Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C 

UIT-T SG15

Infrastructures des réseaux optiques et autres réseaux de transport

Période d'études 2005

Resultats:83 documents
Résultats :  1 - 2  - Suivant Next
Contributions  [ Source: Huawei ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 850 ]  
 
G.pacmod-bis: Treatment of Quality Level Unknown in SSM function     China Academy of Telecom. Research of MII Huawei T   Q13/15   2008-02-01
[ 849 ]  
 
G.pacmod-bis: limitation of clock number in Synchronization network reference chain     China Academy of Telecom. Research of MII Huawei T   Q13/15   2008-02-01
[ 846 ]  
 
Proposed inter-domain restoration extensions for G.7713.2     China Telecom , ZTE , Huawei   Q14/15   2008-02-01
[ 845 ]  
 
Additional hard rerouting scenarios in multiple domains for G.7713     China Telecom , Huawei , ZTE , Alcatel-Lucent   Q14/15   2008-02-01
[ 837 ]  
 
Proposal of adding a subclause about RZ-AMI to Clause 7 of Sup.39  
Withdrawn - see C829
 
Huawei   Q6/15   2008-02-01
[ 836 ]  
 
Proposal of a next step for 40G format comparison  
Withdrawn - see C825
 
Huawei   Q6/15   2008-02-01
[ 835 ]  
 
Bandwidth studies by simulation for 40G modulation formats  
Withdrawn - see C817
 
Huawei   Q6/15   2008-02-01
[ 834 ]  
 
Proposal of slight wording change about ODB related description in Clause 7 of Sup.39  
Withdrawn - see C814
 
Huawei   Q6/15   2008-02-01
[ 833 ]  
 
A Fundamental Limitation of Retransmission above FEC     Huawei   Q4/15   2008-02-01
[ 832 ]  
 
G.gen, ADSL, G.vdsl: Line Driver Power Consumption and Transmit Power     Huawei   Q4/15   2008-02-01
[ 831 ]  
 
Further enhancement to Low Power Mode     Huawei   Q4/15   2008-02-01
[ 830 ]  
 
G.pacmod-bis: Test results of the new timing distribution mechanism     Huawei   Q14/15, Q13/15, Q12/15   2008-02-01
[ 829 ]  
 
Proposal of adding a subclause about RZ-AMI to Clause 7 of Sup.39     Huawei   Q6/15   2008-01-31
[ 828 ]  
 
Requirements for Network Automatic Configuration     Huawei   Q14/15, Q12/15   2008-01-31
[ 827 ]  
 
Proposal to Accomplish OTN Protection Recommendation     Huawei   Q9/15   2008-01-31
[ 826 ]  
 
Corrections to FD/FDFr Usage in G.8010     Huawei   Q12/15   2008-01-31
[ 825 ]  
 
Proposal of a next step for 40G format comparison     Huawei   Q6/15   2008-01-31
[ 824 ]  
 
Independently Transport of Four 512/513b Transcoded 10GbEs in standard ODU3     Huawei   Q11/15   2008-01-31
[ 823 ]  
 
PBB Model for G.8010     Huawei   Q12/15   2008-01-31
[ 822 ]  
 
G.800 Term for Interconnect Transport Entities     Huawei   Q12/15   2008-01-31
[ 821 ]  
 
G.800 description modification     Huawei   Q12/15   2008-01-31
[ 820 ]  
 
Composite Transport Model and Transport Resilience Description     Huawei   12/15   2008-01-31
[ 819 ]  
 
Consideration about NG OTN hierarchy     Huawei   Q11/15   2008-01-31
[ 818 ]  
 
Consideration about 40GE/100GE transport     Huawei   Q11/15   2008-01-31
[ 817 ]  
 
Bandwidth studies by simulation for 40G modulation formats     Huawei   Q6/15   2008-01-31
[ 816 ]  
 
Behaviour of Cn transport for GMP     Huawei   Q11/15   2008-01-31
[ 815 ]  
 
Annex of G.8010v2 to describe the PVT network application     Huawei , Nokia Siemens Networks   Q12/15   2008-01-31
[ 814 ]  
 
Proposal of slight wording change about ODB related description in Clause 7 of Sup.39     Huawei   Q6/15   2008-01-31
[ 813 ]  
 
2048/2049B transcoded 10GbE in ODU2     Huawei   11/15   2008-01-31
[ 812 ]  
 
T-MPLS Ring Protection Mechanisms     Huawei , China Mobile   Q9/15   2008-01-31
[ 811 ]  
 
Proposal on OAM architecture and attribute for EVPLAN services     Huawei , China Mobile   Q11/15   2008-01-31
[ 810 ]  
 
Proposal on the model and architecture of EVPLAN     Huawei , China Mobile   Q11/15   2008-01-31
[ 809 ]  
 
Considerations on deployment of T-MPLS Protection Ring     Huawei , China Mobile   Q9/15   2008-01-31
[ 808 ]  
 
Comments on protocol description and state machine of G.8032     Huawei , CATR, MII   Q9/15   2008-01-31
[ 807 ]  
 
Comments on the mechanism of G.8032     Huawei , CATR, MII   Q9/15   2008-01-31
[ 767 ]  
 
Correction to figure 10-6/G.806     Huawei   Q9/15   2008-01-31
[ 535 ]  
 
Proposal on state transition tables for T-MPLS linear protection switching     ETRI, , Huawei Technologies   Q9/15   2007-05-25
[ 471 ]  
 
VS Technical Clarification     Huawei Technologies Co., Ltd , China Telecom Co., Ltd   Q12/15   2007-05-24
[ 470 ]  
 
Trigger events for auditing process     Huawei Technologies Co., Ltd   Q14/15   2007-05-24
[ 469 ]  
 
1+1/1:1 protection switching mechanism for RMPS     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 468 ]  
 
Requirement of partial protection switching for RMPS     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 467 ]  
 
Proposal for an over-clocked OTN structure (supplement) recommendation     Huawei Technologies Co., Ltd   Q11/15   2007-05-24
[ 466 ]  
 
Proposals for multi-lane 100GE transport     Huawei   Q11/15   2007-05-24
[ 465 ]  
 
Proposal on OAM model and Ring APS for Ethernet ring protection     Huawei   Q9/15   2007-05-24
[ 464 ]  
 
Proposal on OAM Model for T-MPLS SPRing     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 463 ]  
 
Proposal for Application Code and Parameter Values in G.dapp2     MII , China Telecom, China United Telecom , China Mobile , ZTE Corporation , P.R. China Huawei Technologies Co., Ltd   Q6/15   2007-05-24
[ 462 ]  
 
Proposal for FC over T-MPLS     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 461 ]  
 
Considerations in Sync Ethernet over OTN     Huawei Technologies Co., Ltd   Q13/15, Q11/15, Q9/15   2007-05-24
[ 460 ]  
 
Consideration about the time requirement     Huawei Technologies Co., Ltd   Q13/15   2007-05-24
[ 459 ]  
 
Connections between ring nodes on T-MPLS ring     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
Resultats:83 documents
Résultats :  1 - 2  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-5-17