Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2014-03-24 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C (2014-03-24) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Réunion  du 2014-03-24 au 2014-04-04

Lieu : Suisse [Genève]

Autres réunions : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Resultats:26 documents
Contributions  [ Source: FiberHome Technologies Group ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 742 ]  
 
Efficient mapping of CPRI over ODUflex     FiberHome Technologies Group , IP Light , OKI Electric Industry Company Ltd. (OKI)   Q11/15   2014-03-11
[ 739 ]  
(Rev.1) 
Proposal of new recommendation on studying wavelength selective optical distribution networks and related system in Q2/SG15     China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q2/15   2014-03-11
[ 708 ]  
 
Proposal of starting a new work item or modify the existing recommendations on optical layer protection     China Unicom , FiberHome Technologies Group   Q9/15   2014-03-11
[ 650 ]  
 
Consideration on LRM in Transport SDN Controller     FiberHome Technologies Group   Q14/15, Q12/15   2014-03-10
[ 649 ]  
 
The future of management and SDN controller     FiberHome Technologies Group   Q14/15, Q12/15   2014-03-10
[ 648 ]  
 
Consideration for CCN function model in SDN network     FiberHome Technologies Group   Q14/15   2014-03-10
[ 628 ]  
 
Proposal for studying intelligent node elements in optical fibre networks     China , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q16/15   2014-03-10
[ 576 ]  
 
Proposed updates to currentProblemList in G.8152     FiberHome Technologies Group   Q14/15   2014-03-10
[ 575 ]  
 
Proposed update MI list to On-demand and Pro-active measurement object class in G.8152     FiberHome Technologies Group   Q14/15   2014-03-10
[ 574 ]  
 
The proposal about the allocation of OTN Sy nchronisation Message channel (OSMC)     FiberHome Technologies Group   Q11/15   2014-03-10
[ 573 ]  
 
The proposal about the value of K(OTUk) to support OSMC     FiberHome Technologies Group   Q11/15   2014-03-10
[ 572 ]  
 
The method about the frequency of PTP packet in the OSMC     FiberHome Technologies Group   Q11/15   2014-03-10
[ 571 ]  
 
Consideration on the mapping of an ODUj frame into the OPUCn payload     FiberHome Technologies Group   Q11/15   2014-03-10
[ 570 ]  
(Rev.1) 
consideration of recovery network sinario in MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 569 ]  
 
Different switching types in each domain of MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 568 ]  
(Rev.1) 
Consideration of Network Objectives in the latest draft of G.mdsp     FiberHome Technologies Group   Q9/15   2014-03-10
[ 567 ]  
 
Measurement results for spectral excursion in 100G DP-QPSK application     FiberHome Technologies Group   Q6/15   2014-03-10
[ 566 ]  
+Add.1 
Proposal to start a new work item on optical distribution networks and related system based on ultra dense wavelength division multiplexing  
Addendum 1 to C-0566 is provided by TSB to correct contact information.
 
FiberHome Technologies Group   Q2/15   2014-03-10
[ 565 ]  
 
Analysis of relationship of NM/Controllerand Application Scenario     China Mobile Communications Corporation , FiberHome Technologies Group   Q14/15, Q12/15   2014-03-10
[ 560 ]  
 
Proposal to define and describe wavelength management and control channel in G.multi     FiberHome Technologies Group   Q2/15   2014-03-10
[ 559 ]  
 
Proposal on G.989.2 Amendment for dual-rate PMD implementation     FiberHome Technologies Group   Q2/15   2014-03-10
[ 557 ]  
 
The possibility of CPRI signal transmission over TWDM-PON system in G.989.3     FiberHome Technologies Group   Q2/15   2014-03-10
[ 553 ]  
 
Proposal for new test methods of Hydrogen Aging     FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT)   Q5/15   2014-03-10
[ 550 ]  
 
Drafting proposal of new recommendation L.91     FiberHome Technologies Group   Q16/15   2014-03-10
[ 461 ]  
 
Hierarchical connection control in Transport SDN     China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q14/15, Q12/15   2014-03-06
[ 460 ]  
 
Interaction models between SDN controllers in multi-domain transport network     China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q14/15, Q12/15   2014-03-06
Resultats:26 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-4-29