Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2013-07-01 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C (2013-07-01) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Réunion  du 2013-07-01 au 2013-07-12

Lieu : Suisse [Genève]

Autres réunions : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Resultats:440 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 165 ]  
 
Proposed Rec. G.959.1 application code for long-haul 100G IrDI using APD receiver     Finisar Corporation   Q6/15   2013-06-17
[ 164 ]  
 
Ethernet PM Terminologies in G.8013/Y.1731 and G.8052     Fujitsu Limited   Q14/15, Q10/15   2013-06-17
[ 163 ]  
 
Proposed solution for SP#26 in G.8013/Y.1731 Living List     Fujitsu Limited   Q10/15   2013-06-17
[ 162 ]  
 
Usage for MI_GAL_ENABLE in PW     Fujitsu Limited   Q14/15, Q12/15, Q10/15   2013-06-17
[ 161 ]  
 
Comments and Proposed update OAM Process descriptions for draft G.8121.2     Fujitsu Limited   Q10/15   2013-06-17
[ 160 ]  
 
Proposed re-structure of Clause 8.8.3 for draft G.8121.2     Fujitsu Limited   Q10/15   2013-06-17
[ 159 ]  
 
Proposed update items to draft G.8121.1 (Clause 8 and 9)     Fujitsu Limited   Q10/15   2013-06-17
[ 158 ]  
(Rev.1) 
Proposed Definitions and Abbreviations to draft G.8121.1     Fujitsu Limited   Q10/15   2013-06-17
[ 157 ]  
 
Comments and proposed update for draft revised G.8121     Fujitsu Limited   Q10/15   2013-06-17
[ 156 ]  
 
Proposed MPLS-TP Linear protection models for Appendix in G.8121     Fujitsu Limited   Q9/15, Q10/15   2013-06-17
[ 155 ]  
 
Comments on draft G.808.2     Fujitsu Limited   Q9/15   2013-06-17
[ 154 ]  
 
Consideration on the notification of availability for ODU SMP     Fujitsu Limited   Q9/15   2013-06-17
[ 153 ]  
 
Extension to G.8273 Annex B to address the combined 'PRTC + T-GM' case     Calnex Solutions Limited , Deutsche Telekom AG   Q13/15   2013-06-16
[ 152 ]  
 
G.8260 & G.8273: Practical considerations in doing Constant Time Error measurements.     Calnex Solutions Limited   Q13/15   2013-06-16
[ 151 ]  
 
The consideration on the interface between SDN controller and transport NE     China Telecommunications Corporation   Q14/15, Q12/15   2013-06-16
[ 150 ]  
 
The consideration on the relationship between the network operating system (OS) in SDN and EMS/NMS in transport network     China Telecommunications Corporation   Q14/15, Q12/15   2013-06-16
[ 149 ]  
 
Use cases for transport SDN     China Telecommunications Corporation   Q14/15, Q12/15   2013-06-16
[ 148 ]  
 
Proposal on initiating a new work item on transport SDN     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Telecom Italia S.p.A. , ZTE Corporation   Q14/15, Q12/15   2013-06-16
[ 147 ]  
 
T-GM: types, PRTC integration and performance     A1 Telekom Austria AG , China Mobile Communications Corporation , Deutsche Telekom AG , Orange   Q13/15   2013-06-16
[ 146 ]  
 
Consideration on per-OCh monitor function for OTN beyond 100G interface     KDDI Corporation   Q11/15   2013-06-16
[ 145 ]  
 
ODU SMP Activation Time     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-16
[ 144 ]  
 
Improved Encoding/processing of Messages for 1-Stage ODU SMP Protocol     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2013-06-16
[ 143 ]  
 
Determining the Time Position of Upstream Probe Sequence     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 142 ]  
 
G.fast: On Discontinuous Operation     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 141 ]  
 
On Transition From L2.2 to Other States     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 140 ]  
 
Probe Sequence Modulation and Error Signal Feedback     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 139 ]  
 
On PSD Control in Vectoring     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 138 ]  
 
Asynchronous OLR for PSD Control     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 137 ]  
 
Updated PtP WDM channel plan     ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2013-06-16
[ 136 ]  
 
Figure update for Appendix VI     ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2013-06-16
[ 135 ]  
 
Raman OPP for PtP WDM     ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2013-06-16
[ 134 ]  
 
PMD values for PtP WDM     ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2013-06-16
[ 133 ]  
 
Eye mask parameters for PtP WDM     ADVA Optical Networking , Nokia Siemens Networks GmbH & Co. KG   Q2/15   2013-06-16
[ 132 ]  
 
G.bond: Shutting down some lines in a bonded group     AT&T, Inc.   Q4/15   2013-06-15
[ 131 ]  
 
Full capacity in NG-PON2 using line coding     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 130 ]  
 
Proposal to study AWG based WDM PON proposal in mobile front-haul application     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 129 ]  
 
On the editorial placement of NG-PON2 (TWDM) TC-layer specifications     Alcatel-Lucent USA Inc. , Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 128 ]  
 
On the concept of out-of-band ranging in TWDM PONs     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 127 ]  
 
Impacts of line code change on G.989.2     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 126 ]  
 
Proposed approach for work on OTN beyond 100G     ZTE Corporation   Q6/15, Q14/15, Q12/15, Q11/15   2013-06-15
[ 125 ]  
 
Proposed model for the OTUCn and OCh layer for OTN beyond 100G     China Telecommunications Corporation , China Unicom , ZTE Corporation   Q6/15, Q14/15, Q12/15, Q11/15   2013-06-15
[ 124 ]  
 
G.8275.1: Title     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 123 ]  
 
G.8275.1: Default Parameter Values     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 122 ]  
 
G.8272: Revisions to Appendix 1 to include the case of a combined PRTC/T-GM     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 121 ]  
 
G.8263: Modification to Proposed Testing Appendix     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 120 ]  
 
G.8260: The Use of Exceptions for Network Limits using FPP     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 119 ]  
 
Percentile Average Clarification in G.8260     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 118 ]  
 
FPP and Percentile of Live Network PDV     SymmetriCom, Inc.   Q13/15   2013-06-15
[ 117 ]  
 
G.poc draft proposal     Futurewei Technologies US R&D Center   Q2/15   2013-06-15
[ 116 ]  
 
Proposal to replace NG-PON2 channel plan in Appendix VII of G.989.2 draft     ADVA Optical Networking , Futurewei Technologies US R&D Center , Gemfire Europe Limited   Q2/15   2013-06-15
Resultats:440 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-4-26