Contributions
[ AI/Question: Q4/15 ] |
|
Numéro
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 320 ]
|
G.vdsl: Proposal to increase the optional (1/S)max parameter
|
Assia
|
Q4/15
|
2007-05-23 |
|
[ 319 ]
|
G.ploam, G.vdsl: Self-consistent Parameter Groups
|
Assia
|
Q4/15
|
2007-05-22 |
|
[ 318 ]
|
G.vdsl: Moving forward with vectoring
|
Assia
,
Ikanos
,
Conexant
|
Q4/15
|
2007-05-22 |
|
[ 317 ]
|
VDSL2: Proposed Working Text for Accuracy of Test Parameters for VDSL2
|
Assia
|
Q4/15
|
2007-05-22 |
|
[ 316 ]
|
ADSL: Proposal for updating the Zloop range in the agreement for HLOG accuracy
|
Assia
|
Q4/15
|
2007-05-22 |
|
[ 315 ]
|
G.GEN, G.ADSL, G.VDSL: Margin Cap Mode proposals
|
Assia
|
Q4/15
|
2007-05-22 |
|
[ 313 ]
|
G.hn: Profiles
|
LSI Corporation
|
Q4/15
|
2007-05-22 |
|
[ 311 ]
|
G.hs: Proposed note for G.994.1 Amendment
|
Ikanos
|
Q4/15
|
2007-05-22 |
|
[ 309 ]
|
G.vdsl: Start-up signal for vectored DMT transmission using pilot sequences
|
Ikanos
|
Q4/15
|
2007-05-22 |
|
[ 308 ]
|
G.vdsl: Estimating SNR in the presence of slicer errors
|
Ikanos
|
Q4/15
|
2007-05-22 |
|
[ 307 ]
|
ADSL: Follow-up to Hlog Accuracy Requirements
|
Conexant Systems
|
Q4/15
|
2007-05-22 |
|
[ 305 ]
|
G.hn: Powerline Channel Models
|
Conexant Systems
|
Q4/15
|
2007-05-22 |
|
[ 304 ]
|
G.vdsl: Delay variation in physical layer retransmission
|
Ikanos
|
Q4/15
|
2007-05-27 |
|
[ 302 ]
|
G.hn: Requirements on Medium Access Control (MAC)
|
Conexant Systems
|
Q4/15
|
2007-05-22 |
|
[ 300 ]
|
G.hn: Justification for aggregate throughput and resulting data rate
|
Conexant Systems
,
Infineon Technologies North America
|
Q4/15
|
2007-05-22 |
|
[ 299 ]
|
VDSL2, PLOAM: Support of SOS
|
AT&T
|
Q4/15
|
2007-05-22 |
|
[ 298 ]
|
VDSL2: Analysis of loop reach increase due to ordered FEXT cancellation
|
AT&T
|
Q4/15
|
2007-05-22 |
|
[ 297 ]
|
VDSL2: A closed form solution for DSL MIMO performance analysis
|
AT&T
|
Q4/15
|
2007-05-22 |
|
[ 295 ]
|
G.bond: Text changes to G.998.2 discovery and pair management at the bonding layer
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2007-05-22 |
|
[ 294 ]
|
G.bond: Inconsistency of line aware ASM packet insertion and fragmentation SID requirements
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2007-05-22 |
|
[ 270 ]
|
Proposed changes on the working text for accuracy of test parameters in G.992.3
|
Infineon Technologies
|
Q4/15
|
2006-10-20 |
|
[ 269 ]
|
G.vdsl2: Method of Downstream FEXT cancellation
|
Infineon Technologies
|
Q4/15
|
2006-10-20 |
|
[ 268 ]
|
G.vdsl2: Proposal on SRA initiating mechanism
|
Infineon Technologies
|
Q4/15
|
2006-10-20 |
|
[ 264 ]
|
G.ADSL2, G.ADSL2+, G.VDSL2: Requirements for retransmission technique
|
Infineon Technologies
|
Q4/15
|
2006-10-20 |
|
[ 263 ]
|
G.hn: On the home network topology
|
Infineon Technologies
|
Q4/15
|
2006-10-20 |
|
[ 262 ]
|
G.VDSL2: Correction to the formula for computing received virtual noise from TXREFVN parameter
|
Infineon Technologies
|
Q4/15
|
