Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2009-09-28 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2009-09-28) 

UIT-T SG15

Transport network structures

Période d'études 2009

Réunion  du 2009-09-28 au 2009-10-09

Lieu : Suisse [Genève]

Autres réunions : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-05-15  2008-12-01 

Resultats:41 documents
Contributions  [ AI/Question: 2/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 717 ]  
 
ODU TCM Layer for OTN Auto-discovery as defined in G.7714.1     Alcatel-Lucent   Q14/15, Q12/15   2009-09-20
[ 709 ]  
 
MEs for TDM pseudowire over MPLS     Huawei technologies   Q2/15   2009-09-20
[ 708 ]  
 
A Nested PON Architecture     Huawei technologies   Q2/15   2009-09-20
[ 707 ]  
 
N:1 Protection for Long Reach GPON     Huawei technologies   Q2/15   2009-09-20
[ 702 ]  
 
Description of Transparency in G.800     Huawei Technologies   Q12/15   2009-09-20
[ 683 ]  
 
G.800 Transport Entities     Huawei Technologies   Q12/15   2009-09-20
[ 662 ]  
 
Discussion on providing an accurate time synchronization service using the native capabilities of time capable network technologies.     Tellabs , France Telecom Orange   Q2/15   2009-09-20
[ 620 ]  
 
Proposed of 3R regeneration in G.872     Deutsche Telekom   Q12/15   2009-09-20
[ 619 ]  
 
OCh definitions in G.872     Deutsche Telekom   Q12/15   2009-09-20
[ 592 ]  
 
Proposal of definition of maintenance points (MEP and MIP)     NTT   Q12/15, Q10/15   2009-09-18
[ 587 ]  
 
Further consideration about subnetwork blocking resource management in G.8080     ZTE Corporation   Q12/15   2009-09-18
[ 586 ]  
 
Consideration on ODUflex resizing     ZTE Corporation   Q14/15, Q12/15, Q11/15   2009-09-18
[ 583 ]  
 
Proposals to consider resource sharing in G.8080     ZTE Corporation   Q12/15   2009-09-18
[ 569 ]  
 
Proposal of re-using equipment protection profile for supporting N:1 protection in G.984.4     Huawei Technologies   Q2/15   2009-09-18
[ 568 ]  
 
Proposal for supporting related BM-CM RE and WC-enabled RE configuration in G.984.4     Huawei Technologies   Q2/15   2009-09-18
[ 558 ]  
 
Proposal of adding GEM layer 2 service related attributions to managed entity ONT2-G     MIIT   Q2/15   2009-09-18
[ 557 ]  
 
Description & implementation examples for a WDM1r with dedicated OTDR and RF video ports     ZTE Corporation   Q2/15   2009-09-18
[ 556 ]  
 
Description & implementation examples for a WDM1r with a dedicated OTDR port     ZTE Corporation   Q2/15   2009-09-18
[ 500 ]  
 
Frequency grid for GPON wavelength converted Reach Extenders     Nortel Networks (Canada)   Q6/15, Q2/15   2009-09-17
[ 499 ]  
 
Revision of wavelength allocation grid in G.984.6Am1     Nortel Networks (Canada)   Q2/15   2009-09-17
[ 498 ]  
 
Updation of the text providing example of single fibre WC-enabled seeded RE units     Nortel Networks (Canada)   Q2/15   2009-09-17
[ 494 ]  
 
Transitional Links as SNPP Links     Nortel Networks (Canada)   Q12/15   2009-09-17
[ 467 ]  
 
Proposal to introduce multi-granularity in photonic cross-connect switching in AON/WSON     NTT   Q12/15   2009-09-16
[ 460 ]  
 
Proposed modification for G.8121 and consideration of Ethernet as MPLS-TP client     Fujitsu   Q9/15, Q14/15, Q12/15, Q10/15   2009-09-16
[ 457 ]  
 
Directory listing capability, file transfer controller in G.984.4 am 2     Ericsson   Q2/15   2009-09-16
[ 456 ]  
 
Document withdrawn     Ericsson   Q2/15   2009-09-16
[ 455 ]  
 
Additional VoIP attributes in G.984.4 am 2     Ericsson   Q2/15   2009-09-16
[ 453 ]  
 
Considerations on the description of the ODU layer network in G.872 and G.8080     Huawei Technologies   Q14/15, Q12/15   2009-09-16
[ 445 ]  
 
Management of high capacity connections in the OTN     Huawei Technologies   Q12/15   2009-09-16
[ 443 ]  
 
Text proposal to align clause 9/G.872 with draft revised G.709     Huawei Technologies   Q12/15   2009-09-16
[ 441 ]  
 
GPON over OTN mapping     Huawei Technologies , China Mobile Communications Corporation , PMC-Sierra   Q2/15, Q11/15   2009-09-16
[ 431 ]  
 
G.709 "Black Link" OTM-1r.m Interface as IrDI     AT&T   Q6/15, Q12/15, Q11/15   2009-09-16
[ 414 ]  
 
Proposal of architecture of G.omci     NTT   Q2/15   2009-09-15
[ 411 ]  
 
Sublayers and WSON in G.872     Ciena Corp   Q12/15   2009-09-15
[ 410 ]  
 
An updated Topology model for WSON     Ciena Corp   Q12/15   2009-09-15
[ 409 ]  
 
Some thoughts on Transport Entities     Ciena Corp   Q12/15   2009-09-15
[ 408 ]  
 
Characteristic Information, Sublayers and Media     Ciena Corp   Q12/15   2009-09-15
[ 401 ]  
 
Propose to add requirement of discovery support on MPLS-TP OAM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
[ 400 ]  
 
Propose to add requirement of discovery support on MPLS-TP NM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
[ 394 ]  
 
Rooted mp FDFr     Alcatel Shanghai Bell , CATR , MII   Q12/15   2009-09-14
[ 361 ]  
 
Considerations and Proposal for Using OTN for GPON Reach Extension     PMC-Sierra   Q2/15, Q11/15   2009-09-08
Resultats:41 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-6-2