Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Période d'études 2009

Resultats:487 documents
Résultats :  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Suivant Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 2384 ]  
(Rev.1) 
Boundary clock in networks and simulations     Tellabs Oy   Q13/15   2012-08-28
[ 2383 ]  
(Rev.1) 
Boundary clock simulation model     Tellabs Oy   Q13/15   2012-08-28
[ 2381 ]  
(Rev.1) 
G.8265.1 supported duration of negotiated service     Tellabs Oy   Q13/15   2012-08-28
[ 2375 ]  
 
Cooperation of G.781 and BMCA in telecom profile for time     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2012-08-28
[ 2374 ]  
 
PDV test pattern for G.8263     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2012-08-28
[ 2362 ]  
 
Scope of G.8275.1     France Télécom Orange   Q13/15   2012-08-28
[ 2361 ]  
 
Review of G.8272 latest draft     France Télécom Orange   Q13/15   2012-08-28
[ 2360 ]  
 
G.8272: New Appendix describing possible PRTC locations     France Télécom Orange   Q13/15   2012-08-28
[ 2359 ]  
 
Results of PDV tolerance testing using sinusoidal patterns as defined in G.8263-Testing     France Télécom Orange   Q13/15   2012-08-28
[ 2358 ]  
 
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing     France Télécom Orange   Q13/15   2012-08-28
[ 2357 ]  
 
Development of a new Appendix of G.8261.1 on PDV generation testing     France Télécom Orange   Q13/15   2012-08-28
[ 2344 ]  
 
Consequence of floor delay changes under tight PLL bandwidth     RAD Data Communications, Ltd.   Q13/15   2012-08-28
[ 2343 ]  
 
The TVL of Signaling message     Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2341 ]  
 
The effect of MAC control pause operation for PTP synchronization     Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2340 ]  
 
Test error of PRTC     Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2339 ]  
 
PHY and intra-node noise error     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2338 ]  
 
Analysis about SyncE rearrangement for different message delays of G.781     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2276 ]  
 
Concerns regarding the packet selection methods for the PEC     China Unicom   Q13/15   2012-08-28
[ 2275 ]  
 
Proposals for specifying relative aspects of T-BC recommended in G.8273.2     China Unicom   Q13/15   2012-08-28
[ 2274 ]  
 
G.8273.3: Proposals about the functions of T-TC devices based on experimental results     China Unicom   Q13/15   2012-08-28
[ 2245 ]  
 
DVB_ASI Jitter Accumulation over OTN Islands     Huawei Technologies Co. Ltd. , Huawei Technologies Co. Ltd.   Q9/15, Q13/15   2012-08-28
[ 2244 ]  
 
Criterion for Minimum Detectable Floor Delay Step using minMATIE     Huawei Technologies Co. Ltd. , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2243 ]  
 
Effect of Turnaround on Time Transport Performance using PTP     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2242 ]  
 
Advantages of the Pdelay Mechanism in Time Transport using PTP for the case where SyncE is not Used for Frequency Transport     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2241 ]  
 
Discussion of T-BC/T-TSC Noise Generation for Phase/Time Synchronization using PTP without SyncE Support     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2240 ]  
 
Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2239 ]  
 
Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2238 ]  
 
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2237 ]  
 
Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2235 ]  
 
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix   Q13/15   2012-08-28
[ 2212 ]  
 
Transparent Clocks and Issues Around Perceived Layer Violations [G.8275.1]     Aviat Networks , Calnex Solutions Limited , Juniper Networks , Sprint , Vitesse Semiconductor Corporation   Q13/15   2012-08-28
[ 2195 ]  
 
Variable temperature test regime     Rakon Limited   Q13/15   2012-08-27
[ 2194 ]  
 
G.8263 Clarification     Rakon Limited   Q13/15   2012-08-27
[ 2172 ]  
 
Time sync architecture based on multiple PTP domains     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2012-08-27
[ 2171 ]  
 
Hold-off time and interactions between frequency and phase-time planes     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2012-08-27
[ 2170 ]  
 
A possible solution for multiple GMs and operator intervention     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2012-08-27
[ 2169 ]  
 
Sync OAM architecture and requirements     China Mobile Communications Corporation , ZTE Corporation   Q13/15   2012-08-27
[ 2168 ]  
 
Further analysis about BMCA of time profile     ZTE Corporation   Q13/15   2012-08-27
[ 2167 ]  
 
The mapping between ToD and PTP     ZTE Corporation   Q13/15   2012-08-27
[ 2155 ]  
 
Analysis of interactive mechanism between two layers     ZTE Corporation   Q13/15   2012-08-27
[ 2143 ]  
 
G.8273: Test methodology annex/appendix     Calnex Solutions Limited , Deutsche Telekom AG   Q13/15   2012-08-27
[ 2106 ]  
 
Architecture Considerations for Time Distribution     ADVA Optical Networking   Q13/15   2012-08-26
[ 2105 ]  
 
G.8261.1 Network limits     ADVA Optical Networking   Q13/15   2012-08-26
[ 2104 ]  
 
PTP Network Probe and PTP Clock Probe     ADVA Optical Networking   Q13/15   2012-08-26
[ 2103 ]  
 
Exact PTP clockclass values in application     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2102 ]  
 
Proposal on PTP multicast MAC address in 8275.1     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2101 ]  
 
Test and analysis of time synchronization using 1588v2 in 100G OTN long haul transport network     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2100 ]  
 
Coordinate mechanism for SyncE and PTP     China Mobile Communications Corporation   Q13/15   2012-08-26
[ 2095 ]  
 
PRTC Timing Signal Variation for a Particular Design     SymmetriCom, Inc.   Q13/15   2012-08-25
[ 2087 ]  
 
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     PMC-Sierra, Inc.   Q9/15, Q14/15, Q13/15, Q11/15   2012-08-25
Resultats:487 documents
Résultats :  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-4-27