2006-10-20 |
|
[ 257 ]
|
G.vdsl: VDSL2 Impulse Noise Monitor Performance/Accuracy Requirements
|
Alcatel Bell
|
Q4/15
|
2006-10-20 |
|
[ 256 ]
|
G.gen: G.vdsl: G.ploam: Full Proposed Text for VDSL2 Impulse Noise Monitor
|
Alcatel Bell
|
Q4/15
|
2006-10-20 |
|
[ 255 ]
|
G.vdsl: VDSL2 Initialization Success/Failure Code DRAFT
|
Alcatel Bell
|
Q4/15
|
2006-10-20 |
|
[ 254 ]
|
G.gen: G.vdsl: G.ploam: VDSL2 Reporting of Actual Impulse Noise Protection
|
Alcatel Bell
|
Q4/15
|
2006-10-20 |
|
[ 220 ]
|
G.VDSL2: Proposal on INM functionality for G.993.2 Amendment 1
|
Ikanos Communications
,
Conexant Systems
|
Q4/15
|
2006-10-20 |
|
[ 192 ]
(Rev.1) |
G.bond : PCS reassembly buffer size
|
Alcatel Bell
|
Q4/15
|
2006-10-20 |
|
[ 191 ]
|
ADSL: Longitudinal Conversion Loss
|
Alcatel Bell
|
Q4/15
|
2006-10-20 |
|
[ 190 ]
|
VDSL: Framer changes in OLR
|
Alcatel Bell
|
Q4/15
|
2006-10-20 |
|
[ 189 ]
|
G.bond, G.hs : Ethernet bonding initialization time
|
Alcatel Bell
|
Q4/15
|
2006-10-20 |
|
[ 177 ]
|
G.vdsl2: Pilot sequence assisted vector channel estimation
|
Upzide Labs
|
Q4/15
|
2006-10-19 |
|
[ 173 ]
|
G.hn: Next generation home networking architecture
|
CopperGate Communications
|
Q4/15
|
2006-10-19 |
|
[ 165 ]
|
ADSL: Response to Liaison CD-089R1from the DSL Forum regarding WT-100 REIN tests
|
BT
|
Q4/15
|
2006-10-19 |
|
[ 153 ]
|
VDSL2: Proposed Framework for Enabling Downstream FEXT Cancellation in VDSL2
|
Conexant Systems
|
Q4/15
|
2006-10-19 |
|
[ 149 ]
|
VDSL2: Key issues to emergency rate reduction(SOS)
|
MII China
,
Huawei Technologies
|
Q4/15
|
2006-10-19 |
|
[ 132 ]
|
VDSL2: Work Items on In-Domain FEXT Cancellation
|
MII China
,
Huawei Technologies
|
Q4/15
|
2006-10-19 |
|
[ 117 ]
|
VDSL2: Loop Diagnostic Mode: Duration of MEDLEY
|
Aware
|
Q4/15
|
2006-10-18 |
|
[ 116 ]
|
VDSL2: Proposal for a VDSL2 Data Retransmission Protocol
|
Aware
|
Q4/15
|
2006-10-18 |
|
[ 115 ]
|
ADSL2/2plus: REIN Testing
|
Aware
|
Q4/15
|
2006-10-18 |
|
[ 100 ]
|
G.vdsl, G.hs: proposed draft texts of Handshake specifications for G.993.2 Amendment 1 Annex C
|
NTT
,
Sumitomo Electrics
,
NEC
,
Fujitsu
,
ACCA Networks
|
Q4/15
|
2006-10-18 |
|
[ 90 ]
|
ADSL:G.vdsl: Control parameters and performance of a retransmission scheme
|
Broadcom
|
Q4/15
|
2006-10-18 |
|
[ 70 ]
|
VDSL2: Follow up on proposed baseline text for OLR mechanism
|
Conexant Systems
,
Ikanos Communications
|
Q4/15
|
2006-10-18 |
|
[ 69 ]
|
G.hn: The LLC sub-layer functions
|
CopperGate Communications
|
Q4/15
|
2006-10-18 |
|
[ 68 ]
|
G.vdsl2 - Revised European Operator Requirements for VDSL2 Band Plan Extensions
|
BT
,
Telefónica O2 Czech Republic
,
Deutsche Telekom
,
Swisscom
,
Teliasonera
,
Telenor
,
Telecom Italia
,
France Telecom
|
Q4/15
|
2006-10-18 |
|
[ 66 ]
|
G.VDSL2: Proposed update of G.993.2 Annex A
|
Ikanos
,
Infineon
,
AT&T
,
Conexant
,
Aktino
|
Q4/15
|
2006-10-17 |
Resultats:205 documents Résultats :
Précédent -
1 -
2 -
3 -
4 -
5
- Suivant
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):