Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Resultats:1868 documents
Résultats :   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 1846 ]  
 
2016-02-02 Microsemi Corporation   General edits to Amd [G.8275.1]     Q13/15  
[ 1845 ]  
 
2016-02-02 Microsemi Corporation   Indicating Acquiring state or Synchronization Certain [G.8275.1, G.8275.2]     Q13/15  
[ 1844 ]  
 
2016-02-02 Deutsche Telekom AG   EVM-related 100G measurements and analysis for Black Link applications     Q6/15  
[ 1843 ]  
 
2016-02-02 Microsemi Corporation   Merging T-TSC-A, T-BC-P & T-TSC-P Model [G.8273.4]     Q13/15  
[ 1842 ]  
 
2016-02-02 Microsemi Corporation   Static Unicast Permitted [G.8265.1]     Q13/15  
[ 1841 ]  
 
2016-02-02 Microsemi Corporation   Parameter C Exceptions [G.8262.1]     Q13/15  
[ 1840 ]  
 
2016-02-02 Proximus PLC   G.fast: Proximus requirements for G.fast operation on coax and CAT5 wires up to at least 150 meters     Q4/15  
[ 1839 ]  
 
2016-02-02 Korea Advanced Institute of Science and Technology (KAIST)   Injection seeded DWDM system for 2.5 Gb/s transmission     Q6/15  
[ 1838 ]  
 
2016-02-02 Futurewei Technologies US R&D Center , Metanoia Technologies, Inc.   G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission     Q4/15  
[ 1837 ]  
 
2016-02-02 Microsemi Corporation   Proposed definition and text for ODUCn GMP ?CnD CRC-9 overhead in G.709     Q11/15  
[ 1836 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: Proposed Dimming Control Scheme for Low-Speed VLC     Q18/15  
[ 1835 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: OOK for Indoor Low-Speed VLC     Q18/15  
[ 1834 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: On Optical Wireless Communication Channel Model     Q18/15  
[ 1833 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: OFDM with Dimming Control for High-Speed VLC     Q18/15  
[ 1832 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: OFDM for Indoor High-Speed VLC     Q18/15  
[ 1831 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: Multiple Asymmetrically Clipped Optical OFDM     Q18/15  
[ 1830 ]  
 
2016-02-02 Futurewei Technologies US R&D Center   G.vlc: Feasibility of Specifying VLC as a Profile of G.hn Recommendations     Q18/15  
[ 1829 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   GPON Time Error Transfer performance and interface mapping     Q13/15  
[ 1828 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   Transport / Access Time Phase HRM     Q13/15  
[ 1827 ]  
 
2016-02-02 China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , Orange   Transmission of non-G.8275.1 PTP messages     Q13/15  
[ 1826 ]  
 
2016-02-02 Huawei Technologies Co., Ltd. , China Mobile Communications Corporation , Orange   Extended SSM message of OTN     Q13/15, Q11/15  
[ 1825 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   Frequency and phase/time Synchronization of partial scenario     Q13/15  
[ 1824 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   PRTC+ MTIE and TDEV masks     Q13/15  
[ 1823 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   New Simulation Results for RMS Frequency Offset for Transport of a CPRI Client over OTN     Q13/15, Q11/15  
[ 1822 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   Analysis of RMS Frequency Offset for a CPRI Client Transported over OTN - Computational Considerations     Q13/15, Q11/15  
[ 1821 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   Consideration of CPRI clock transport over OTN     Q13/15, Q11/15  
[ 1820 ]  
 
2016-02-02 China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   ToD protocol     Q13/15  
[ 1819 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   Wander Accumulation Simulation Results for Transport of a 1 GB Ethernet Client over B100G OTN based on Multiple Replications     Q13/15  
[ 1818 ]  
 
2016-02-02 Huawei Technologies Co., Ltd.   10Mhz interface     Q13/15  
[ 1817 ]  
 
2016-02-02 Broadcom Corporation , Sckipio Technologies S.I. Ltd.   G.fast: Reduction of number VF samples reporting formats     Q4/15  
[ 1816 ]  
 
2016-02-02 Broadcom Corporation , Sckipio Technologies S.I. Ltd.   G.fast: Clarification on byte order in SOC and EOC messages.     Q4/15  
[ 1815 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   OOC-PSD mask in NG-PON2     Q2/15  
[ 1814 ]  
 
2016-02-02 Orange   Proposal precautions for the use of GNSS receivers     Q13/15  
[ 1813 ]  
 
2016-02-02 Orange   Observed GPS UTC information malfunction - for information     Q13/15  
[ 1812 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: G.9701 test parameters text improvements     Q4/15  
[ 1811 ]  
 
2016-02-02 OFS Fitel, LLC   Proposal for G.654.E fibre     Q6/15, Q5/15  
[ 1810 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: Various text updates to G.9701 Amd1 Low power mode     Q4/15  
[ 1809 ]  
 
2016-02-02 Broadcom Corporation   G.fast: Proposal to restrict upstream transmit power for 8dBm profile     Q4/15  
[ 1808 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter     Q4/15  
[ 1807 ]  
 
2016-02-02 Broadcom Corporation , Intel Corporation , Qualcomm, Inc.   G.vdsl: Mis-estimation of SNR during MEDLEY     Q4/15  
[ 1806 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   Future work on G.fast recommendations     Q4/15  
[ 1805 ]  
 
2016-02-02 British Telecommunications Public Ltd. Co. (BT Plc)   G.fast, Editorial Correction to Figure Z-2.1     Q4/15  
[ 1804 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast: G.fast XLOG test parameter     Q4/15  
[ 1803 ]  
 
2016-02-02 Marvell Semiconductor Inc.   G.vlc: Modulations formats for G.vlc     Q18/15  
[ 1802 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2     Q4/15  
[ 1801 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam, G.fast: Clarification on Unavailable State for corrigendum     Q4/15  
[ 1800 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam: Test parameter update time stamps in G.997.2 Amd1     Q4/15  
[ 1799 ]  
 
2016-02-02 Alcatel-Lucent International   G.fast, G.ploam: Corrigenda to G.9701 and G.997.2     Q4/15  
[ 1798 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1.     Q4/15  
[ 1797 ]  
 
2016-02-02 Alcatel-Lucent International   G.ploam: Missing lom failure in G.997.1     Q4/15  
Resultats:1868 documents
Résultats :   -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2016-06-17