Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 1813 ]
|
Observed GPS UTC information malfunction - for information
|
Orange
|
Q13/15
|
2016-02-02 |
|
[ 1812 ]
|
G.fast: G.9701 test parameters text improvements
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1811 ]
|
Proposal for G.654.E fibre
|
OFS Fitel, LLC
|
Q6/15, Q5/15
|
2016-02-02 |
|
[ 1810 ]
|
G.fast: Various text updates to G.9701 Amd1 Low power mode
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1809 ]
|
G.fast: Proposal to restrict upstream transmit power for 8dBm profile
|
Broadcom Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1808 ]
|
G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1807 ]
|
G.vdsl: Mis-estimation of SNR during MEDLEY
|
Broadcom Corporation
,
Intel Corporation
,
Qualcomm, Inc.
|
Q4/15
|
2016-02-02 |
|
[ 1806 ]
|
Future work on G.fast recommendations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1805 ]
|
G.fast, Editorial Correction to Figure Z-2.1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1804 ]
|
G.fast: G.fast XLOG test parameter
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1803 ]
|
G.vlc: Modulations formats for G.vlc
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1802 ]
|
G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1801 ]
|
G.ploam, G.fast: Clarification on Unavailable State for corrigendum
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1800 ]
|
G.ploam: Test parameter update time stamps in G.997.2 Amd1
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1799 ]
|
G.fast, G.ploam: Corrigenda to G.9701 and G.997.2
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1798 ]
|
G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1.
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1797 ]
|
G.ploam: Missing lom failure in G.997.1
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1796 ]
|
Considerations on the evolution of Module Framer and DSP Framer Interfaces (MFI/DFI)
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-02 |
|
[ 1795 ]
|
G.hn: On the use of G.hn over twisted pair cables
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1794 ]
|
Cascaded and nested protection
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15, Q11/15
|
2016-02-02 |
|
[ 1793 ]
|
Optical Media SDN Control Dependencies
|
Xtera Communications, Inc.
|
Q14/15, Q12/15
|
2016-02-02 |
|
[ 1792 ]
|
G.vector: Considerations about Multi-Vendor Vectoring standardization
|
Telecom Italia S.p.A.
|
Q4/15
|
2016-02-02 |
|
[ 1791 ]
|
G.fast: On data rate reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1790 ]
|
Test result for multi-domain nested protection
|
China Unicom
|
Q9/15
|
2016-02-02 |
|
[ 1789 ]
|
G.hn: Implementation on the agreements on centralized coordination of neighbouring domains
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1788 ]
|
Test result for multi-domain cascaded protection
|
China Unicom
|
Q9/15
|
2016-02-02 |
|
[ 1787 ]
|
Proposal for TIGAV transmission method
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1786 ]
|
G.hn: Some considerations on PSD ceiling use in G.hn framework - Continuation
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1785 ]
|
Alarm processing in G.asdtn and G.gim
|
ZTE Corporation
|
Q14/15, Q12/15
|
2016-02-02 |
|
[ 1784 ]
|
Proposal on dual rate PMD reference design for XGS-PON
|
FiberHome Technologies Group
|
Q2/15
|
2016-02-02 |
|
[ 1783 ]
|
G.fast: Upstream Hlog reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1782 ]
|
G.ploam, Capability reporting in G.997.1 and G.997.2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1781 ]
(Rev.1) |
Consideration for upstream dual-rate XGS-PON
|
FiberHome Technologies Group
|
Q2/15
|
2016-02-02 |
|
[ 1780 ]
|
G.primex: Ask for consent and determination
|
STMicroelectronics
|
Q15/15
|
2016-02-02 |
|
[ 1779 ]
|
G.654 revision proposal incorporating a large Aeff fibre for terrestrial networks
|
Corning Incorporated
|
Q5/15
|
2016-02-02 |
|
[ 1778 ]
|
Comments to the editor proposed revisions for ITU-T Recommendation G.652
|
Corning Incorporated
|
Q5/15
|
2016-02-02 |
|
[ 1777 ]
|
Proposed changes to CLPAJ and NTT revised proposal on chromatic dispersion specifications of G.652.D fibre
|
Corning Incorporated
|
Q5/15
|
2016-02-02 |
|
[ 1776 ]
|
Proposal for revising Appendix I of ITU-T Recommendation G.652 revision
|
Corning Incorporated
,
OFS Fitel, LLC
|
Q6/15, Q5/15
|
2016-02-02 |
|
[ 1775 ]
|
G.vlc: Some consideration on G.vlc use cases
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1774 ]
|
On G.fast based solution for Coax application
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-02-02 |
|
[ 1773 ]
|
G.vlc: Connecting a G.hn-AFE to a LED-based VLC transceiver
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1772 ]
|
Holdover Scenarios with eEEC Clock
|
Rakon Limited
|
Q13/15
|
2016-02-02 |
|
[ 1771 ]
|
Option 2 clocks for eEEC
|
Rakon Limited
|
Q13/15
|
2016-02-02 |
|
[ 1770 ]
|
Withdrawn by submitter
|
N/A
|
|
2016-02-02 |
|
[ 1769 ]
|
Considerations about G.metro system capacity for mobile front-hauling.
|
Telecom Italia S.p.A.
|
Q6/15
|
2016-02-02 |
|
[ 1768 ]
|
Architecture discussion of G.metro
|
China Unicom
|
Q6/15
|
2016-02-02 |
|
[ 1767 ]
|
Synchronization performance monitoring with Probe
|
ADVA Optical Networking
,
China Unicom
|
Q13/15
|
2016-02-02 |
|
[ 1766 ]
|
XGS-PON TC considerations on XGS-PON and XG-PON1 co-existence
|
ZTE Corporation
,
China Unicom
|
Q2/15
|
2016-02-02 |
|
[ 1765 ]
(Rev.1) |
Proposal of adding PW linear protection to G.8131
|
Electronics and Telecommunications Research Institute (ETRI)
,
Telecom Italia S.p.A.
|
Q9/15
|
2016-02-02 |
|
[ 1764 ]
|
Proposal for NG-PON2 amendment on channel bonding
|
ZTE Corporation
|
Q2/15
|
2016-02-02 |
Resultats:2210 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):