Contributions
[ AI/Question: Q10/15 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 343 ]
|
Proposal for developing a new draft for EP-Tree
|
Hitachi, Ltd.
|
Q10/15
|
2013-06-18 |
|
[ 300 ]
|
Proposal to add an appendix for MPLS-TP packet data throughput to G.8112
|
Electronics and Telecommunications Research Institute (ETRI)
,
SK Telecom
|
Q10/15
|
2013-06-17 |
|
[ 290 ]
(Rev.1) |
Proposal to update Figure 9-1 of G.8021
|
NEC Corporation
|
Q14/15, Q10/15
|
2013-06-17 |
|
[ 289 ]
(Rev.1) |
Proposed modification of PM terminologies in G.8021
|
NEC Corporation
|
Q10/15
|
2013-06-17 |
|
[ 288 ]
(Rev.1) |
Proposed correction of MAC DA specification in G.8013
|
NEC Corporation
|
Q9/15, Q10/15
|
2013-06-17 |
|
[ 232 ]
|
Proposal on adding bandwidth degradation message in Y.1731
|
Huawei Technologies Co. Ltd.
|
Q10/15
|
2013-06-17 |
|
[ 227 ]
|
Enhancements of OTN hybrid equipment
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15, Q10/15
|
2013-06-17 |
|
[ 214 ]
|
Proposal to add HAO capable ODUflex to MPLS-TP adaptation function
|
Huawei Technologies Co. Ltd.
|
Q11/15, Q10/15
|
2013-06-17 |
|
[ 204 ]
|
Proposal to modify clause 7.1.2 for an Amendment to G.8113.1
|
Korea (Rep. of)
|
Q10/15
|
2013-06-17 |
|
[ 164 ]
|
Ethernet PM Terminologies in G.8013/Y.1731 and G.8052
|
Fujitsu Limited
|
Q14/15, Q10/15
|
2013-06-17 |
|
[ 163 ]
|
Proposed solution for SP#26 in G.8013/Y.1731 Living List
|
Fujitsu Limited
|
Q10/15
|
2013-06-17 |
|
[ 162 ]
|
Usage for MI_GAL_ENABLE in PW
|
Fujitsu Limited
|
Q14/15, Q12/15, Q10/15
|
2013-06-17 |
|
[ 161 ]
|
Comments and Proposed update OAM Process descriptions for draft G.8121.2
|
Fujitsu Limited
|
Q10/15
|
2013-06-17 |
|
[ 160 ]
|
Proposed re-structure of Clause 8.8.3 for draft G.8121.2
|
Fujitsu Limited
|
Q10/15
|
2013-06-17 |
|
[ 159 ]
|
Proposed update items to draft G.8121.1 (Clause 8 and 9)
|
Fujitsu Limited
|
Q10/15
|
2013-06-17 |
|
[ 158 ]
(Rev.1) |
Proposed Definitions and Abbreviations to draft G.8121.1
|
Fujitsu Limited
|
Q10/15
|
2013-06-17 |
|
[ 157 ]
|
Comments and proposed update for draft revised G.8121
|
Fujitsu Limited
|
Q10/15
|
2013-06-17 |
|
[ 156 ]
|
Proposed MPLS-TP Linear protection models for Appendix in G.8121
|
Fujitsu Limited
|
Q9/15, Q10/15
|
2013-06-17 |
|
[ 76 ]
|
Proposal to change the approval process for G.8113.1 and G.8113.2 from TAP to AAP
|
Canada
|
Q10/15
|
2013-06-13 |
|
[ 60 ]
(Rev.1-3) |
Comments on CCCV mode in G.8121.2
|
FiberHome Technologies Group
|
Q10/15
|
2013-06-13 |
|
[ 18 ]
|
Text Changes in G.8021 for At Risk signalling
|
Cisco Systems, Inc.
|
Q9/15, Q14/15, Q10/15
|
2013-05-31 |
|
[ 17 ]
|
Text changes in Y.1731 for At Risk signalling
|
Cisco Systems, Inc.
|
Q9/15, Q10/15
|
2013-05-31 |
|
[ 16 ]
|
"At Risk" signalling in Y.1731 Ethernet OAM
|
Cisco Systems, Inc.
|
Q9/15, Q14/15, Q10/15
|
2013-05-31 |
|
[ 14 ]
|
LCK/AIS Reception Process in G.8121.2
|
Cisco Systems, Inc.
|
Q9/15, Q10/15
|
2013-05-29 |
|
[ 12 ]
|
Clarification regarding Dataplane Loopback in G.8121.2
|
Cisco Systems, Inc.
|
Q9/15, Q10/15
|
2013-05-29 |
|
[ 11 ]
|
Clarification regarding Dataplane Loopback in G.8121
|
Cisco Systems, Inc.
|
Q9/15, Q10/15
|
2013-05-29 |
|
[ 10 ]
|
Definition of Diagnostic Adapted Information in G.8121
|
Cisco Systems, Inc.
|
Q9/15, Q12/15, Q10/15
|
2013-05-29 |
|
[ 9 ]
|
Description of Sub-processes in G.8121.2
|
Cisco Systems, Inc.
|
Q9/15, Q10/15
|
2013-05-29 |
|
[ 8 ]
|
Comparison of sub-process in Clause 8.8 between G.8121.1 and G.8121.2
|
Cisco Systems, Inc.
|
Q9/15, Q10/15
|
2013-05-29 |
|
[ 7 ]
|
Proposed Text for Clauses 3 and 5 in G.8121.2
|
Cisco Systems, Inc.
|
Q9/15, Q10/15
|
2013-05-29 |
|
[ 6 ]
|
Minor corrections in Y.1731 Clause 9
|
Cisco Systems, Inc.
|
Q10/15
|
2013-05-28 |
|
[ 5 ]
|
Allocation of Y.1731 TLV Types for MEF Control Protocols
|
Alcatel-Lucent USA Inc.
,
Cisco Systems, Inc.
|
Q9/15, Q10/15
|
2013-05-28 |
|
[ 4 ]
|
Assigning Y.1731 OpCodes for MEF Control Protocols
|
Alcatel-Lucent USA Inc.
,
Cisco Systems, Inc.
|
Q9/15, Q10/15
|
2013-05-28 |
Resultats:133 documents Résultats :
Précédent -
1 -
2 -
3
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):