats :  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Suivant Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 2204 ]  
 
T-TSC-X Tolerance & Harmonized PTS/APTS limits     Microsemi Corporation   Q13/15   2016-09-06
[ 2197 ]  
(Rev.1) 
State of Current Technology for Temperature Compensated X'tal Oscillators (TCXO)     Epson Electronics America   Q13/15   2016-09-06
[ 2187 ]  
 
G.8273.2: Limits to use when cascading Boundary Clocks     Calnex Solutions Limited   Q13/15   2016-09-06
[ 2186 ]  
 
xPON Access HRMs and Performance for LTE and CA Applications     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15, Q13/15   2016-09-06
[ 2185 ]  
 
GPON Time Error Transfer performance for a loaded Access System     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2016-09-06
[ 2184 ]  
 
GPON Time Error increase when adding more ONUs     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2016-09-06
[ 2181 ]  
 
Practical Access Model of T-BC from Protocol View Update [G.8271, G.8273.2]     Microsemi Corporation   Q13/15   2016-09-06
[ 2180 ]  
 
Practical Access Model of T-BC from Performance View Update [G.8271, G.8273.2]     Microsemi Corporation   Q13/15   2016-09-06
[ 2178 ]  
 
Generic Virtual PTP Port Updates [G.8275]     Microsemi Corporation   Q13/15   2016-09-06
[ 2177 ]  
 
Cross-Profile Generic IWF Updates [G.8275]     Microsemi Corporation   Q13/15   2016-09-06
[ 2176 ]  
 
Updates to Appendix III Monitoring Figures [G.8275.2]     Microsemi Corporation   Q13/15   2016-09-06
[ 2175 ]  
 
Use of G.8275.2 with Full On-Path Networks [G.8275.2]     Microsemi Corporation   Q13/15   2016-09-06
[ 2173 ]  
 
Copy G.8275.1 Appendix V to G.8275.2 [G.8275.2]     Microsemi Corporation   Q13/15   2016-09-06
[ 2171 ]  
 
Monitoring PTP connections with alternateMasterFlag [G.8275.1]     Microsemi Corporation   Q13/15   2016-09-06
[ 2169 ]  
 
Update to Appendix V tables for Synchronization Uncertain [G.8275.1]     Microsemi Corporation   Q13/15   2016-09-06
[ 2168 ]  
 
G.8266: Noise Transfer     Calnex Solutions Limited   Q13/15   2016-09-06
[ 2167 ]  
 
G.8262: Correction to Long-Term Phase Transient     Calnex Solutions Limited   Q13/15   2016-09-06
[ 2166 ]  
(Rev.1) 
Typo fix seconds/bit [G.8271]     Microsemi Corporation   Q13/15   2016-09-06
[ 2163 ]  
(Rev.1) 
G.8272.1 Holdover     ADVA Optical Networking , Microsemi Corp   Q13/15   2016-09-06
[ 2161 ]  
 
G.8271.2 Burst limit     Nokia Solutions and Networks GmbH & Co. KG   Q13/15   2016-09-06
[ 2123 ]  
 
Proposal to add more details on ToD (GNSS Status Message Payload) interface definition     Orange   Q13/15   2016-09-06
[ 2122 ]  
 
Informational contribution on ionospheric effects during PRTC measurement     Orange   Q13/15   2016-09-06
[ 2121 ]  
 
High Performance atomic clock stability from the perspective of ePRTC.     Orange   Q13/15   2016-09-06
[ 2120 ]  
 
T-BC requirements for the case where syncE input is lost.     Orange   Q13/15   2016-09-06
[ 2119 ]  
 
3GPP recent work on network assisted synchronization (NAS) for cellular networks.     Orange   Q13/15   2016-09-06
[ 2118 ]  
 
Additional table for phase/time requirements for cluster-based synchronization (G.8271).     ADVA Optical Networking , Orange   Q13/15   2016-09-06
[ 2117 ]  
 
Interoperability between EEC and eEEC (G.8262.1 and G.8262 clocks).     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-09-06
[ 2116 ]  
 
HRMs for cluster-based synchronization (G.8271.1).     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-09-06
[ 2115 ]  
 
Use case for G.8271.2     Orange   Q13/15   2016-09-06
[ 2114 ]  
 
Preliminary fronthaul requirements for 5G.     Orange   Q13/15   2016-09-06
[ 2110 ]  
(Rev.1) 
Transport synchronization message in FlexO interface     ZTE Corporation   Q13/15, Q11/15   2016-09-06
[ 2104 ]  
 
Consideration on holdover state for T-BC     NEC Corporation   Q13/15   2016-09-06
[ 2103 ]  
 
G.8272.1 edits     Microsemi Corporation   Q13/15   2016-09-06
[ 2102 ]  
 
G.8272.1 Appendix D     Microsemi Corporation   Q13/15   2016-09-06
[ 2101 ]  
 
G.8272.1 autonomous primary reference clock performance requirements     Microsemi Corporation   Q13/15   2016-09-06
[ 2099 ]  
(Rev.1) 
Analysis of the synchronization requirements of 5G and suggestion on new network reference model     China Mobile Communications Corporation   Q13/15   2016-09-06
[ 2090 ]  
 
Attributes for SyncE extended SSM     ZTE Corporation   Q14/15, Q13/15   2016-09-06
[ 2088 ]  
(Rev.1) 
Synchronization OAM     ZTE Corporation   Q14/15, Q13/15   2016-09-06
[ 2081 ]  
 
APTS network limit of G.8271.2 and noise generation of G.8273.4     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-09-06
[ 2079 ]  
 
Proposals for G.8266 clock with GNSS receiver and G.8272.1 scope     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-09-06
[ 2077 ]  
 
SyncE clock ID of G.8264     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-09-06
[ 2075 ]  
 
Sub-Nyquist Artefacts and Sampling Moiré Effects when Measuring PTP to PTP and PTP to 1 PPS Noise Transfer (G.8272.3, G.supp)     Huawei Technologies Co., Ltd.   Q13/15   2016-09-06
[ 2074 ]  
 
Proposed notes for 7.3.1/G.8273.2 (PTP to PTP noise transfer) and C.2.3.1/G.8273.2 (PTP to 1PPS noise transfer)     Huawei Technologies Co., Ltd.   Q13/15   2016-09-06
[ 2073 ]  
 
Miscellaneous Proposals for Revised Recommendation G.781     Huawei Technologies Co., Ltd.   Q13/15   2016-09-06
[ 2072 ]  
 
Initial Simulation Results for Wander Accumulation in a Chain of eEECs (G.8262.1, G.supp)     Huawei Technologies Co., Ltd.   Q13/15   2016-09-06
[ 2071 ]  
 
G.8275.2 - Deny service     Huawei Technologies Co., Ltd.   Q13/15   2016-09-06
[ 2070 ]  
(Rev.1) 
Same path of SyncE frequency and PTP time     Huawei Technologies Co., Ltd.   Q13/15   2016-09-06
[ 2068 ]  
 
Short-term phase transient and phase discontinuity of G.8266     Huawei Technologies Co., Ltd.   Q13/15   2016-09-06
[ 2067 ]  
 
Wide-Band Jitter Accumulation Simulation Results for Transport of Higher-Rate Ethernet Clients over B100G OTN based on Multiple Replications     Huawei Technologies Co., Ltd.   Q13/15   2016-09-06
[ 2054 ]  
 
Proposal on new specifications of PRTC in G.8272     China Unicom   Q13/15   2016-09-05
Resultats:474 documents
Résultats :  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-3-19