Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG05 : Réunion 2010-04-12 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG05  C (2010-04-12) 

UIT-T SG05

ICT and climate change

Période d'études 2009

Réunion  du 2010-04-12 au 2010-04-16

Lieu : Argentine [Buenos Aires]

Autres réunions : 2012-10-08  2012-04-11  2011-09-20  2011-04-27  2010-11-23  2010-10-01  2010-01-19  2009-10-12  2009-05-25  2008-11-24 

Resultats:45 documents
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 145 ]  
 
Contribution sur l'Environnement et le changement climatique     Ministère des PTT Rép Dém Congo   Q17/5   2010-04-01
[ 144 ]  
 
Proposal of nominal voltage and voltage range of the Power feeding systems     NTT   Q19/5   2010-03-30
[ 143 ]  
 
Developing the contents of a ICT-GSCR document     ETRI   Q18/5   2010-03-30
[ 142 ]  
 
Proposed skeleton for L_methodology_general umbrella - Proposed skeleton with some proposed text inputs     France Telecom Orange   Q18/5   2010-03-30
[ 141 ]  
 
Resistibility Guide     France Telecom Orange , Technicolor   Q4/5   2010-03-30
[ 140 ]  
 
Some remarks regarding K.guide     ANATEL   Q3/5   2010-03-30
[ 139 ]  
 
Proposal on Reporting Format for L_Methodology ICT Goods and Services     Telefon AB - LM Ericsson   Q18/5   2010-03-30
[ 138 ]  
 
Proposal on Product System Categories to be Reflected in Structure of L_Methodology ICT Goods and Services     Telefon AB - LM Ericsson   Q18/5   2010-03-30
[ 137 ]  
 
Proposal on Modified Ways of Working for L_methodology ICT Goods and Services     Telefon AB - LM Ericsson   Q18/5   2010-03-30
[ 136 ]  
 
Proposal on Definitions of High Level Life Cycle Phases     Telefon AB - LM Ericsson   Q18/5   2010-03-30
[ 135 ]  
 
Proposal for the ICT sector definition     ETRI   Q18/5   2010-03-30
[ 134 ]  
 
Proposal for clarification of main issues to be included and discussed in the guidance of L.methodology_ICT_in_organizations     Korea (Republic of)   Q18/5   2010-03-30
[ 133 ]  
 
Proposal of text structure for L.rareMetals     Korea (Republic of)   Q21/5   2010-03-30
[ 132 ]  
 
International activities related to recycling of rare metals     Korea (Republic of)   Q21/5   2010-03-30
[ 131 ]  
 
Discussion about the scope of L.rareMetals     Korea (Republic of)   Q21/5   2010-03-30
[ 130 ]  
 
Follow-up comment and consideration of power system configuration after the submitted opinions for K.56 AAP     Korea (Republic of)   Q5/5   2010-03-30
[ 129 ]  
 
Proposals for update of Clause 7 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Korea (Republic of)   Q18/5   2010-03-30
[ 128 ]  
 
Proposal for update of Clauses 3, 4 and 6 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     Korea (Republic of)   Q18/5   2010-03-30
[ 127 ]  
 
Proposal for clarification of the work scope of L.methodology_ICT_in_organizations     Korea (Republic of)   Q18/5   2010-03-30
[ 126 ]  
 
Proposal for the scope of L.methodology_ICT_in_organizations     Korea (Republic of)   Q18/5   2010-03-30
[ 125 ]  
 
Considerations for Title correction of draft recommendation L.specHVDC     Korea (Republic of)   Q19/5   2010-03-30
[ 124 ]  
 
Induced voltage measured at one end of a conductor when the other end of that conductor is earthed closely to the high-speed electrified railway     Korea (Republic of)   Q9/5   2010-03-30
[ 123 ]  
 
Consideration of nominal voltage decision DC 300V     Korea (Republic of)   Q19/5   2010-03-30
[ 122 ]  
 
Introduction of safety requirement for surge suppressors in audio/video, information and communication technology equipments     Korea (Republic of)   Q11/5   2010-03-30
[ 121 ]  
 
Proposal for complementary input on '2010 Best Practices for the EU Code of Conduct on Data Centres'     Korea (Republic of)   Q19/5   2010-03-30
[ 120 ]  
 
Considerations for Proposed input to SG5 Recommendations on 'Data Center Energy Efficiency'     Korea (Republic of)   Q19/5   2010-03-30
[ 119 ]  
 
Presentation on the TEER Standards Supporting Transmittal of Documents from ATIS Committee STEP-TEE on "Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting"     ATIS   Q20/5, Q19/5, Q18/5, Q17/5   2010-03-30
[ 118 ]  
 
Electromagnetic disturbance waves enter Ethernet ports in customer telecommunication equipment     NTT   Q8/5   2010-03-30
[ 117 ]  
 
Decision of nominal voltage based on compatibility requirements     KT   Q19/5   2010-03-30
[ 116 ]  
 
Working document toward draft new Recommendation K.guide     Telekomunikacja Polska   Q3/5   2010-03-30
[ 115 ]  
 
Additional supplement of smart antennas calculation for K.guide     China Mobile Communications Corporation   Q3/5   2010-03-30
[ 114 ]  
 
Proposal of evaluation of environmental impact for office space     Japan   Q18/5   2010-03-30
[ 113 ]  
 
Proposed Introduction and Scope for L.methodology_umbrella     Japan   Q18/5   2010-03-30
[ 112 ]  
 
Progress Report on the EARTH Project     Alcatel Lucent   Q18/5, Q17/5   2010-03-30
[ 111 ]  
 
Network equipment to be covered     Alcatel Lucent   Q18/5   2010-03-30
[ 110 ]  
 
External coaxial cable port test proposal     Bourns   Q4/5   2010-03-30
[ 109 ]  
 
Ethernet Field experiences     IEEE   Q4/5   2010-03-30
[ 108 ]  
 
Recommendations K.20, K.21 and K.45 - Power Contact Test Proposals     IEEE   Q4/5   2010-03-30
[ 107 ]  
 
Higher Voltage DC     France Telecom Orange   Q19/5   2010-03-30
[ 106 ]  
 
ICT environmental impact model     France Telecom Orange   Q21/5   2010-03-30
[ 105 ]  
 
Scope of Phase 2 of Universal power adapter and charger solution for mobile terminals and other ICT devices     France Telecom Orange   Q21/5   2010-03-30
[ 104 ]  
 
The impact of voltage ramp on DC powered telecommunication equipment start-up     ZTE Corporation   Q12/5   2010-03-26
[ 103 ]  
(Rev.1) 
Strengthening the refined research for the Energy Efficiency Rating of transport equipment     ZTE Corporation   Q18/5   2010-03-26
[ 102 ]  
 
Transmittal of Documents from ATIS Committee STEP-TEE on "Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting"     ATIS   Q20/5, Q19/5, Q18/5, Q17/5   2010-03-26
[ 101 ]  
 
Using data of lightning positioning system for network protection, recovery services or diagnosis by hotline services     France Telecom Orange   Q5/5   2010-03-16
Resultats:45 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-5-7