Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG05 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG05  C 

UIT-T SG05

ICT and climate change

Période d'études 2009

Resultats:520 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 170 ]  
 
EMC and Safety study and proposal for L.adapterPhase2 draft     China   Q21/5   2010-11-11
[ 169 ]  
 
Proposal on output power range classification for L.adapterPhase2 draft     China   Q21/5   2010-11-11
[ 168 ]  
 
Proposal to establish a new work item on Universal Li-ion battery solution for mobile phone and other ICT device     China   Q21/5   2010-11-11
[ 167 ]  
 
Proposed structure for recommendation L.metrics (energy efficiency metrics for telecommunication equipment)     China   Q17/5   2010-11-11
[ 166 ]  
 
Propose a new Recommendation on telecommunication terminal equipment EMC     China   Q16/5   2010-11-11
[ 165 ]  
 
Mutual-disturbance Test Requirements for Performance Degradation Evaluation of Converged Terminal Devices     China   Q16/5   2010-11-11
[ 164 ]  
 
Proposal for update of Clause 8.2.5 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     ETRI   Q18/5   2010-11-11
[ 163 ]  
 
Discussion and proposal for Clause 9, "ICT project validating," of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     ETRI   Q18/5   2010-11-11
[ 162 ]  
 
Proposal for update of Clause 8 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     ETRI   Q18/5   2010-11-11
[ 161 ]  
 
Draft skeleton of new Recommendation L.DC     Telecom Italia , Huawei   Q17/5   2010-11-11
[ 160 ]  
 
First Draft of new Recommendation L. metrics     Telecom Italia , Huawei   Q17/5   2010-11-11
[ 159 ]  
 
Effect of RBWs on measured electromagnetic fields from mobile phone base station     NICT   Q3/5   2010-11-09
[ 158 ]  
 
Method for evaluating electromagnetic field in general public environment with wide frequency radio spectrum     NTT DoCoMo, Inc.   Q3/5   2010-11-09
[ 157 ]  
 
System boundaries for ICT Goods (7.2.2.2)     Huawei Technologies   Q18/5   2010-11-09
[ 156 ]  
 
Updated version of the software EMF-estimator (v 1.4.0)     Telekomunikacja Polska   Q3/5   2010-11-08
[ 155 ]  
 
Re-allocation of deliverables currently under Q17/5     Alcatel-Lucent   Q20/5, Q18/5, Q17/5   2010-11-04
[ 154 ]  
 
Measurement and analysis of electromagnetic disturbance from in-house BPL     China Telecom Corp.   Q8/5   2010-11-04
[ 153 ]  
 
Environment and climate change     Ministry PTT Dem. Rep. Congo   Q17/5   2010-11-04
[ 152 ]  
 
Preliminary Draft New Recommendation K.monitor     Telekomunikacja Polska, Poland   Q3/5   2010-10-26
[ 151 ]  
 
Document withdrawn  
Pls see TD 517 (GEN/5)
 
N/A     2010-10-25
[ 150 ]  
 
Document withdrawn  
Pls see TD 518 (GEN/5)
 
N/A     2010-10-25
[ 149 ]  
 
New chapter for draft new Recommendation ITU-T K.appl     Tyco Electronics , EPCOS AG   Q13/5   2010-09-23
[ 148 ]  
 
Proposal for a new Work Item Methodology to evaluate the GHG Impact of ICT in Cities     UK   Q18/5   2010-09-14
[ 147 ]  
 
A discussion of external coaxial cable port shield leakage     Tyco Electronics   Q4/5   2010-07-22
[ 146 ]  
 
Proposal for the Polymeric PTC section of K.appl     Tyco Electronics   Q13/5   2010-07-02
[ 145 ]  
 
Contribution sur l'Environnement et le changement climatique     Ministère des PTT Rép Dém Congo   Q17/5   2010-04-01
[ 144 ]  
 
Proposal of nominal voltage and voltage range of the Power feeding systems     NTT   Q19/5   2010-03-30
[ 143 ]  
 
Developing the contents of a ICT-GSCR document     ETRI   Q18/5   2010-03-30
[ 142 ]  
 
Proposed skeleton for L_methodology_general umbrella - Proposed skeleton with some proposed text inputs     France Telecom Orange   Q18/5   2010-03-30
[ 141 ]  
 
Resistibility Guide     France Telecom Orange , Technicolor   Q4/5   2010-03-30
[ 140 ]  
 
Some remarks regarding K.guide     ANATEL   Q3/5   2010-03-30
[ 139 ]  
 
Proposal on Reporting Format for L_Methodology ICT Goods and Services     Telefon AB - LM Ericsson   Q18/5   2010-03-30
[ 138 ]  
 
Proposal on Product System Categories to be Reflected in Structure of L_Methodology ICT Goods and Services     Telefon AB - LM Ericsson   Q18/5   2010-03-30
[ 137 ]  
 
Proposal on Modified Ways of Working for L_methodology ICT Goods and Services     Telefon AB - LM Ericsson   Q18/5   2010-03-30
[ 136 ]  
 
Proposal on Definitions of High Level Life Cycle Phases     Telefon AB - LM Ericsson   Q18/5   2010-03-30
[ 135 ]  
 
Proposal for the ICT sector definition     ETRI   Q18/5   2010-03-30
[ 134 ]  
 
Proposal for clarification of main issues to be included and discussed in the guidance of L.methodology_ICT_in_organizations     Korea (Republic of)   Q18/5   2010-03-30
[ 133 ]  
 
Proposal of text structure for L.rareMetals     Korea (Republic of)   Q21/5   2010-03-30
[ 132 ]  
 
International activities related to recycling of rare metals     Korea (Republic of)   Q21/5   2010-03-30
[ 131 ]  
 
Discussion about the scope of L.rareMetals     Korea (Republic of)   Q21/5   2010-03-30
[ 130 ]  
 
Follow-up comment and consideration of power system configuration after the submitted opinions for K.56 AAP     Korea (Republic of)   Q5/5   2010-03-30
[ 129 ]  
 
Proposals for update of Clause 7 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Korea (Republic of)   Q18/5   2010-03-30
[ 128 ]  
 
Proposal for update of Clauses 3, 4 and 6 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Korea (Republic of)   Q18/5   2010-03-30
[ 127 ]  
 
Proposal for clarification of the work scope of L.methodology_ICT_in_organizations     Korea (Republic of)   Q18/5   2010-03-30
[ 126 ]  
 
Proposal for the scope of L.methodology_ICT_in_organizations     Korea (Republic of)   Q18/5   2010-03-30
[ 125 ]  
 
Considerations for Title correction of draft recommendation L.specHVDC     Korea (Republic of)   Q19/5   2010-03-30
[ 124 ]  
 
Induced voltage measured at one end of a conductor when the other end of that conductor is earthed closely to the high-speed electrified railway     Korea (Republic of)   Q9/5   2010-03-30
[ 123 ]  
 
Consideration of nominal voltage decision DC 300V     Korea (Republic of)   Q19/5   2010-03-30
[ 122 ]  
 
Introduction of safety requirement for surge suppressors in audio/video, information and communication technology equipments     Korea (Republic of)   Q11/5   2010-03-30
[ 121 ]  
 
Proposal for complementary input on '2010 Best Practices for the EU Code of Conduct on Data Centres'     Korea (Republic of)   Q19/5   2010-03-30
Resultats:520 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2021-02-04