Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 885 ]
|
Consideration of CPRIm over OTN
|
Fujitsu Limited
|
Q11/15
|
2014-11-10 |
|
[ 884 ]
|
Comments on Automatic discovery of the SDTN
|
China Unicom
,
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2014-11-09 |
|
[ 883 ]
|
Suggestion to section 10 of G.asdtn
|
China Unicom
,
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2014-11-09 |
|
[ 882 ]
|
Comments on Section 7.3 of G.asdtn
|
China Telecommunications Corporation
,
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2014-11-09 |
|
[ 881 ]
|
Inputs to G.astdn Section 9.1
|
China Telecommunications Corporation
,
FiberHome Technologies Group
|
Q14/15, Q12/15
|
2014-11-09 |
|
[ 880 ]
|
Amendment 2 to Recommendation ITU-T G.8271.1/Y. 1366.1: clarifications
|
Telefon AB - LM Ericsson
|
Q13/15
|
2014-11-09 |
|
[ 879 ]
|
BMCA in G.8275.2
|
Telefon AB - LM Ericsson
|
Q13/15
|
2014-11-09 |
|
[ 878 ]
|
High frequency noise measurement interval in G.8271.1 and G.8273.2
|
Telefon AB - LM Ericsson
|
Q13/15
|
2014-11-09 |
|
[ 877 ]
|
PTP over LAG and potential impacts on G.8275.1
|
Telefon AB - LM Ericsson
|
Q13/15
|
2014-11-09 |
|
[ 876 ]
|
EECv2 specification and synchronization over OTN
|
Deutsche Telekom AG Standardization
|
Q13/15
|
2014-11-09 |
|
[ 875 ]
|
Use cases for EECv2 specification
|
Deutsche Telekom AG Standardization
|
Q13/15
|
2014-11-09 |
|
[ 874 ]
|
PRTC ensemble type 1 (GNSS+Cs) performance specification
|
Deutsche Telekom AG Standardization
|
Q13/15
|
2014-11-09 |
|
[ 873 ]
|
PRTC ensemble function types to be specified
|
A1 Telekom Austria AG
,
Deutsche Telekom AG Standardization
,
Orange
|
Q13/15
|
2014-11-09 |
|
[ 872 ]
|
Synchronization Network Migration and need for PRTC ensemble functions
|
Deutsche Telekom AG Standardization
|
Q13/15
|
2014-11-09 |
|
[ 871 ]
|
The OChCn signal should be updated into G. 874
|
Ministry of Industry and Information Technology (MIIT)
,
FiberHome Technologies Group
|
Q14/15
|
2014-11-09 |
|
[ 870 ]
|
The OTUCn signal should be updated into G. 874
|
Ministry of Industry and Information Technology (MIIT)
,
FiberHome Technologies Group
|
Q14/15
|
2014-11-09 |
|
[ 869 ]
|
considerations of 5G tribslots or 10G tribslots in B100G
|
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-11-09 |
|
[ 868 ]
|
The proposal about adding an note to the 15.7.2.4 of G.709
|
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-11-09 |
|
[ 867 ]
|
Appendix of G.709 - considerations of phase/time synchronization over OTN
|
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-11-09 |
|
[ 866 ]
|
G.654 revision proposal incorporating a large Aeff fibre for terrestrial networks
|
Corning Incorporated
|
Q6/15, Q5/15
|
2014-11-09 |
|
[ 865 ]
|
Updated revision proposal for G.652
|
Corning Incorporated
|
Q6/15, Q5/15, Q2/15
|
2014-11-09 |
|
[ 864 ]
|
Withdrawn
Duplicate of C-0791
|
N/A
|
|
2014-11-09 |
|
[ 863 ]
|
Withdrawn
Duplicate of C-0790
|
N/A
|
|
2014-11-09 |
|
[ 862 ]
|
Proposed material for draft new Recommendation G.gim "Generic Protocol-Neutral Information Model for Transport Resources"
|
Alcatel-Lucent USA Inc.
