Contributions |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 504 ]
|
Draft H.248.78 (ex H.248.ALG) - Clause 3: ALG definition
|
Alcatel-Lucent Deutschland
,
Alcatel-Lucent Shanghai Bell
|
Q3/16
|
2010-07-09 |
|
[ 503 ]
|
Proposed new Appendix VII to G.168 (V7) - A methodology for testing echo canceller performance under system load conditions
|
British Telecom
,
Texas Instruments
|
Q16/16
|
2010-07-09 |
|
[ 502 ]
|
Further thoughts on Multiple Application Frameworks
|
Intel
,
Cisco Systems
|
Q13/16
|
2010-07-12 |
|
[ 501 ]
|
H.IPTV-AM.1: Addition and modification to section 8 of draft Recommendation
|
IEEE
|
Q13/16
|
2010-07-09 |
|
[ 500 ]
|
Proposal for standardizing the VAD Annex of ITU-T G.720.1 as a VAD Annex of ITU-T G.729.1
|
Huawei Technologies
|
Q8/16, Q10/16
|
2010-07-08 |
|
[ 499 ]
|
G.720.1: Bit-exact evaluation for the VAD-only Annex
|
Huawei Technologies
|
Q8/16
|
2010-07-08 |
|
[ 498 ]
|
G.720.1: Proposed text for the VAD-only Annex
|
Huawei Technologies
|
Q8/16
|
2010-07-08 |
|
[ 497 ]
|
G.718: Draft of an extension for decoder-side post-processing for high frequency pitches
|
Huawei Technologies
|
Q9/16, Q10/16
|
2010-07-08 |
|
[ 496 ]
|
G.711.1-LLC: Proposed draft specification
|
Huawei Technologies
,
NTT
|
Q10/16
|
2010-07-08 |
|
[ 495 ]
+Add.1 |
Proposal to start Telepresence work in ITU-T SG 16
|
Huawei Technologies
|
Q4/16, Q24/16, Q22/16, Q21/16, Q2/16
|
2010-07-08 |
|
[ 494 ]
|
Schema change of service provider discovery information within H.IPTV-MDSD
|
ETRI
|
Q13/16
|
2010-07-08 |
|
[ 493 ]
|
Draft new Technical Paper "Selection Test Results of ITU-T G.718 (ex G.EV-VBR) and Qualification Test Results for G.729.1 (ex G.729.EV)"
|
Qualcomm
|
Q10/16
|
2010-07-08 |
|
[ 492 ]
|
H.VSprot: Proposed structure for clause 6
|
ZTE
,
China Telecom
|
Q21/16
|
2010-07-08 |
|
[ 491 ]
|
Proposal for H.264 progressive high profile
|
Nokia
|
Q6/16
|
2010-07-07 |
|
[ 490 ]
|
H.IPTV-AM.0: Proposed new text on end-user measurement function location
|
ZTE
|
Q13/16
|
2010-07-07 |
|
[ 489 ]
|
H.IPTV-AM.1: Proposed procedural flow for VoD measurement
|
ZTE
|
Q13/16
|
2010-07-07 |
|
[ 488 ]
|
H.IPTV-AM.1: Proposed procedural flow of Linear TV measurement
|
ZTE
|
Q13/16
|
2010-07-07 |
|
[ 487 ]
|
H.IPTV-AM.0: Proposed new text of configuration procedure in IPTV audience measurement
|
ZTE
|
Q13/16
|
2010-07-07 |
|
[ 486 ]
|
H.IPTV-AM.0: Proposed delay transmit for traffic control
|
ZTE
|
Q13/16
|
2010-07-07 |
|
[ 485 ]
|
H.VSprot: Proposal of signalling and protocols for camera pan-tilt-zoom control
|
ZTE
,
China Telecom
|
Q21/16
|
2010-07-07 |
|
[ 484 ]
|
H.VSprot: Proposal of signalling and protocols for playback
|
ZTE
,
China Telecom
|
Q21/16
|
2010-07-07 |
|
[ 483 ]
|
Proposed modification of F.USN-CC "Deployment guidance on USN applications and services for mitigating climate change"
|
ETRI
|
Q25/16
|
2010-07-07 |
|
[ 482 ]
|
Proposal for a new standardization initiative for the Internet of Things (IoT)
|
ETRI
|
Q25/16
|
2010-07-07 |
|
[ 481 ]
|
Use of the IEPS Call indicator and Priority indicator in H.248.1
|
Telcordia Technologies
|
Q3/16
|
2010-07-07 |
|