,
Deutsche Telekom AG Standardization
,
Ericsson Canada, Inc.
|
Q14/15
|
2014-11-09 |
|
[ 861 ]
|
Load balance method of SDN controller for high scalability on carrier transport network
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q14/15, Q12/15
|
2014-11-09 |
|
[ 860 ]
(Rev.1) |
Study points of intelligent data plane recovery based on centralized controller
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q14/15, Q12/15
|
2014-11-09 |
|
[ 859 ]
|
Modifications to Maximum Spectral Excursion for Consideration for G.989.2 amendment 1
|
Calix Networks, Inc.
,
Finisar Corporation
,
Kaiam Europe ltd.
|
Q2/15
|
2014-11-08 |
|
[ 858 ]
|
G.fast, G.ploam: Numbering of the initialization signals/stages for reporting in DPU-MIB
|
Alcatel-Lucent International
|
Q4/15
|
2014-11-07 |
|
[ 857 ]
|
G.fast, G.ploam: Additional G.9701 primitives to support PM in G.997.2
|
Alcatel-Lucent International
|
Q4/15
|
2014-11-07 |
|
[ 856 ]
|
G.ploam: Updates to the draft G.997.2 Recommendation
|
Alcatel-Lucent International
|
Q4/15
|
2014-11-07 |
|
[ 855 ]
|
G.ploam, G.fast: Management of service data rates as related to DRA functionality
|
Alcatel-Lucent International
|
Q4/15
|
2014-11-07 |
|
[ 854 ]
|
G.vdsl: A new Annex for enhanced data rates with vectoring compatibility with profile 17a
|
Alcatel-Lucent International
|
Q4/15
|
2014-11-07 |
|
[ 853 ]
|
G.ploam: YANG leafs from G.997.2
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2014-11-07 |
|
[ 852 ]
|
G.vdsl: Working text for a new Annex for enhanced data rates with vectoring compatibility with profile 17a
|
Alcatel-Lucent International
|
Q4/15
|
2014-11-07 |
|
[ 851 ]
|
G.ploam: Proposal to define a bit in XTSE to indicate G.fast
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2014-11-07 |
|
[ 850 ]
|
Polarization Demultiplexing of Polarization Multiplexed Optical Signals
|
Keysight Technologies Deutschland GmbH
|
Q6/15
|
2014-11-07 |
|
[ 849 ]
|
G.vdsl: Managing Showtime-Adaptive Virtual Noise (SAVN)
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2014-11-07 |
|
[ 848 ]
|
MIP Classes of G.8152
|
FiberHome Technologies Group
|
Q14/15
|
2014-11-07 |
|
[ 847 ]
|
Operation and Data Type of MaintenanceEntityGroupEndPointControl in G.8152
|
FiberHome Technologies Group
|
Q14/15
|
2014-11-07 |
|
[ 846 ]
(Rev.1) |
Generic shaping/conditioning requirements for DCN
|
FiberHome Technologies Group
|
Q14/15
|
2014-11-07 |
|
[ 845 ]
|
An operator's view on G.metro topic
|
SOFTBANK TELECOM Corp.
|
Q6/15
|
2014-11-07 |
|
[ 844 ]
|
Consideration on an optical parameter for G.metro
|
KDDI Corporation
|
Q6/15
|
2014-11-07 |
|
[ 843 ]
|
Comments on G.7712
|
Fujitsu Limited
|
Q14/15
|
2014-11-07 |
|
[ 842 ]
|
Comments on G.8011
|
Fujitsu Limited
|
Q10/15
|
2014-11-07 |
|
[ 841 ]
|
Comments on ETH-BN
|
Fujitsu Limited
|
Q10/15
|
2014-11-07 |
|
[ 840 ]
|
Proposed Solution to SP#12 in G.8121 Living List
|
Fujitsu Limited
|
Q10/15
|
2014-11-07 |
|
[ 839 ]
|
Proposed Solution to SP#11 in G.8121 Living List
|
Fujitsu Limited
|
Q14/15, Q10/15
|
2014-11-07 |
|
[ 838 ]
|
Proposed Solution to SP#10 in G.8121 Living List
|
Fujitsu Limited
|
Q14/15, Q10/15
|
2014-11-07 |
|
[ 837 ]
|
Proposed Solution to SP#9 in G.8121 Living List
|
Fujitsu Limited
|
Q14/15, Q10/15
|
2014-11-07 |
|
[ 836 ]
|
Proposed update in G.8112
|
Fujitsu Limited
|
Q10/15
|
2014-11-07 |
Resultats:2210 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):