[ 480 ]
|
Relaxing the -2.0 dB lower requirement in the Proposed Test9b of G.168(v7)
|
LM Ericsson
|
Q16/16
|
2010-07-07 |
|
[ 479 ]
|
Considerations to the Proposed Test 5 of G.168(v7)
|
LM Ericsson
|
Q16/16
|
2010-07-07 |
|
[ 478 ]
|
Considerations to the GTN_16-19 proposal
|
LM Ericsson
|
Q16/16
|
2010-07-07 |
|
[ 477 ]
|
Proposal on a way forward for the proposed JBM standardization activity
|
LM Ericsson
|
Q10/16
|
2010-07-07 |
|
[ 476 ]
|
H.IPTV-AM.0: Proposals concerning end-user permission requirements
|
Cisco Systems
|
Q13/16
|
2010-07-07 |
|
[ 475 ]
|
H.IPTV-AM.0: Proposals regarding security
|
Cisco Systems
|
Q13/16
|
2010-07-07 |
|
[ 474 ]
|
H.IPTV-AM.1: Proposal concerning x-PVR
|
Cisco Systems
|
Q13/16
|
2010-07-07 |
|
[ 473 ]
|
H.IPTV-AM.1: Proposal concerning content identification
|
Cisco Systems
|
Q13/16
|
2010-07-07 |
|
[ 472 ]
|
H.IPTV-AM.0: Proposals concerning content identification
|
Cisco Systems
|
Q13/16
|
2010-07-07 |
|
[ 471 ]
|
H.IPTV-AM.0: Proposals concerning user permission
|
Cisco Systems
|
Q13/16
|
2010-07-07 |
|
[ 470 ]
|
HSTP.IPTV-CRTD: Proposed addition to clause 9
|
Korea (Republic of)
|
Q13/16
|
2010-07-07 |
|
[ 469 ]
|
H.IPTV-MDSD: Proposal on data schema change of service provider and service discovery information
|
Korea (Republic of)
|
Q13/16
|
2010-07-07 |
|
[ 468 ]
|
HSTP.IPTV-SBSD: Change of title and document type
|
Korea (Republic of)
|
Q13/16
|
2010-07-07 |
|
[ 467 ]
|
HSTP.IPTV-CRTD: Proposed addition to clause 6
|
Korea (Republic of)
|
Q13/16
|
2010-07-07 |
|
[ 466 ]
+Add.1 |
H.IPTV-MAFR.4: Proposed modifications (clarifications and new CSS annex)
|
NTT
|
Q13/16
|
2010-07-07 |
|
[ 465 ]
|
Proposal to start IDN work in ITU-T SG 16
|
Syrian Telecom Establishment
|
Q7/16
|
2010-07-07 |
|
[ 464 ]
|
G.711.1-SWB: Proposed draft specification for the superwideband embedded extension for ITU-T G.711.1
|
Huawei Technologies
,
ETRI
,
France Telecom Orange
,
NTT
|
Q10/16
|
2010-07-07 |
|
[ 463 ]
|
G.722-SWB: Proposed draft specification for the superwideband embedded extension for ITU-T G.722
|
Huawei Technologies
,
ETRI
,
France Telecom Orange
,
NTT
|
Q10/16
|
2010-07-07 |
|
[ 462 ]
|
F.MOCC: Proposal on one scenario of fully decentralized file sharing scenario
|
MMIT
,
P.R China
|
Q24/16
|
2010-07-07 |
|
[ 461 ]
|
F.MOCC: Proposal on one NAT traversal scenario
|
MITT
,
P.R. China
|
Q24/16
|
2010-07-07 |
|
[ 460 ]
|
F.MOCC: Proposal on one scenario for centralized/hybrid file sharing
|
MITT
,
P.R. China
|
Q24/16
|
2010-07-07 |
|
[ 459 ]
|
F.MOCC: Proposal on some general requirements
|
MIIT
,
P.R. China
|
Q24/16
|
2010-07-07 |
|
[ 458 ]
|
F.MOCC: Discussion on modification of Clause 7.5
|
MIIT
,
P.R. China
|
Q24/16
|
2010-07-07 |
|
[ 457 ]
|
H.IPTV-AM.1: Proposal on adding requirements of distribution content service and editorial modification
|
ETRI
|
Q13/16
|
2010-07-07 |
|
[ 456 ]
|
Proposal of a new work item on AM metadata for IPTV distributed content services
|
ETRI
|
Q13/16
|
2010-07-07 |
|
[ 455 ]
|
H.IPTV-AM.1: Proposal on scope
|
ETRI
|
Q13/16
|
2010-07-07 |
Resultats:954 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):